District 2 Projects Scheduled for award during the period from 06/19/15 to 06/18/16 Sorted by PID
|
|
- Victoria Paul
- 5 years ago
- Views:
Transcription
1 79902 LUC SR Bridge Re Rehab structure by performing a deck overlay, semi-integral abutments, and paint, SLUCSR00051**C , LUC IR Redeck 3 A district allocation funded project to redeck and paint the structural steel of 3 bridges over I-475 in the City of Toledo, UPDATE (5-5-11): scope increased from paint to now include redeck as per Bradley. Quantit SLUCIR00475**C ,300, LUC IR Redeck 3 A district allocation funded project to redeck and paint the structural steel of 3 bridges over I-475 in the City of Toledo, UPDATE (5-5-11): scope increased from paint to now include redeck as per Bradley. Quantit SLUCSR00051**C LUC IR Redeck 3 A district allocation funded project to redeck and paint the structural steel of 3 bridges over I-475 in the City of Toledo, UPDATE (5-5-11): scope increased from paint to now include redeck as per Bradley. Quantit SLUCIR00475**C SE Sarah St Improvement A SAFETEA-LU funded project to widen, resurface, and install curbs, ADA compliant curb ramps, sidewalks, crosswalks, street lights and landscaping. The project will enhance and promote the safety of pedestrian and vehicular traffic on Sarah St located i SSESR00018**C /08/16 1,355, SE Sarah St Improvement A SAFETEA-LU funded project to widen, resurface, and install curbs, ADA compliant curb ramps, sidewalks, crosswalks, street lights and landscaping. The project will enhance and promote the safety of pedestrian and vehicular traffic on Sarah St located i SSESR00101**C /08/ SA SR Ditch Relo Enclose and or relocate ditch along SR-523 in Sandusky county from SR-19 to SR-53. Then resurface SR-523. Perform necessary Relocating the ditch will cost about $370k while enclosing it will be about $950k. ot eligible for federal funding SSASR00523**C ,600, WIL 20A/2/ /0.00/8.01 Resurface US-20A from SR-15 to SR-107, SR-2 from Defiance Line to US-6, and SR-15 from US-20A to US-127 all in Williams ; Perform necessary UPDATE (4/11/13): added PID UPDATE (4/30/13) SR 2 resurfacing at joint with SWILUS00020*AC ,480, WIL 20A/2/ /0.00/8.01 Resurface US-20A from SR-15 to SR-107, SR-2 from Defiance Line to US-6, and SR-15 from US-20A to US-127 all in Williams ; Perform necessary UPDATE (4/11/13): added PID UPDATE (4/30/13) SR 2 resurfacing at joint with SWILSR00002**C Page 1
2 85269 WIL 20A/2/ /0.00/8.01 Resurface US-20A from SR-15 to SR-107, SR-2 from Defiance Line to US-6, and SR-15 from US-20A to US-127 all in Williams ; Perform necessary UPDATE (4/11/13): added PID UPDATE (4/30/13) SR 2 resurfacing at joint with SWILSR00015**C WOO US Resurf Resurface US-6 in Wood from Henry Line to SR-235; Perform necessary UPDATE: deleted WOO-23 from to & WOO-281 from to which were added to PID extended the end limit of US-20 from to 10.85, mor SWOOUS00006**C /13/16 2,650, LUC Middlegrounds Building an access road and a parking lot at the middlegrounds located in the southeast corner of the intersection of Ottawa St and Clayton St in downtown Toledo near the MLK Plaza; 08/26/15 08/26/15 577, LUC IR Bancroft Ov A project to redeck the Bancroft St bridge over I-75 in the City of Toledo; UPDATE: Originally a stimulus (round 2) candidate, changed funding to Dist. Alloc. & eliminated the "Stimulus 2 Candidate" report code as requeste SLUCIR00075**C ,916, OTT/WOO 51/105/199 0/8. A 2-lane district allocation funded project to resurface; perform necessary UPDATE( ): Added piece of WOO-105 thru Pemberville; UPDATE ( ): added WOO-199 piece and shortened OTT-51 piece. eed to coordinate detour route on SR-51 SOTTSR00051**C /22/16 1,368, OTT/WOO 51/105/199 0/8. A 2-lane district allocation funded project to resurface; perform necessary UPDATE( ): Added piece of WOO-105 thru