Three-Question Matrix and Reference Checks RFP Number: R P1 RFP Name: Design Services for Wiles Road from University Drive to Riverside Drive

Size: px
Start display at page:

Download "Three-Question Matrix and Reference Checks RFP Number: R P1 RFP Name: Design Services for Wiles Road from University Drive to Riverside Drive"

Transcription

1 Three-Question Matrix and Reference Checks RFP Number: RFP Name: Design Services for Wiles Road from University Drive to Riverside Drive Ranking (Not Alphabetical) Firm Name Kimley-Horn and Associates, Inc. ASA Consultants, Inc. Keith and Schnars, Inc. Calvin, Giordano & Associates, Inc. Parsons Brinckerhoff, Inc. (WSP USA, Inc.) H.W. Lochner, Inc. Questions 1. Have the vendors taken any exceptions to the County's Standard Terms and Conditions? NO ECEPTIONS NO ECEPTIONS NO ECEPTIONS NO ECEPTIONS NO ECEPTIONS NO ECEPTIONS 2. Do the vendors have comparable government experience? 1. Florida Department of 1. Florida Department of Transportation (FDOT). Wiles Road Transportation (FDOT). I-95 Glades from Rock Island Road to State Interchange. Road City of Ft. Lauderdale, Las Olas Blvd. Corridor Safety 2. FDOT. State Road 715 milling and resurfacing. 1. Florida Department of Transportation (FDOT). Andrews Ave. Segment City of Pompano Beach. Atlantic Blvd. Streetscape. 1. Town of Davie. Davie Road s. 2. City of Weston; Manatee Islands Bike Lanes. 1. St. Thomas, U.S. Virgin Islands, Veterans Drive s. 1. Florida Department of Transportation (FDOT). US 41 in Sarasota, FL. 2. Hillsborogh County Public Works. 2. Pinellas County. Roadway Citrus Park Drive Extension. drainage, structural, civil and traffic engineering. 3. Have the vendors references been checked? YES (Attached) YES (Attached) YES (Attached) YES (Attached) YES (Attached) YES (Attached)

2 x Carolina Bustamante HCED 4/24/17 Page 107 p. 110

3 x Carolina Bustamante HCED 4/24/17 Page 105 p. 108

4 Broward County Board of County Commissioners Vendor Reference Verification Form, Design Services for Wiles Road from University Drive to Riverside Drive Reference for: Contact Name: Contact Name of Referenced Project: Reference date: Contact Phone: Contract No. Date Services Provided: Projec Amount: CGA # /01/ /30/2017 $ 6,000, Vendor s role in Project: Prime Vendor Subconsultant/Subcontractor Would you use this vendor again? Yes No ASA CONSULTANTS, INC. (SOHEILA SADOUGH, PE) CALVIN, GIORDANO & ASSOCIATES, INC. BOB MCSWEENEY, PE BMCSWEENEY@CGASOLUTIONS.COM SR PROJ MNGR NORTH BAY ROAD ACCESS BRIDGE 03/30/2017 Bridge design and permitting, seawall design, and post-design engineering services including shop drawings review; RFI review / response; value engineering review; site inspections; meeting attendance; change order review Sub-consultant continues to perform in the most timely and professional; manner. Carolina Bustamante HCED 4/24/17 Page 108 4/11/2017 BidSync p. 111

5 Broward County Board of County Commissioners Vendor Reference Verification Form, Design Services for Wiles Road from University Drive to Riverside Drive Reference for: ASA CONSULTANTS, INC. (SOHEILA SADOUGH,PE) FDOT DISTRICT IV Contact Name: RONALD WALLACE FDOT PM Reference date: 03/30/2017 Contact Contact Phone: Name of Referenced Project: SR-9/I-95 SPANISH RIVER BLVD. INTERCHANGE Contract No. Date Services Provided: Projec Amount: E490 08/01/ /30/2017 $ 68,938, Vendor s role in Project: Prime Vendor Subconsultant/Subcontractor Would you use this vendor again? Yes No DESIGN PROJECT MANAGER & ENGINEER OF RECORD Consultant is very proactive and very knowledgeable. They work through issues and provide innovation and cost savings measures. They provide excellent quality. Carolina Bustamante x HCED 4/21/17 Page 104 4/11/2017 BidSync p. 107

6 Carolina Bustamante HCED 4/25/17 Broward County Solicitation Design Services for Wiles Road from University Drive to Riverside Drive p

7 Carolina Bustamante HCED 4/21/17 Broward County Solicitation Design Services for Wiles Road from University Drive to Riverside Drive p

8 Carolina Bustamante HCED 4/24/17 Broward County Solicitation Design Services for Wiles Road from University Drive to Riverside Drive p

9 Vendor Reference Verification Form, Design Services for Wiles Road from University Drive to Riverside Drive Reference for: Contact Name: Contact H.W. Lochner, Inc. Pinellas County Department of Public Works Greg Cutrone, P.E. Name of Referenced Project: Reference date: Contact Phone: Contract No. Date Services Provided: Project Amount: Contract PO /09/2016 to 02/08/2021 $ 5,000, Vendor s role in Project: Prime Vendor Subconsultant/Subcontractor Would you use this vendor again? Yes No If No, please specify in Additional Comments (below). gcutrone@co.pinellas.fl.us Title: TES Manager 04/27/2017 Pinellas County Roadway, Drainage, Structural, Civil & Traffic Engineering Five-year selection to provide on-call civil, architectural, environmental, geotechnical, hydraulic, structural, transportation, and traffic engineering services. ***THIS SECTION FOR COUNTY USE ONLY*** Carolina Bustamante HCED 4/28/2017 Verified via: VERBAL Verified by: Division: Date:

10 Vendor Reference Verification Form, Design Services for Wiles Road from University Drive to Riverside Drive Reference for: H.W. Lochner, Inc. Florida Department of Transportation, District One Contact Name: Aaron Kaster Title: Project Manager Reference date: 03/30/2017 Contact Contact Phone: (386) Name of Referenced Project: US 41 from 10th to 14th Street in Sarasota, FL PD&E Study/Final Design Contract No. Date Services Provided: Project Amount: C /14/ /30/2017 $ 2,727, Vendor s role in Project: Prime Vendor Subconsultant/Subcontractor Would you use this vendor again? Yes No If No, please specify in Additional Comments (below). Design of two roundabouts with landscaped centers and pedestrian signals to replace two signalized intersections. Design of bicycle lanes, curb and gutter, lighting, and ITS/ATMS facilities. Development of construction staging plan to minimize disruption to traffic and pedestrians in a busy urban setting. Due to FDOT District policies, Project Managers are unable to provide reference information on consultants. Clients are advised to contact FDOTs Professional Services Unit (PSU) and get their consultant grades, in lieu of a reference form. Therefore, we have attached a grade for each project. LOCHNER GRADE: 4.0 Due to FDOT District policies, Project Managers are unable to provide reference information on consultants. Clients are advised to contact FDOTs Professional Services Unit (PSU) and get their consultant grades, in lieu of a reference form. Therefore, we have attached a grade for each project. ***THIS SECTION FOR COUNTY USE ONLY*** Carolina Bustamante HCED 4/25/17 Verified via: VERBAL Verified by: Division: Date: p. 58