Pemberville; UPDATE ( ): added WOO-199 piece and shortened OTT-51 piece. eed to coordinate detour route on SR-51 SWOOSR00199**C /22/ OTT/WOO 51/105/199 0/8. A 2-lane district allocation funded project to resurface; perform necessary UPDATE( ): Added piece of WOO-105 thru Pemberville; UPDATE ( ): added WOO-199 piece and shortened OTT-51 piece. eed to coordinate detour route on SR-51 SWOOSR00105**C /22/ LUC SR Resurf A multi-lane district allocation funded project to resurface SR-2 in Lucas from near the Turnpike to near Holloway; UPDATE (10/7/13): modified project limits SLUCSR00002**C /25/15 11/25/15 3,252, LUC Miami St Bridge over A Municipal Bridge Program funded project to replace the superstructure of the existing Miami St bridge over S RR, rehabilitate existing substructure, and reconstruct bridge roadway approaches; CLUCCR00557**C /19/15 06/19/15 2,122, LUC IR Redeck A district allocation funded project to redeck existing 2 span steel girder bridge with sidewalks and vandal fences on each side of the bridge; patch substructure; perform necessary SLUCIR00075**C /25/16 1,069, Page 2
3 90120 LUC IR Redeck A district allocation funded project to redeck the existing 4 span steel bridge with sidewalks and vandal fences on each side of the bridge; SLUCIR00475**C /25/16 907, WOO SR /1.78/2.16/ A district allocation funded project to replace 4 existing structures. Investigate prefabricated structure with safety grading; UPDATE (4-1-11) combined PIDs 90131, & with this PID as recommended by Deb Baldwin ,628, WOO SR /1.78/2.16/ A district allocation funded project to replace 4 existing structures. Investigate prefabricated structure with safety grading; UPDATE (4-1-11) combined PIDs 90131, & with this PID as recommended by Deb Baldwin WOO SR /1.78/2.16/ A district allocation funded project to replace 4 existing structures. Investigate prefabricated structure with safety grading; UPDATE (4-1-11) combined PIDs 90131, & with this PID as recommended by Deb Baldwin WOO SR /1.78/2.16/ A district allocation funded project to replace 4 existing structures. Investigate prefabricated structure with safety grading; UPDATE (4-1-11) combined PIDs 90131, & with this PID as recommended by Deb Baldwin WIL SR 2/ /12.90 WIL SR 2/ /12.90 LUC US Resurf A district allocation funded project to replace 2 existing culverts; one on SR-2 near CR-19 and the other is an existing sinple span concrete slab bridge on SR-576 over St Joseph River overflow; for SR-576 bridge investigate prefabricated structure with s A district allocation funded project to replace 2 existing culverts; one on SR-2 near CR-19 and the other is an existing sinple span concrete slab bridge on SR-576 over St Joseph River overflow; for SR-576 bridge investigate prefabricated structure with s A district allocation funded program to resurface US-20 from Fulton Line to near King Rd; perform necessary related work. UPDATE ( ): It is necessary to do storm sewers repairs/replacement running parallel to US-20 (complaints received from c SWILSR00002**C SWILSR00576**C SLUCUS00020**C , ,787, LUC SR Bridge Pain A major bridge funded project to paint the structural steel of the high level bridge over the Maumee River in Toledo, perform necessary See PID for bridge rehab.; PID for paint inspection. UPDATE ( ): PID deleted SLUCSR00002**C ,500, WOO Fort Meigs Rd Widen A TMACOG funded project to widen Fort Meigs Road, in the City of Perrysburg, from a narrow 2 lane to a standard 2 lane, fromfive Point Rd to High School Drive; perform necessary UPDATE (3/5/13): add a 10 foot paved shared use path on east si TWOOTR00106**C /01/16 1,717, Page 3