11 Vendor Reference Verification Form, Design Services for Wiles Road from University Drive to Riverside Drive Reference for: City of Tampa Contact Name: Contact H.W. Lochner, Inc. Altafhusen Bukhari Name of Referenced Project: Reference date: Contact Phone: Contract No. Date Services Provided: Project Amount: 10-D /08/2011 to 12/31/2018 $ 532, Vendor s role in Project: Prime Vendor Subconsultant/Subcontractor Would you use this vendor again? Yes No If No, please specify in Additional Comments (below). Title: altafhusen.bukhari@tampagov.net Project Manager 04/27/2017 Westshore Boulevard and Gandy Boulevard Intersection s Design services for improvements to the intersection of Gandy and Westshore Boulevards in Tampa, Florida, including the addition of dual left-turn lanes on all four approaches and receiving lanes on Westshore Boulevard. I am very happy with the work performed by John and will not hesitate to recommend him for any local or State Govt. work. ***THIS SECTION FOR COUNTY USE ONLY*** Carolina Bustamante HCED 4/2/2017 Verified via: VERBAL Verified by: Division: Date:

12 Broward County Board of Vendor Reference Verification Form, Design Services for Wiles Road from University Drive to Riverside Drive Reference for: Contact Name: Contact Keith and Schnars Florida Department of Transportation Anson Sonnett Name of Referenced Project: Reference date: Contact Phone: Contract No. Date Services Provided: Projec Amount: /24/ /29/2019 $ 878, Vendor s role in Project: Prime Vendor Subconsultant/Subcontractor Would you use this vendor again? Yes No anson.sonnett@dot.state.fl.us Project Manager Andrews Avenue from Racetrack Rd to Atlantic Blvd. 04/03/2017 Roadway Design, Signing & Marking, Signalization, Lighting, MOT, Utility Coordination, Landscape Design, Construction Support Services, Landscape Installation Inspections, Carolina Bustamante HCED 4/25/17 p. 40

13 Verified via: VERBAL Verified by: DMsion: Broward County Board of Broward County Board of Bid BRZwARD counr( i Vendor Reference Verification Form R P1, Design Services for Wiles Road from University Drive to Riverside Drive Reference for: Keith and Schnars, PA. (N / \ City of Pompano Beach CRA \ Iifl \J[ i Contact Name: Horacio Danovich Title: CIP Manager Reference date: 04/17/2017 %j Contact Horacio.Danovichcopbfl.com contact Phone: Name of Referenced Project: Atlantic Boulevard Streetscape Contract No. Date Services Provided: Project Amount: /23/2010 to 01/30/2013 $ 175, vendor s role in Project: Prime vendor DSubconsultanuSubcontractor Would you use this vendor again? Yes ENo If No, please specify in Additional Comments (below). Engineering, landscape architecture and related services for design, construction drawings and construction engineering inspection for Atlantic Boulevard between US1 and AlA D H H H H 2. Vendors Organization: H H H H H H H H H H H H H H H H H H H H Additional comments: (provide on additional sheet if needed) All THIS SECTION FOR COUNTY USE ONLY*** Carolina Bustamante HCED Date: 4/25/17 information provided to Broward County is subiect to verification, Vendor acknowledges that inaccurate, untuthful, or incorrect statements made in support of this response may be used by the reiecton, rescission of the award, or termination of tie contract and may also serve as the basis for debarment of Vendor pursuant to section of tie Oroward Coui$y 28 p. 41

14 Carolina Bustamante HCED 4/24/17 p. 42

15 Vendor Reference Verification Form, Design Services for Wiles Road from University Drive to Riverside Drive Reference for: Contact Name: Contact Kimley-Horn Delray Beach Community Redevelopment Agency Jeff Costello Name of Referenced Project: Reference date: Contact Phone: Contract No. Date Services Provided: Projec Amount: 02/21/2011 t 08/28/2015 $ 1,185, Vendor s role in Project: Prime Vendor Subconsultant/Subcontractor Would you use this vendor again? Yes No Executive Director Federal Highway (US 1) Interim and Final Enhancements 04/03/2017 Kimley-Horn designed improvements to reduce north and southbound US 1 to two lanes each way and provide on-street parking on both avenues. The projects included landscaping beautification and decorative, environmentally sensitive street lighting; irrigation design; bicycle lanes; pavers; and crosswalks. Carolina Bustamante HCED 4/21/17 p. 11

16 Vendor Reference Verification Form, Design Services for Wiles Road from University Drive to Riverside Drive Reference for: Contact Name: Contact Kimley-Horn City of Fort Lauderdale Elizabeth Van Zandt Name of Referenced Project: Reference date: Contact Phone: Contract No. Date Services Provided: Projec Amount: 03/01/2015 t 04/05/2017 $ 153, Vendor s role in Project: Prime Vendor Subconsultant/Subcontractor Would you use this vendor again? Yes No evanzandt@fortlauderdale.gov Mobility Manager 04/05/2017 Las Olas Blvd Corridor Safety s & Colee Hammock Kimley-Horn is serving as the prime consultant for designing safety and traffic calming improvements and is the engineer of record for the project, estimated construction value of $1.3 million. Kimley-Horn, both Marwan and Sean, have been instrumental in the success of this capital investment plan project. They are very responsive and I plan to continue to use them for design services on future projects. Carolina Bustamante HCED 4/24/17 p. 10

17 Vendor Reference Verification Form, Design Services for Wiles Road from University Drive to Riverside Drive Reference for: Contact Name: Contact Kimley-Horn Boynton Beach Community Redevelopment Agency Mike Simon Name of Referenced Project: Reference date: Contact Phone: Contract No. Date Services Provided: Projec Amount: 02/15/2007 t 01/29/2016 $ 1,900, Vendor s role in Project: Prime Vendor Subconsultant/Subcontractor Would you use this vendor again? Yes No Interim Director Seacrest Boulevard Roadway s 03/30/2017 Kimley-Horn provided Seacrest Blvd improvements, roadway, and streetscape design as well as providing signage design, construction plans preparation, and construction observation services for two Welcome to Boynton Beach signs. These beautification and general improvements are part of Boynton Beach CRA s overall plan to improve the City s aesthetic and provide enhanced gateways into the community. Carolina Bustamante HCED 4/27/17 p. 9

18 DESIGN SERVICES FOR Wiles Road from University Drive to Riverside Drive Carolina Bustamante HCED 4/24/17 RFP Design Services for Wiles Road from University Drive to Riverside Drive p. 74

19 DESIGN SERVICES FOR Wiles Road from University Drive to Riverside Drive Carolina Bustamante HCED 4/21/17 RFP Design Services for Wiles Road from University Drive to Riverside Drive p. 72