4 92747 WOO US Resurf/Br A district allocation funded project to resurface from near Lime City Rd to Lemoyne Access and to replace/rehab 3 bridges; UPDATE ( ): added the resurfacing of US-20. UPDATE ( ): Added SLM 6.51 SWOOUS00020**C ,810, WOO US Resurf/Br A district allocation funded project to resurface from near Lime City Rd to Lemoyne Access and to replace/rehab 3 bridges; UPDATE ( ): added the resurfacing of US-20. UPDATE ( ): Added SLM 6.51 TWOOTR00308**C WOO US Resurf/Br A district allocation funded project to resurface from near Lime City Rd to Lemoyne Access and to replace/rehab 3 bridges; UPDATE ( ): added the resurfacing of US-20. UPDATE ( ): Added SLM 6.51 SWOOUS00020**C OTT CR Brdg Repl LUC SR Urban P A A Fed/State exchange program funded project to replace existing one span steel beam bridge over Turtle Creek in Benton Township, Ottawa, perform necessary related work. An Urban Paving funded project to resurface Central Ave (SR-120) from Secor Rd to Upton Ave in the City of Toledo; perform necessary related work, FIELD REVIEW conducted 5/14/14. HS waiver required. COTTCR00019**C SLUCSR00120**C /03/16 05/07/16 786, ,072, LUC US Urban Pav Resurface Reynolds Rd (US-20) and perform improvements to traffic median; UPDATE ( ): added enhancement (traffic median improvements) earmark funded work to project as part 2. HS waiver required. SLUCUS00020**C /15/16 1,389, LUC US Urban Pav An urban paving funded project to resurface Detroit/Fearing (US-24) from Arlington to I-75 in Toledo; perform necessary HS waiver required. Quantity splits required. SLUCUS00024**C /14/16 3,096, LUC E. Circle Lane Bridge A municipal bridge program funded project to address the East Circle Lane bridge over Ottawa River by replacing its superstructure, rehabilitating its substructure, painting structural steel, and reconstructing approaches. The bridge will be widened to a 10/02/15 10/02/15 859, WOO SR /13.11 R A 2-Lane district allocation funded project to resurface SR-235, Location 2 will start north of the RR track. SWOOSR00235**C ,721, WOO SR /13.11 R A 2-Lane district allocation funded project to resurface SR-235, Location 2 will start north of the RR track. SWOOSR00235**C OTT SR Bridge Reh A district allocation funded project to rehab the existing bridge over Rusha Creek by replacing the existing wearing surface with concrete WS, replacing deck edges and railings, replacing abutment backwalls and wingwalls, replacing approach slab and guard SOTTSR00002**C /25/16 522, Page 4
5 95515 LUC-Chessie Circle Trail Construct a bike/hike trail on abandoned RR track, owned by Toledo Metroparks; See PID for RW Acquis. See PID for former CSX RR bridge removal. 05/27/16 900, SA US College En A TID funded project to construct a roundabout, bridge rehabilitation over Muskellunge Creek and a new entrance to Terra State Communiity College off US6/SR-53, perform necessary UPDATE (9/25/14) added bridge over Muskellunge Creek. SSAUS00006**C ,167, LUC Douglas Rd Reconst/ A TMACOG funded project to widen & reconstruct Douglas Rd from Sylvania Ave to Laskey Rd in the City of Toledo; perform necessary UPDATE ( ): Safety fundng provided to improve intersection of Douglas/Laskey/Tremainsville. CLUCCR00502**C /15/16 6,030, WOO SR25/Gypsy Lane Int A TMACOG funded project to realign intersection of S. Main St (SR25) and Gypsy Lane and add a left turn lane for WB Gypsy Lane traffic in the City of Bowling Green, perform necessary FIELD REVIEW conducted on May 22, HS Waiver requir SWOOSR00025**C /15/16 856, WOO SR25/Gypsy Lane Int A TMACOG funded project to realign intersection of S. Main St (SR25) and Gypsy Lane and add a left turn lane for WB Gypsy Lane traffic in the City of Bowling Green, perform necessary FIELD REVIEW conducted on May 22, HS Waiver requir CWOOCR00324**C /15/ LUC iana Ave Resurf A TMACOG funded "small project" to reconstruct iana Ave from I-75 to Washington St; FIELD REVIEW REQUIRED. CLUCCR00544**C /14/16 659, WOO SR Round LUC IR oisewall M Constructing a roundabout at SR 199 and Roachton Road A project to patch and paint noisewall on I-75 from I-280 to the state line; SWOOSR00199**C SLUCIR00075**C ,497, , D02 TSG F2016 LUC Sylvania/Centennial R A traffic signal maintenance contract Construct a modern roundabout at the intersection of Sylvania Ave and Centennial Rd; CEAO funded project. CLUCCR00005**C /09/16 250, ,283, LUC Sylvania/Centennial R Construct a modern roundabout at the intersection of Sylvania Ave and Centennial Rd; CEAO funded project. CLUCCR00069**C /09/ WOO/LUC 280/ /0.0 A project to resurface I-475 from US-23 to Douglas Rd; perform necessary Split out from PID Added PID as part 2 - IR280 = median inlets w/no pavement improvement. SLUCIR00475**C ,859, WOO/LUC 280/ /0.0 A project to resurface I-475 from US-23 to Douglas Rd; perform necessary Split out from PID Added PID as part 2 - IR280 = median inlets w/no pavement improvement. SWOOIR00280**C Page 5
6 97594 WOO/LUC 280/ /0.0 A project to resurface I-475 from US-23 to Douglas Rd; perform necessary Split out from PID Added PID as part 2 - IR280 = median inlets w/no pavement improvement. SLUCIR00280**C WOO CR321/TR102 Var G OBPP funded project to rehab/replace various bridges in Wood ; perform necssary Deleted Latcha Rd bridge ( ) during second Plan Package submittal. 666, HE/WOO Keyser/CR46 V An OBPP funded project to repair/replace various bridges in Wood and one bridge in Village of Deshler in Henry ; Hen/Woo county Line SF ; Liberty Hi orth Branch SF ; Liberty H Mid Branch SF 8 01/25/16 2,165, WOO CR9/TR92/TR111 Va An OBPP funded project to replace various bridges in Wood ; Invite Rossford to the field review & scoping meeting; City of Rossford is interested in adding sidewalk/multi-use path on Lime City Rd (CR-9) bridge over Gr 1,476, WIL CR Gp 9 F16 An OBPP funded project to replace CR-4 (CR-25) bridge over Owl Creek located about 0.25 mile north of SR-34 in Springfield Township; peform necssary 359, LUC Crabb Rd Gp 5 Muni F An OBPP funded project to replace/rehab bridge on Crabb Rd over Shantee Creek in Toledo; 04/04/16 747, HE Stevenson St Gp 6 F An OBPP funded project to replace a bridge over Oberhaus Creek incity of apoleon; 06/13/16 400, D02 GR F2016 D02 LG F2016 D02 PM F2016 D02 RPM F2016 LUC/OTT280/65/163 Elect Guardrail Maintenance Lighting maintenance contract A pavement marking maintenance contract A raised Pavement Markers (RPM) maintenance program An electrical maintenance contract for 3 bridges; perform necessary 08/19/15 08/19/15 548, , ,651, , , OTT Billman Rd Turnpike M A transportation mitigation funded project to resurface pavement on both ends of Billman Road bridge over the Ohio Turnpike in Ottawa and to tile a ditch in the southwest corner of the overpass; TOTTTR00054**C /12/16 82, OTT Portage Rvr S. Rd Trn A transportation mitigation funded project to repair and stabilize approach enbankements associated with the overpass structure on Portage River South Road spanning the Ohio Turnpike; eed to coordinate with PID for d COTTCR00018**C /19/16 541, SA US Culvert in Replacing an existing deteriorating culvert in City of Clyde; Most likely will replace culvert on existing horizontal & vertical alignments. SSAUS00020**C /04/16 548, OTT SR W Laksh Construct a new sidewalk along the south side of SR-163 (West Lakeshore Dr) in the City of Port Clinton; perform necessary HS waiver required. SOTTSR00163**C /07/16 239, Page 6