20 DESIGN SERVICES FOR Wiles Road from University Drive to Riverside Drive Vendor Reference Verification Form, Design Services for Wiles Road from University Drive to Riverside Drive Reference for: WSP Parsons Brinckerhoff Polk County Roads and Drainage Division Contact Name: Doug Gable, PE Title: Project Manager Reference date: 04/03/2017 Contact Contact Phone: (863) Name of Referenced Project: Ernie Caldwell Blvd. from US 27 to US 17/92 - Post Design Services Contract No. Date Services Provided: Project Amount: /30/2004 to 04/30/2017 $ 3,800, Vendor s role in Project: Prime Vendor Subconsultant/Subcontractor Would you use this vendor again? Yes No If No, please specify in Additional Comments (below). EOR for the Ernie Caldwell Blvd Project - from US 27 to US 17/92. ***THIS SECTION FOR COUNTY USE ONLY*** Carolina Bustamante HCED 4/27/17 Verified via: VERBAL Verified by: Division: Date: RFP Design Services for Wiles Road from University Drive to Riverside Drive p. 70

21 DESIGN SERVICES FOR Wiles Road from University Drive to Riverside Drive Vendor Reference Verification Form, Design Services for Wiles Road from University Drive to Riverside Drive Reference for: Parsons Brinckerhoff, Inc. A & P Consulting Transportation Engineers, Corp. Contact Name: Eithel Sierra, PE Senior Proj. Mgr. Reference date: 03/31/2017 Contact EMSierra@APCTE.com Contact Phone: Name of Referenced Project: SR-5/US-1/Brickell Ave/Biscayne Blvd. Way from N. of SE 5th St.to S. of SE 2nd St. Contract No. Date Services Provided: Project Amount: $1,500,000 FDOT August 2013 to August 2015 Vendor s role in Project: Prime Vendor Subconsultant/Subcontractor Would you use this vendor again? Yes No If No, please specify in Additional Comments (below). Contract plans and specifications for safety and RRR improvements along SR-5/US-1/Brickell Avenue/Biscayne Blvd. Way from North of SE 5th Street (MP ) to South of SE 2nd Street (MP ). Responsible for completing all necessary analysis and developing plans for installation of the proposed signing and pavement marking improvements associated with the project. Parsons Brinckerhoff was very responsive and delivered all submittals according to the scope, schedule and budget. ***THIS SECTION FOR COUNTY USE ONLY*** Carolina Bustamante HCED 4/27/17 Verified via: VERBAL Verified by: Division: Date: RFP Design Services for Wiles Road from University Drive to Riverside Drive p. 75

22 Vendor Reference Verification Form, Design Services for Wiles Road from University Drive to Riverside Drive Reference for: Contact Name: Contact R.J. Behar & Company, Inc. Florida Department of Transportation (FDOT), District 4 Name of Referenced Project: Mr. Ronald Wallace, PE ronald.wallace@dot.state.fl.us Reference date: Contact Phone: (954) Contract No. Date Services Provided: Project Amount: C8V13 08/26/2010 to 02/28/2014 $187, Vendor s role in Project: Prime Vendor Subconsultant/Subcontractor Would you use this vendor again? Yes No If No, please specify in Additional Comments (below). Title: Project Manager 03/27/2017 SR-820/Pines/Hollywood Boulevard, Roadway Design, Broward County RJ Behar provided roadway design on SR-820/Hollywood Blvd. from 64th Way to East of SR-7/US-441 in Broward County. Project consisted of milling and resurfacing the existing pavement, upgrading roadway sign and curb ramps to meet current ADA standards, upgrading pedestrian features at the existing signals, landscape improvements, and utility coordination. x x ***THIS SECTION FOR COUNTY USE ONLY*** Carolina Bustamante HCED 4/21/17 Verified via: VERBAL Verified by: Division: Date: p. 175

23 Vendor Reference Verification Form, Design Services for Wiles Road from University Drive to Riverside Drive Reference for: Contact Name: Contact Name of Referenced Project: Reference date: Contact Phone: (954) Contract No. Date Services Provided: Project Amount: C9N55 04/15/2013 to Ongoing $786, Vendor s role in Project: Prime Vendor Subconsultant/Subcontractor Would you use this vendor again? Yes No If No, please specify in Additional Comments (below). R.J. Behar & Company, Inc. Florida Department of Transportation (FDOT), District 4 Fernando Morales, PE fernando.morales@dot.state.fl.us Title: Project Manager 04/27/2017 I-95 at 6th Avenue Interchange PD&E, Palm Beach county, Florida The FDOT, District 4 is currently conducting a PD&E study that proposes improvements to the SR 9/I-95 Interchange at 6th Avenue South in the City of Lake Worth, Palm Beach County, Florida. The purpose of this study is to identify short-term and long-term needs and develop design concepts to address traffic spillback onto I-95, improve Interchange operations, reduce congestion, and increase safety at the study interchange through the 2040 design year horizon. ***THIS SECTION FOR COUNTY USE ONLY*** Carolina Bustamante HCED 4/27/17 Verified via: VERBAL Verified by: Division: Date:

24 Vendor Reference Verification Form, Design Services for Wiles Road from University Drive to Riverside Drive Reference for: Contact Name: Dan Millien Project Manager Reference date: 03/27/2017 Contact Contact Phone: (954) Name of Referenced Project: SW 25th St. from SR 7 to SW 40th Ave.,Traffic Calming Study, West Park Contract No. Date Services Provided: Projec Amount: PO /22/ /30/2016 $20,000 Vendor s role in Project: Prime Vendor Subconsultant/Subcontractor Would you use this vendor again? Yes No R.J. Behar & Company, Inc. City of West Park Public Works Department RJ Behar provided traffic calming improvements, site visits, preparing conceptual plans, preparing layout and rendering coordination meetings, and presentation to the City Commission.

25 Vendor Reference Verification Form, Design Services for Wiles Road from University Drive to Riverside Drive Reference for: City of Hialeah, Florida Contact Name: Contact Name of Referenced Project: Reference date: Contact Phone: (305) Contract No. Date Services Provided: Project Amount: PO /19/2012 to 07/15/2014 $185, Vendor s role in Project: Prime Vendor Subconsultant/Subcontractor Would you use this vendor again? Yes No If No, please specify in Additional Comments (below). R.J. Behar & Company, Inc. Jose Sanchez JOSANCHEZ@hialeahfl.gov Title: Project Manager 03/27/2017 Roadway s - East 6th Ave. to East 8th Ave., Hialeah, Florida RJ Behar provided roadway design improvements, roadway reconstruction, milling and resurfacing, curb and gutter type F, valley gutter, new sidewalks, on-street parking, drainage design, signing and pavement markings, and lighting. ***THIS SECTION FOR COUNTY USE ONLY*** Carolina Bustamante HCED 5/2/2017 Verified via: VERBAL Verified by: Division: Date:

26 Vendor Reference Verification Form, Design Services for Wiles Road from University Drive to Riverside Drive Reference for: Contact Name: Contact R.J. Behar & Company, Inc. Florida Department of Transportation (FDOT) District 4 Luis Barrios luis.barrios@dot.state.fl.us Name of Referenced Project: Reference date: Contact Phone: Contract No. Date Services Provided: Project Amount: C9J09 03/27/2015 to 1, Vendor s role in Project: Prime Vendor Subconsultant/Subcontractor Would you use this vendor again? Yes No If No, please specify in Additional Comments (below). Title: Project Manager Districtwide In House Plans Review Support Services 05/02/2017 R.J. Behar has performed over 40 work orders for The Florida Department of Transportation District 4. As part of The Districtwide Plans Review contracts, RJB reviews construction documents for compliance with FDOT criteria, construction time estimate preparation/review, review of computation booklets, specification packages, cost estimates, etc. The deliverables include review comments in the ERC database, marked-up plans, design exception variation reports, contract time estimates, traffic control plan review/constructability, quantity computations with pay item verifications, utility conflicts, right-of-way encroachments, etc. ***THIS SECTION FOR COUNTY USE ONLY*** Carolina Bustamante HCED 5/3/2017 Verified via: VERBAL Verified by: Division: Date:

SOLICITATION J P1 Construction Engineering Services for Wiles Road Riverside Drive to Rock Island Road

SOLICITATION J P1 Construction Engineering Services for Wiles Road Riverside Drive to Rock Island Road SOLICITATION J2112395P1 Construction Engineering Services for Wiles Road Riverside Drive to Rock Island Road Qualifications and Experience of Key Personnel Dan Tintner, P.E., Project Manager/Senior Project

More information

FDOT D4 Complete Streets

FDOT D4 Complete Streets FDOT D4 Complete Streets Context Sensitive Solutions Directs that complete street solutions will complement the context of the community. Collaborative approach to decision making, project development,

More information

Creative Engineering Group Inc, (Creative) Construction Engineering and Inspection (CEI) Professionals

Creative Engineering Group Inc, (Creative) Construction Engineering and Inspection (CEI) Professionals ABOUT US Creative Engineering Group Inc, (Creative) is a Construction Engineering and Inspection (CEI) firm established in 2006 by two Principals Rick Estripeaut & Sri Mavanur. In the last decade Creative

More information

Construction Engineering & Inspection

Construction Engineering & Inspection Construction Engineering & Inspection Serving Florida for 20 Years CEI Engineering Planning Landscape Architecture Urban Design Construction Engineering & Inspection (CEI) I N T R O D U C T I O N Over

More information

Design Services for Wiles Road Broward County Project #104026

Design Services for Wiles Road Broward County Project #104026 Design Services for Wiles Road Broward County Project #104026 ORGANIZATIONAL CHART THE CGA TEAM Firm Services Key Staff CBE Calvin, Giordano & Associates, Inc. HBC Engineering Company Florida Engineering

More information

Construction Engineering & Inspection Services Transit Bus Stop Infrastructure for the Broward County Transit Division (BCT)

Construction Engineering & Inspection Services Transit Bus Stop Infrastructure for the Broward County Transit Division (BCT) Construction Engineering & Inspection Services Transit Bus Stop Infrastructure for the Broward County Transit Division (BCT) 1 Firm Overview 2 We are a well established multi disciplinary firm that has

More information

I-4 Beyond the Ultimate. Florida Transportation Builders Association February 9, 2018

I-4 Beyond the Ultimate. Florida Transportation Builders Association February 9, 2018 I-4 Beyond the Ultimate Florida Transportation Builders Association February 9, 2018 FDOT: Improving Mobility & Safety in Central Florida FDOT is Designing and building a better I-4 through Central Florida

More information

PD&E STUDY SR 9/I-95 FROM SOUTH OF SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # ETDM 14222

PD&E STUDY SR 9/I-95 FROM SOUTH OF SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # ETDM 14222 PD&E STUDY SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # 435808-1-22-02 ETDM 14222 WELCOME TO THE KICK-OFF MEETING May 24, 2016 1 1 2 3 4 5 6 PLANNING PROJECT DEVELOPMENT AND ENVIRONMENT

More information

TAC/CAC, TPO Project Update February 2016

TAC/CAC, TPO Project Update February 2016 A1A MULTIMODAL CORRIDOR PLANNING AND ENGINEERING ANALYSIS Florida Department of Transportation TAC/CAC, TPO Update February 2016 PRESENTATION FOOTERT Meeting Agenda What We Plan To Discuss Background New

More information

Wiles Road from University Drive to Riverside Drive

Wiles Road from University Drive to Riverside Drive Wiles Road from University Drive to Riverside Drive Presented to: Broward County WSP Parsons Brinckerhoff is now Presented by: WSP USA Inc. Our Team.. Introduction / Project Team Cecilia Villoria, PE Project

More information

SR 916/NW/NE 135 Street Public Hearing

SR 916/NW/NE 135 Street Public Hearing Florida Department of TRANSPORTATION SR 916/NW/NE 135 Street Public Hearing Resurfacing, Restoration, and Rehabilitation (RRR) Project From NW 6 Avenue to west of SR 5/Biscayne Boulevard FM #429346-1-52-01

More information

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m. Public Hearing Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, 2019 open house at 4 p.m., formal presentation at 5 p.m. Welcome to the Public Hearing for the Harborview Road (CR 776)

More information

CITY OF BOYNTON BEACH SE 1 ST STREET COMPLETE STREETS IMPROVEMENTS

CITY OF BOYNTON BEACH SE 1 ST STREET COMPLETE STREETS IMPROVEMENTS CITY OF BOYNTON BEACH SE 1 ST STREET COMPLETE STREETS IMPROVEMENTS N Project Location -Town Square -Villages at Ocean SE 1st St, between E Woolbright Rd and SE 2nd Ave Project Location -Boynton One -Publix

More information

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204 DISTRICT TWO PUBLIC HEARING I 10 (SR 8) from I 295 to I 95 Project Development & Environment Study Duval County, Florida Financial Project Number 213326 2 22 01 Efficient Transportation Decision Making

More information

A Connected Region for Our Future. Tampa Bay Regional Planning Council

A Connected Region for Our Future. Tampa Bay Regional Planning Council A Connected Region for Our Future Tampa Bay Regional Planning Council TBARTA Vision A world class transportation network for the Tampa Bay region that will connect people and places, move goods and services,

More information

Please see attached for more detailed project information. Project Schedule Designer Award by SBC Executive Sub-Committee December 21, 2015

Please see attached for more detailed project information. Project Schedule Designer Award by SBC Executive Sub-Committee December 21, 2015 Project Title Campus Beautification Projects Volunteer Blvd Ph 1 540/009-08-2015 Institution Description UT Knoxville This project will improve Volunteer Boulevard from West Cumberland Ave. to East Cumberland

More information

Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates).

Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates). Pelican Bay Community Improvement Plan Traffic,JI Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates). D1 -A: Provide consistent signing, marking

More information

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017 Community Meeting No. 2 May 31, 2017 Transportation Projects On or Near SH 199 SH 199 from 0.3 miles south of FM 1886 to south end of Lake Worth bridge Construct freeway mainlanes and frontage roads 10-Year

More information

Panama City Beach Community Redevelopment Agency ON THE MOVE IN PCB

Panama City Beach Community Redevelopment Agency ON THE MOVE IN PCB Panama City Beach Community Redevelopment Agency ON THE MOVE IN PCB Program Goals, Activities and Accomplishments I. Beach Front Multi-modal Transportation, Aesthetic and Parking Improvements III. Connector

More information

SR 483 Clyde Morris Boulevard FDOT District 5

SR 483 Clyde Morris Boulevard FDOT District 5 This project occurs on a 3.0 mile section of SR 483 (Clyde Morris Blvd.) south of Beville Road (SR 400) to north of International Speedway Boulevard (SR 600). Ghyabi is providing project management and

More information

HILLSBOROUGH COUNTY Greenways and Trails Plan Update. Executive Summary. Date

HILLSBOROUGH COUNTY Greenways and Trails Plan Update. Executive Summary. Date HILLSBOROUGH COUNTY Greenways and Trails Plan Update Executive Summary Date PURPOSE AND PROJECT OVERVIEW The Hillsborough County Greenways Master Plan (1995) and the City of Tampa s Greenways and Trails

More information

Project Overview. Fairfax County Parkway Widening Fairfax County. Get Involved. Public Information Meeting. Contact Information

Project Overview. Fairfax County Parkway Widening Fairfax County. Get Involved. Public Information Meeting. Contact Information Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information

Completing the Vision:

Completing the Vision: Completing the Vision: North A1A-Lane Reconfiguration TDLC-Transportation Design for Liveable Communities Surf Rd. Redirection of Traffic Phase III Streetscape October 30, 2012 1 Project Overview District

More information

Project Overview. Get Involved. Public Information Meeting. Contact Information

Project Overview. Get Involved. Public Information Meeting. Contact Information Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information

SCTPO Project Summary September 2014

SCTPO Project Summary September 2014 A1A MULTIMODAL CORRIDOR PLANNING AND ENGINEERING ANALYSIS Florida Department of Transportation SCTPO Project Summary September 2014 PRESENTATION FOOTER Meeting Agenda What We Plan To Do Project Background

More information

4/8/2015 Item #10D Page 1

4/8/2015 Item #10D Page 1 MEETING DATE: April 8, 2015 PREPARED BY: Christy Villa, Associate Civil Engineer DEPT. DIRECTOR: Glenn Pruim DEPARTMENT: Public Works CITY MANAGER: Larry Watt SUBJECT: NORTH COAST HIGHWAY 101 STREETSCAPE

More information

AGENDA ACTION ITEMS INFORMATION ITEMS

AGENDA ACTION ITEMS INFORMATION ITEMS NOACA Bicycle and Pedestrian Advisory Council Meeting Friday, March 21 st, 2014 10:30 a.m. NOACA Office 1299 Superior Avenue Cleveland, Ohio 44114 Phone: (216) 241-2414; website: www.noaca.org AGENDA ACTION

More information

Carson Street Streetscape Improvements. Request for Proposals

Carson Street Streetscape Improvements. Request for Proposals Carson Street Streetscape Improvements Request for Proposals Complete Design Services for a Landscape/Streetscape Plan for Carson Street (Pioneer Boulevard to Norwalk Boulevard) Submittal Deadline: October

More information

Beachside Redevelopment Committee

Beachside Redevelopment Committee Beachside Redevelopment Committee DRAFT FINAL RECOMMENDATIONS MARCH 22, 2018 This is a new slide 2 This is a new slide Table of Contents I. Introduction and Overview II. III. Community Improvements and

More information

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES GOAL 2 The City shall provide a safe, convenient, effective, and energy efficient multimodal transportation system which is coordinated with the Future

More information

I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study. OCX Board Meeting

I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study. OCX Board Meeting I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study Presentation for: OCX Board Meeting January 14, 2014 Financial Project ID: 433693-2-22-01 ETDM No.: 13957 - Poinciana Parkway

More information

2017 General Obligation Bond

2017 General Obligation Bond 2017 General Obligation Bond Presentation of Public and Council Projects to the Transportation & Mobility Stakeholder Committee April 13, 2017 Agenda Deferred Maintenance Project Development Process Projects

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) ADA Central, Contract 1 DBNUM: 15417 / UPC: 154170 This contract will bring projects into compliance with current ADA design requirements that could not be completed within original design or construction

More information

CRA Five Year Capital Improvement Plan. September 2, 2015

CRA Five Year Capital Improvement Plan. September 2, 2015 CRA Five Year Capital Improvement Plan September 2, 2015 Downtown CRA Recap Introduction Downtown Capital Improvement Projects: $2.6M available for FY 2016. Includes the recent loan of $2.0M. DOWNTOWN

More information

AASHTO SUBCOMMITTEE ON DESIGN. June 15, 2006 MARK ROBINSON, P.E. DISTRICT 5 INTERSTATE PROGRAM MANAGER FLORIDA DEPARTMENT OF TRANSPORTATION

AASHTO SUBCOMMITTEE ON DESIGN. June 15, 2006 MARK ROBINSON, P.E. DISTRICT 5 INTERSTATE PROGRAM MANAGER FLORIDA DEPARTMENT OF TRANSPORTATION AASHTO SUBCOMMITTEE ON DESIGN June 15, 2006 MARK ROBINSON, P.E. DISTRICT 5 INTERSTATE PROGRAM MANAGER FLORIDA DEPARTMENT OF TRANSPORTATION CENTRAL FLORIDA INTERSTATE 4 FACTS Trucks and Others 12% Tourist

More information

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass The Illinois Department of Transportation and Lake County Division of Transportation welcome you to this Public Hearing for U.S. Route 45 from Illinois Route 132 to Illinois Route 173, including the Millburn

More information

Capital Projects impacting Odenton Town Center

Capital Projects impacting Odenton Town Center Capital Projects impacting Odenton Town Center 1 2 E549700 W801600/ W801602 Anne Arundel County Department of Public Works Manor View Elementary School Transmission Main - MD 32 @ Meade Phase 2 $34,399,000

More information

Executive Summary. NY 7 / NY 2 Corridor

Executive Summary. NY 7 / NY 2 Corridor Executive Summary NY 7 / NY 2 Corridor Transportation and Land Use Study December 2005 Prepared for: Town of Colonie Capital District Transportation Committee Prepared by: Introduction: Land use decisions

More information

STATE OF TENNESSEE DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL DIVISION

STATE OF TENNESSEE DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL DIVISION STATE OF TENNESSEE DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL DIVISION Suite 900 - James K. Polk Building 505 Deaderick Street Nashville, Tennessee 37243-0334 MEMORANDUM TO: FROM: Files Joe W. Matlock,

More information

Fall 2017 Construction Update

Fall 2017 Construction Update Fall 2017 Construction Update Ward 4 Southeast Engineering Department Riverwalk Red Multi-Use Trail Bridge Rehabilitation The Riverwalk Red Multi Use Trail Bridge was awarded to Cramer and Associates,

More information

Project Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006

Project Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006 Project Goal Town of Halifax Revitalization Project RRRC Living Towns Planning Workshp July 12, 2006 Town of Halifax Halifax County *** Revitalization Project Goal*** To create Economic Opportunity and