7 98918 WOO Bradner Presrv Drive/ Addition of a stone drive and 50 car parking lot to allow public access to new park land; 05/20/16 82, OTT CR Resurf Resurface CR-6 in Ottawa ; perform necessary related work. COTTCR00006**C /06/16 739, LUC Shipyard Access Rd A small TMACOG funded project to resurface shipyard access road in the Port of Toledo; 125, WOO Maumee River MUP Maumee River Multi-Use Path Phase 2 in Perrysburg; perform necessary See PID for Ph 3 & others. SWOOSR00065**C /17/16 100, LUC/OTT-280/65/163 Opr F A contract to operate 3 bridges; perform necessary related work. 08/19/15 08/19/15 462, SE CR10/35/61 Resurf Resurface CR10, CR35 and CR 61 in Seneca ; perform necessary CSECR00010**C ,930, SE CR10/35/61 Resurf Resurface CR10, CR35 and CR 61 in Seneca ; perform necessary CSECR00035**C SE CR10/35/61 Resurf Resurface CR10, CR35 and CR 61 in Seneca ; perform necessary CSECR00061**C SE CR Var GR F16 A CEAO funded project to install/repair guardrails on various routes in Seneca ; Two projects combined into one and moved up from F-18. CSECR00001**C , LUC Olander Park Rdwy/Prk An OPRA funded project to resurface roadway and parking lots in Olander Park, Sylvnia Park System; perofrm necessary 10/19/15 10/19/15 191, D02 MOW F2016 A district wide mowing contract; perform necessary related work. 04/04/16 677, LUC VGCS/Craig Maint F2 A contract to address various outstanding issues of the VGCS bridge; (Seal the main pylon from 1 feet above water up to the deck). ). Also to patch portions of the Craig bridge substructure that were not completed from the 615, D02 BH F2016 Perform repairs and apply asphalt overlays to various bridges districtwide; perofrm necessary 456, HE/OTT-US6/SR /2 Perform repairs on 3 bridges; perform necessary related work. Coordination with SRR not required. 900, LUC US20A/SR2 0.30/2.23 A project to resurface US-20A and SR-2, all in Lucas ; SLUCUS00020*AC ,350, LUC US20A/SR2 0.30/2.23 A project to resurface US-20A and SR-2, all in Lucas ; SLUCSR00002**C OTT/WOO SR /0.00 Resurface pieces of SR-51 in Ottawa and Wood Counties; SOTTSR00051**C /18/16 1,810, OTT/WOO SR /0.00 Resurface pieces of SR-51 in Ottawa and Wood Counties; /18/ SA US Micro Resurface US-6 by applying microsurfacing; perform necessary SSAUS00006**C /04/16 582, WOO/SE 105/ /0.0 Resurface SR-105 in Wood and SR-162 in Seneca ; perform necessary related work SSESR00162**C ,800, Page 7
8 WOO/SE 105/ /0.0 Resurface SR-105 in Wood and SR-162 in Seneca ; perform necessary related work SWOOSR00105**C WOO/SE 105/ /0.0 Resurface SR-105 in Wood and SR-162 in Seneca ; perform necessary related work SWOOSR00105**C D02 PS F2016 (A) Resurface FUL-108, WIL-34, and WIL-49 by chip sealing; SFULSR00108**C , D02 PS F2016 (A) Resurface FUL-108, WIL-34, and WIL-49 by chip sealing; SWILSR00049**C D02 PS F2016 (A) Resurface FUL-108, WIL-34, and WIL-49 by chip sealing; SWILSR00034**C D02 PS F2016 (B) Resurface various routes by chip sealing; perform necessary SOTTSR00795**C , D02 PS F2016 (B) Resurface various routes by chip sealing; perform necessary SSESR00019**C D02 PS F2016 (B) Resurface various routes by chip sealing; perform necessary SSASR00019**C WOO SR L/R Brid Remove existing micro silica concrete wearing surface & replace with SDC wearing surface; replace existing drip seals SWOOSR00795**C ,220, LUC SR Brdg Patch An emergency project to perform full depth patching to the Dorr ST bridge deck over I-75; 10/20/15 10/20/15 75, LUC IR280 Fire Repair Repair damage due to truck fire accident on the VGCS; perform necessary 200, HE US Brdg Dama Repair culvert headwall on US-24 in Henry ; perform necessary 30, $117,692,582 Page 8
Fall 2017 Construction Update
Fall 2017 Construction Update Ward 4 Southeast Engineering Department Riverwalk Red Multi-Use Trail Bridge Rehabilitation The Riverwalk Red Multi Use Trail Bridge was awarded to Cramer and Associates,
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
69th Street Bridge 02311 02311 A grade separation at 69th Street would eliminate the current at-grade crossing which causes frequent automobile delays due to long freight trains moving through this area.
More informationMoving The Metro. A special construction update for the metro Omaha area.
Moving The Metro A special construction update for the metro Omaha area. ebraska Department of Roads Spring/Summer 2017 I-80 / I-480 / US-75 Interchange The improvements on this project consist of bridge
More informationSpring 2018 Construction Update
Spring 2018 Construction Update Ward 3 Southwest Engineering Department Locust Street Bridge over the Des Moines River The Locust Street Bridge over the Des Moines River project is being let through the
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
ROUTE/ Project ID No. TIP No. Burlington County Computerized Signal Control, IV D9911 D9911 This ITS project will be a traffic responsive signal system, consisting of 24 intersections--9 on CR 607, 4 on
More informationMEMORANDUM. Attachments:
MEMORANDUM To: Technical Advisory Committee, Board of Directors From: MVRPC Staff Date: November 13, 2014 Subject: SFY2014-SFY2017 Transportation Improvement Program (TIP) Amendment #15 Over the last few
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
Garden State Parkway, Interchange 67, at Bay Avenue, CR 554 NS0210 NS0210 This project will provide new and modified movements to the Garden State Parkway, Interchange 67 at Bay Avenue (CR 554). Currently,
More informationCONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE
CONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE CITY STREETS AS PART OF STATE HIGHWAYS GUIDELINES REACHED BY THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
Route 1&9, County Road 99380 99380 Improvements are planned at the Route 1&9, County Road intersection to address operational and safety issues in the vicinity of Manhattan Avenue and County Road. COUNTY:
More information2018 Primary Road Capital Improvement Plan (CIP) Projects Preservation / Structural Improvement, Non-motorized and Engineering Design Projects
2018 Primary Road Capital Improvement Plan (CIP) Projects Preservation / Structural Improvement, Non-motorized and Engineering Design Projects Preservation / Structural Improvement Projects in 2018 Ravine
More information2017 Investment in Infrastructure Expo February 28, 2017 Jason Jonas, P.E. Public Works Director
2017 Investment in Infrastructure Expo February 28, 2017 Jason Jonas, P.E. Public Works Director 1 Jefferson County, Missouri Road and Bridge Sales Tax: Jefferson County has a one-half cent sales tax that
More informationFY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects
Schooleys Mountain Bridge Rehabilitation Project ID Numbers: N1707 / 173470 Schooleys Mountain Road Bridge was built in 1920 and widened in 1937. The project is a replacement of the bridge structure and
More informationInterstate Traffic Interruptions Weekend of Oct 9, 2015-Oct 12, 2015
Interstate Traffic Interruptions Weekend of Oct 9, 2015-Oct 12, 2015 District 1 10/9/15 10/12/15 D Gwinnett/Hall I-985 NB MP 0 (I-85) 9pm 5am 1 right lane of 2 458462 to MP 20 (SR 60) ROLLING CLOSURE 10/9/15
More informationSR 483 Clyde Morris Boulevard FDOT District 5
This project occurs on a 3.0 mile section of SR 483 (Clyde Morris Blvd.) south of Beville Road (SR 400) to north of International Speedway Boulevard (SR 600). Ghyabi is providing project management and
More informationDESIGN SCENE SUBJECT INDEX
DESIGN SCENE SUBJECT INDEX CHAPTER 1: TITLE SHEET and GENERAL LAYOUT AREA OF ENVIRONMENTAL SENSITIVITY BRIDGE & APPROACH PLANS CONSTRUCTION PLAN FOR EXCEPTIONS EXCEPTION CLARIFICATION GOVERNING SPECIFICATIONS
More informationVictoria Bridge Municipal Class EA Civic Works Committee
Municipal Class EA John Pucchio, P. Eng., Project Manager June 19 2018 Introduction Existing Conditions Municipal Class EA Proposed Bridge Proposed Road Reconstruction Proposed Improvements Construction
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)
ADA Central, Contract 1 DBNUM: 15417 / UPC: 154170 This contract will bring projects into compliance with current ADA design requirements that could not be completed within original design or construction
More informationConstruction Engineering & Inspection
Construction Engineering & Inspection Serving Florida for 20 Years CEI Engineering Planning Landscape Architecture Urban Design Construction Engineering & Inspection (CEI) I N T R O D U C T I O N Over
More informationFY 2005 TRANSPORTATION CAPITAL PROGRAM
Camden County Civic Center Access Study, Pennsauken 03340 This project will address operational and access improvements on Routes 30, 73 and 90 related to the Crossroads redevelopment project around the
More informationFOR IMMEDIATE RELEASE DATE: FRIDAY, AUGUST 31, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP?