More information

2040 Long Range Transportation Plan

2040 Long Range Transportation Plan 2040 Long Range Transportation Plan Adopted: April 15, 2013 APPENDIX D HIGHWAY NEEDS PLAN PROJECTS FREDERICKSBURG Existing and Committed Projects Fall Hill Avenue/Mary Washington Blvd. (Fredericksburg)

More information

SAN MARTIN BOULEVARD OVER RIVIERA BAY PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY

SAN MARTIN BOULEVARD OVER RIVIERA BAY PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY KICK-OFF PRESENTATION SAN MARTIN BOULEVARD OVER RIVIERA BAY PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY PROJECT IDENTIFICATION NUMBER (PID): #001036A May 13, 2015 1 2 PROJECT LOCATION PROJECT HISTORY

More information

Spring 2018 Construction Update

Spring 2018 Construction Update Spring 2018 Construction Update Ward 3 Southwest Engineering Department Locust Street Bridge over the Des Moines River The Locust Street Bridge over the Des Moines River project is being let through the

More information

Poinciana Parkway Extension Project Development & Environment Study

Poinciana Parkway Extension Project Development & Environment Study Poinciana Parkway Extension Project Development & Environment Study Nicole Gough, Dewberry Mary Brooks, Quest Corporation of America Clif Tate, Kimley-Horn and Associates February 19, 2019 Title VI Compliance

More information

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY THREE-YEAR CAPITAL IMPROVEMENT PLAN FY2016 2018 Annual CIP Development Process Public Works & Engineering Divisions Prepare List of Capital Needs and Recommended Deferred Maintenance Public Works & Engineering

More information

Route 1 Corridor Study

Route 1 Corridor Study Route 1 Corridor Study Westbrook, Connecticut A Vision for the Connecticut Shoreline Public Informational Meeting July 28, 2015 Lower Connecticut River Valley Council of Governments Fitzgerald & Halliday,

More information

Route 9 Gateway Project. October 9, 2014 Informational Meeting

Route 9 Gateway Project. October 9, 2014 Informational Meeting Route 9 Gateway Project NYS DOT P.I.N. 1759.67 Town of Lake George, New York October 9, 2014 Informational Meeting Open House 3:00-3:30 Presentation 3:30-4:15 Introductions Town Representatives Dennis

More information

Inform you of the purpose and scope of the study for PTH 100 and a proposed future St. Norbert Bypass;

Inform you of the purpose and scope of the study for PTH 100 and a proposed future St. Norbert Bypass; WELCOME The intent of today s Open House is to: Inform you of the purpose and scope of the study for PTH 100 and a proposed future St. Norbert Bypass; Review highway crossing locations, future access closures

More information

Transportation Alternatives Program (TAP) Experience

Transportation Alternatives Program (TAP) Experience 1 Transportation Alternatives Program (TAP) Experience McCormick Taylor is a full-service engineering firm providing creative design, planning, and environmental solutions to the challenges of everyday

More information

City of Fort Lauderdale UPTOWN URBAN VILLAGE. Public Workshop December 7, 2016

City of Fort Lauderdale UPTOWN URBAN VILLAGE. Public Workshop December 7, 2016 Public Workshop December 7, 2016 Workshop Agenda Introductions Project Presentation o o o History Project Scope/Timeline Character of Study Area o o o o Land Use Public Realm/Pedestrian Mobility Multimodal

More information

Pine Island Road Corridor Master Plan

Pine Island Road Corridor Master Plan RECOMMENDED DEVELOPMENT PLAN Figure 9: Del Prado Village District Conceptual Framework The Conceptual Framework (Figure 8) for development of the Pine Island Corridor is to encourage mixed-use development

More information

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan Scope of Services River Oaks Boulevard (SH 183) Corridor Master Plan PROJECT AREA The project area consists of the River Oaks Boulevard (SH 183) corridor bounded by SH 199 at the northern end and the Trinity

More information

Boca Raton II Tri-Rail Station PD&E Study and 30% Documents Public Kick-Off Meeting. August 29, 2017 Spanish River Library

Boca Raton II Tri-Rail Station PD&E Study and 30% Documents Public Kick-Off Meeting. August 29, 2017 Spanish River Library Boca Raton II Tri-Rail Station PD&E Study and 30% Documents Public Kick-Off Meeting August 29, 2017 Spanish River Library Introductions 2 Partner Stakeholder Agencies FDOT District Four Palm Beach Metropolitan

More information

PROJECT SHOWING MINUTES

PROJECT SHOWING MINUTES PROJECT SHOWING MINUTES North Lynn Street Esplanade Improvements Project No. 0029-000-859, C501, B605 UPC No. 109813 November 1, 2017 10:00 a.m. 1911 North Ft. Myer Drive, LL-10, Arlington, VA Overview

More information

SUMMARY Downtown Malabar Meeting on July 30, 2013 State Road (SR) 514 (Malabar Road) Project Development and Environment (PD&E) Study

SUMMARY Downtown Malabar Meeting on July 30, 2013 State Road (SR) 514 (Malabar Road) Project Development and Environment (PD&E) Study SUMMARY Downtown Malabar Meeting on July 30, 2013 State Road (SR) 514 (Malabar Road) Project Development and Environment (PD&E) Study www.sr514malabar.com LOCATION: TIME: ATTENDEES: Malabar Town Hall 2725

More information

2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015

2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015 AGENCY: 2016 REVISIONS COMMENT FORM Section Title Number Chapter 1 Introduction Comment 1.1 CDOT Mission Statement 1.2 Purpose of Rules and Regulations for Construction in the Public Way 1.3 Chicago Department

More information

Elm Street Business District: Streetscape and Signage Plan

Elm Street Business District: Streetscape and Signage Plan Elm Street Business District: Streetscape and Signage Plan VILLAGE OF WINNETKA DOWNTOWN MASTER PLAN VILLAGE COUNCIL MEETING Final Streetscape & Signage Planning Teska Associates 04 June 2018 WHY WE RE

More information

Introductions. Improvements Project. Project Limits. Project Components 6/23/2010. Davie-Cooper City Chamber of Commerce Wednesday, June 23, 2010

Introductions. Improvements Project. Project Limits. Project Components 6/23/2010. Davie-Cooper City Chamber of Commerce Wednesday, June 23, 2010 Introductions I 595 Express Corridor Improvements Project Davie-Cooper City Chamber of Commerce Wednesday, June 23, 2010 Project Limits Project Components To West Palm Beach Sunrise Boulevard To Naples

More information

S.R.7/U.S.441 COLLABORATIVE THE COLLEGE OF CORRIDOR KNOWLEDGE

S.R.7/U.S.441 COLLABORATIVE THE COLLEGE OF CORRIDOR KNOWLEDGE S.R.7/U.S.441 COLLABORATIVE THE COLLEGE OF CORRIDOR KNOWLEDGE S.R.7 Corridor : A Sense of Place? ANYWHERE USA SR 7: Civilizing the Corridor Bad rules = Bad development! The SR 7 Collaborative A model for

More information

Community Engagement Committee Meeting #1 December 10, :30pm-8:30pm

Community Engagement Committee Meeting #1 December 10, :30pm-8:30pm Community Engagement Committee Meeting #1 December 10, 2014 6:30pm-8:30pm Welcome and Introductions Dana Murdoch Minneapolis Park and Recreation Board Project Manager Ryan French Walker Art Center Director

More information

CITY OF MANHATTAN BEACH STAFF REPORT. THROUGH: Marisa Lundstedt, Director of Community Development

CITY OF MANHATTAN BEACH STAFF REPORT. THROUGH: Marisa Lundstedt, Director of Community Development CITY OF MANHATTAN BEACH STAFF REPORT TO: Planning Commission THROUGH: Marisa Lundstedt, Director of Community Development FROM: Tony Olmos, Director of Public Works DATE: April 29, 2015 SUBJECT: Determination

More information

BRADENTON RIVERWALK EXPANSION MASTER PLAN

BRADENTON RIVERWALK EXPANSION MASTER PLAN BRADENTON RIVERWALK EXPANSION MASTER PLAN INTRODUCTION & AGENDA Process Update Community Engagement Summary Center for Active Design (CfAD) Recommendations Context and Existing Conditions Master Plan Alternatives

More information

Panama City Beach Community Redevelopment Agency Condo Con Property Owner Conference & Expo November 14, 2014

Panama City Beach Community Redevelopment Agency Condo Con Property Owner Conference & Expo November 14, 2014 Panama City Beach Community Redevelopment Agency Condo Con Property Owner Conference & Expo November 14, 2014 Front Beach Road CRA On November 30, 2000, the City created the Panama City Beach Community

More information

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014 Town of Yucca Valley Capital Improvement Projects Report July 24, 2014 SR 62 Traffic and Pedestrian Improvements from Apache Trail to Palm Avenue (PLHD) The project includes construction of curbs, gutters,

More information

Welcome to the. Open House

Welcome to the. Open House Welcome to the 5th Street to Kinsman Road Open House November 14 5:30 7:00 p.m. Please sign in Project Overview In December 2016, City Council adopted SW 5th Street as the preferred alignment to connect

More information

5-E ====================================================== -==-= ====================================================

5-E ====================================================== -==-= ==================================================== PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS 5-E AGENDA ITEM SUMMARY ------------====================================================== Meeting Date: September 11, 2007 Department: [] [] Consent [ ]

More information

TOWN OF JUPITER. Honorable Mayor and Members of Town Council Andrew D. Lukasik, Town Manager

TOWN OF JUPITER. Honorable Mayor and Members of Town Council Andrew D. Lukasik, Town Manager DATE: June 07, 2016 TO: THRU: TOWN OF JUPITER Honorable Mayor and Members of Town Council Andrew D. Lukasik, Town Manager FROM: Thomas V. Driscoll, P.E., Director of Engineering, Parks & Public Works SUBJECT:

More information

MEMORANDUM & CITY COMMISSION BRIEFING Orlando Avenue Landscape Plans Consent Agenda Item

MEMORANDUM & CITY COMMISSION BRIEFING Orlando Avenue Landscape Plans Consent Agenda Item MEMORANDUM & CITY COMMISSION BRIEFING Orlando Avenue Landscape Plans Consent Agenda Item TO: THRU: FROM: RE: Mayor Leon Skip Beeler and Members of the City Commission Chuck Billias, City Manager Anthony

More information

23 EA , , , , , , , LF , , ,596.

23 EA , , , , , , , LF , , ,596. Mast Arm Traffic Signals at Central Ave. 5th, 6th, 8th & 31st St. Engineering & Capital Improvements Department, City of St. Petersburg, FL Project No.: 11027-112 Bid date: January 10, 2012 Item Description

More information

St. Clair Avenue West Area Transportation Master Plan

St. Clair Avenue West Area Transportation Master Plan 1 (Between Keele Street and Old Weston Road) Public Information Centre 1 December 2, 2015 2 Welcome Welcome to the first Public Information Centre for the St. Clair Avenue West Area. The panels will present

More information

Eastern Terminus TECHNICAL MEMORANDUM CENTRAL BROWARD EAST-WEST TRANSIT ANALYSIS BROWARD COUNTY, FLORIDA

Eastern Terminus TECHNICAL MEMORANDUM CENTRAL BROWARD EAST-WEST TRANSIT ANALYSIS BROWARD COUNTY, FLORIDA Eastern Terminus TECHNICAL MEMORANDUM CENTRAL BROWARD EAST-WEST TRANSIT ANALYSIS BROWARD COUNTY, FLORIDA FINANCIAL PROJECT ID NUMBER 411189-2-22-01 FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 4 Prepared

More information

12/9/2013. HOLLYWOOD/PINES CORRIDOR PROJECT AMPO 2013 Annual Conference October 24, Our Perspective. Broward.

12/9/2013. HOLLYWOOD/PINES CORRIDOR PROJECT AMPO 2013 Annual Conference October 24, Our Perspective. Broward. HOLLYWOOD/PINES CORRIDOR PROJECT AMPO 2013 Annual Conference October 24, 2013 Our Perspective Broward Fort Lauderdale 1 Broward Metropolitan Planning Organization Fort Lauderdale Fort Lauderdale Skyline

More information

Public Information Meeting

Public Information Meeting Today s Agenda: Open House - (5:30-7PM) Presentation- (5:45PM) County Project: P-5351-1 FDOT Project :242172-1-58-01 Public Information Meeting Technical Design Team Volusia County Jim White, P.E.- Project

More information

DESIGN CRITERIA PACKAGE

DESIGN CRITERIA PACKAGE RFQ: 17-C-00003 DESIGN-BUILD SERVICES FOR THE DESIGN CRITERIA PACKAGE PREPARED BY: JAMES E. JACKSON, JR. AIA CITY ARCHITECT CONTRACT ADMINISTRATION DEPARTMENT and INTERFLOW ENGINEERING, L.L.C DESIGN CRITERIA

More information

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA Agenda Date: December 16, 2013 Action Required: Adoption of Resolution Presenter: Staff Contacts: Title: James E. Tolbert, AICP, Director of NDS James

More information

April 22, 2011 PART I

April 22, 2011 PART I AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN VANASSE HANGEN BRUSTLIN, INC. d/b/a VHB MILLER SELLEN AND ESCAMBIA COUNTY COMMUNITY REDEVELOPMENT AGENCY VHB-MS CONTRACT NO. 81283.11 April 22, 2011 This Agreement

More information

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS Caldwell County Pathways along with our co-partners City of Lenoir, Town of Gamewell,

More information

Gratigny Parkway East Extension Project Development & Environment (PD&E) Study

Gratigny Parkway East Extension Project Development & Environment (PD&E) Study Gratigny Parkway East Extension Project Development & Environment (PD&E) Study Session 4: Presentation of Charrette Results December 8, 2010 MDX Work Program #: 92407 ETDM#: 11500 Project Location & Description

More information

Rezoning Transportation Analysis Petition Number: General Location Identifier:

Rezoning Transportation Analysis Petition Number: General Location Identifier: From: Kelsie Anderson, PE Kelsie.Anderson@charlottenc.gov 704-432-5492 Staff Reviewer: Kory Hedrick, PE, PMP Khedrick@charlottenc.gov 704-432-6511 CDOT s review of this rezoning petition is intended to

More information

BOISE, IDAHO COUNCIL WORK SESSION AGENDA September 19, :00 PM City Hall - Council Chambers

BOISE, IDAHO COUNCIL WORK SESSION AGENDA September 19, :00 PM City Hall - Council Chambers BOISE, IDAHO COUNCIL WORK SESSION AGENDA September 19, 2017 5:00 PM City Hall - Council Chambers I. CALL TO ORDER II. WORK SESSION ITEMS 1. Interim Changes (10 mins) Presenter: Brent Davis, Finance and

More information

2017 Asphalt Contractors Association of Florida Pavement Awards

2017 Asphalt Contractors Association of Florida Pavement Awards 2017 Asphalt Contractors Association of Florida Pavement Awards Special Projects Any project of a special or unique nature requiring specialized equipment, techniques, materials, time restrictions, or

More information

Date: Thursday, August 21, 2014

Date: Thursday, August 21, 2014 RESOLUTION 2014-02 A RESOLUTION OF THE BOARD OF SUPERVISORS OF LAKEWOOD RANCH COMMUNITY DEVELOPMENT DISTRICT 4 APPROVING PROPOSED BUDGETS FOR FISCAL YEAR 2015 AND SETTING A PUBLIC HEARING TO ADOPT THE

More information

Welcome. South Seminole Heights Civic Association, Inc. Tampa Interstate Study Supplemental Environmental Impact Statement.

Welcome. South Seminole Heights Civic Association, Inc. Tampa Interstate Study Supplemental Environmental Impact Statement. Welcome South Seminole Heights Civic Association, Inc. October 17, 2018 Tampa Interstate Study Supplemental Environmental Impact Statement 1 Stephen Benson Opening FDOT District Seven 2 3 Our solutions

More information

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: , TOWN OF PALM BEACH DATE: October 19, 2017 FOR IMMEDIATE RELEASE MEDIA CONTACT: Patricia Strayer, P.E., Town Engineer Phone: 561-838-5440, Email: pstrayer@townofpalmbeach.com Construction and Traffic Highlights

More information

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals:

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals: Welcome Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals: - Review Environmental Assessment - Share Preferred Alternative -Receive Public Comments 2003 EA Preferred Alternative

More information

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A WELCOME! 168 TH STREET IMPROVEMENTS 6:30 Open House 7 8 Presentation & Q&A 8 8:30 Open House WELCOME Todd Pfitzer City of Omaha Engineer Bob Stubbe City of Omaha Public Works Director Jon Meyer Project

More information

Open House RIVER DES PERES GREENWAY: LANSDOWNE SHREWSBURY METROLINK TO FRANCIS R. SLAY PARK

Open House RIVER DES PERES GREENWAY: LANSDOWNE SHREWSBURY METROLINK TO FRANCIS R. SLAY PARK Open House 10.12.16 RIVER DES PERES GREENWAY: LANSDOWNE SHREWSBURY METROLINK TO FRANCIS R. SLAY PARK MEETING AGENDA Great Rivers Greenway and Project Partners River des Peres Greenway Overview Project

More information

Southern Gateway Project and Public Green

Southern Gateway Project and Public Green Southern Gateway Project and Public Green Transportation and Trinity River Project Committee May 23, 2016 Purpose of Presentation Provide the history and an overview of the Southern Gateway Project (SGP)

More information

Rutherford County Projects

Rutherford County Projects Rutherford Projects 5307 Urban Operating for Rover Public Transit - Relax & Ride Service TIP # 2005-006 Transit Operations Murfreesboro Public Transit Rutherford Length 0.00 Regional Plan ID Consistent

More information

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights ANCHORAGE PARKS & RECREATION Nichols Park Design and improve neighborhood park 2008 Challenge Grant applicant. 2008 $500K State Grant for Neighborhood Parks. Tikishla Park Lighting, paved parking, hockey

More information

WELCOME 50 street cp rail grade separation + road widening. public information session #1 June 26, pm to 8 pm

WELCOME 50 street cp rail grade separation + road widening. public information session #1 June 26, pm to 8 pm WELCOME 50 street cp rail grade separation + road widening public information session #1 June 26, 2018 5 pm to 8 pm session purpose To provide residents, businesses, and users of 50 Street with the opportunity

More information

COMPLETE GREEN STREET CHECKLIST

COMPLETE GREEN STREET CHECKLIST COMPLETE GREEN STREET CHECKLIST This document was developed to dissect the structure of an urban street and explore opportunities to make our streets more complete while also integrating green street strategies.

More information

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Schooleys Mountain Bridge Rehabilitation Project ID Numbers: N1707 / 173470 Schooleys Mountain Road Bridge was built in 1920 and widened in 1937. The project is a replacement of the bridge structure and

More information

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2. Table of Contents Introduction 1 Existing Context 1 Figure 1 2 Plan Guidelines 3 Future Urban Form 4 The West-End 4 Main Street 6 The East-End 7 Figure 2 9 Public Improvement Recommendations 7 General

More information

City of Edmonton. Walterdale Bridge Replacement and Approach Roads Evaluation. Concept Planning Study. Final Report

City of Edmonton. Walterdale Bridge Replacement and Approach Roads Evaluation. Concept Planning Study. Final Report City of Edmonton Final Report Walterdale Bridge Replacement and Approach Roads Evaluation April, 2011 Walterdale Bridge Replacement and Approach Roads Evaluation Final Report April 2011 Acknowledgement

More information

Cottage Grove Road Reconstruction. City of Madison Engineering

Cottage Grove Road Reconstruction. City of Madison Engineering Public Informational Meeting Cottage Grove Road Reconstruction October 8, 2015 Presentation Outline Introduction Project Purpose & Need Proposed Design Overview Environmental Concerns Pedestrian Needs

More information

Capital Projects in and near Odenton Town Center

Capital Projects in and near Odenton Town Center Capital Projects in and near Odenton Town Center Map ID Anne Arundel County Department of Public Works This project provides for the design, right of way acquisition, and construction of approximately

More information

Mayor Dave Netterstrom and Members of the City Commission. Anthony Caravella, AICP, Director of Development Services

Mayor Dave Netterstrom and Members of the City Commission. Anthony Caravella, AICP, Director of Development Services CITY COMMISSION BRIEFING & DOWNTOWN COCOA BEACH COMMUNITY REDEVELOPMENT AGENCY Planning Board and Landscape Committee Report For Meeting Scheduled for February 7, 2013 Minutemen Causeway Low Impact Design

More information

Broward County Complete Stre ts

Broward County Complete Stre ts Broward County Complete Strets Greenways Integration Study PO# SC 033 UP101713000000000001 Prepared by Kimley-Horn and Urban Health Solutions for Broward County Planning and Redevelopment Division Funded

More information