FOR IMMEDIATE RELEASE DATE: FRIDAY, AUGUST 31, 2018 Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP? Sign up for RCKC CONNECT to receive message alerts for road construction,
More informationAGENDA ACTION ITEMS INFORMATION ITEMS
NOACA Bicycle and Pedestrian Advisory Council Meeting Friday, March 21 st, 2014 10:30 a.m. NOACA Office 1299 Superior Avenue Cleveland, Ohio 44114 Phone: (216) 241-2414; website: www.noaca.org AGENDA ACTION
More informationCapital Projects impacting Odenton Town Center
Capital Projects impacting Odenton Town Center 1 2 E549700 W801600/ W801602 Anne Arundel County Department of Public Works Manor View Elementary School Transmission Main - MD 32 @ Meade Phase 2 $34,399,000
More informationProposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects
Carteret Industrial Road 98547 This project will address the upgrade of Carteret Industrial Road. The federal Transportation Equity Act for the 21st Century (TEA-21) provided funding for this project under
More informationProject will Replace: Utilities Curb Pavement Lighting. City of Madison
Project will Replace: Utilities Curb Pavement Lighting Replace sanitary sewer main & laterals Winnebago: Existing 8 main, 1905 Linden: Existing 6 main, 1915, upsize to 8 main Atwood: Existing 12 main,
More informationFY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects
Route 18, South of Texas Road to Rues Lane, Pavement Project ID Numbers: 11408 / 114080 Initiated from the Pavement Management System, this project will rehabilitate pavement within the project limits.,
More informationHighway 417 Expansion East
Highway 417 Expansion East Nicholas Street to Ottawa Road 174 GWP 4091-07-00 & GWP 4320-06-00 Outline Project Overview Highway 417 Widening Bridge Rapid Replacements Traffic & Incident Management Project
More informationTRANSPORTATION COMMITTEE
TRANSPORTATION COMMITTEE CITY OF OTTAWA Ministry of Transportation Detailed Design Assignment G.W.P.# 4058-01-00 Highway 417 (Ottawa Queensway) Widening & Rehabilitation from Maitland Avenue to Island
More informationProposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects
30 130 Collingswood/Pennsauken ( B) 155C Vicinity of Cooper River Bridge at Park Drive to 200 feet north of PATCO Railroad Bridge This project may provide for the construction of a proposed new bridge
More informationODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR SONJA R. SIMPSON, DISTRICT DEPUTY DIRECTOR
ODOT DISTRICT 5 2018 CONSTRUCTION PROGRAM SERVING COSHOCTON, FAIRFIELD, GUERNSEY, KNOX, LICKING, MUSKINGUM, AND PERRY COUNTIES JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR SONJA R. SIMPSON,
More information2017 Capital Improvements Report
2017 Capital Improvements Report March 20, 2017 Board of County Commissioners Butler County Government Services Center 315 High Street Hamilton, Ohio 45011-2759 RE: 2017 Capital Improvements Report Board
More informationPennDOT Public Meeting. S.R. 3044, Section A01 Castle Shannon Boulevard Roadway Improvement Project
PennDOT Public Meeting S.R. 3044, Section A01 Castle Shannon Boulevard Roadway Improvement Project Mt Lebanon Township, Allegheny County Mt Lebanon Township Municipal Building November 6, 2014 1 Project
More informationFrom local initiatives to some of the largest and most complex projects, KOA leads the field in:
Krech Ojard & Associates offers a highly capable multidisciplined team that provides the professional services needed to deliver successful transportation facility improvements. Our team provides multidisciplinary
More informationNew Stanton Project Update July 3, 2012
New Stanton Project Update July 3, 2012 The Needs BACKGROUND INFO I-70 Geometric Concerns Substandard Horizontal & Vertical Clearance at Center Ave. Bridge (The Center Avenue Bridge is Replaced in all
More informationI-75/I-475 Interchange Upgrade Project Informational Meeting Tuesday, July 27, 2010
I-75/I-475 Interchange Upgrade Project Informational Meeting Tuesday, July 27, 2010 I-75/I-475 Interchange Upgrade Project David R. Dysard, AICP District Two Deputy Director Theresa Pollick Public Information
More informationBRIDGE REHABILITATION ANALYSIS AND FEASIBILITY REPORT
BRIDGE REHABILITATION ANALYSIS AND FEASIBILITY REPORT SR 0016-037 Main Street Bridge Project Memorial Bridge over the West Branch of Little Antietam Creek in Waynesboro Borough and Washington Township
More informationTRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES
TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES GOAL 2 The City shall provide a safe, convenient, effective, and energy efficient multimodal transportation system which is coordinated with the Future
More informationPage. I. Introduction 1. II. Project Purpose and Need 2. IV. Description of Section 4(f) Property 2. V. Impacts to Section 4(f) property 3
Table of Contents Programmatic Section 4(f) Evaluation for use of a Historic Bridge Replacement of Route 30/130 Bridge over the Cooper River Structure No. 0405-153 City of Camden, Borough of Collingswood,
More informationCTH C RESURFACING Douglas County, Wisconsin
Krech Ojard s Civil Group provides full range design and construction management services for municipal transportation and utility projects, as well as a variety of private developments. With a staff possessing
More informationMunicipal Class EA Study Public Information Centre No. 1 December 13, :00 pm 7:00 pm. Please sign in so we can keep you updated on this study
Reconstruction of Regional Road 45 (Creek Road) Between Regional Road 27 (River Road) and Regional Road 63 (Canborough Road) in the Township of Wainfleet Municipal Class EA Study Public Information Centre
More informationJOB CREATION PROJECTS
SPRINGDALE INFRASTRUCTURE DEVELOPMENT PLAN JOB CREATION PROJECTS The following pages provide a narrative description, preliminary street alignment and a preliminary construction cost estimate for each
More informationConcluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates).
Pelican Bay Community Improvement Plan Traffic,JI Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates). D1 -A: Provide consistent signing, marking
More informationTHREE-YEAR CAPITAL IMPROVEMENT PLAN FY
THREE-YEAR CAPITAL IMPROVEMENT PLAN FY2016 2018 Annual CIP Development Process Public Works & Engineering Divisions Prepare List of Capital Needs and Recommended Deferred Maintenance Public Works & Engineering
More informationCapital Projects in and near Odenton Town Center
Capital Projects in and near Odenton Town Center Map ID Anne Arundel County Department of Public Works This project provides for the design, right of way acquisition, and construction of approximately
More informationTRANSPORTATION & STREET DESIGN
TRANSPORTATION & STREET DESIGN Review of Goals Connect neighborhoods to Square Enable access to the river Improve pedestrian environment Reorient road network to local use Three Specific Areas of Intervention
More informationIndex to Projects by Project Name
Index to Projects by Project Name Project # PROJECT NAME PAGE 2134 2119 PR-1109 Clayton Road (Market Street to Oakland Avenue) Sidewalk Repair 911 System Replacement and Dispatch Room Remodel ADA Barrier
More informationPROJECTS UNDER CONSTRUCTION
Project Name Project Status Project Funding Project Manager PJ 2144 Clayton Rd-Treat Blvd Intersection Improvements Widen the Clayton Road/Treat Blvd intersection and upgrade the traffic signal. Construction
More informationBID RESULTS OCTOBER 24, 2007
INTERSTATE A20 83068 (NF0)PM04-026-248, N501 IM-PM04(223) VARIOUS LOCATIONS DINWIDDIE CO. ASPHALT PAVING & GUARDRAIL UPGRADE B. P. SHORT & SON PAVING CO., INC. PETERSBURG, VA 1 $1,262,410.02 N9J CM408A09431
More informationCottage Grove Road Reconstruction. City of Madison Engineering
Public Informational Meeting Cottage Grove Road Reconstruction October 8, 2015 Presentation Outline Introduction Project Purpose & Need Proposed Design Overview Environmental Concerns Pedestrian Needs
More informationST. CLAIR COUNTY ROAD COMMISSION ANNUAL REPORT
ST. CLAIR COUNTY ROAD COMMISSION 2017-2018 ANNUAL REPORT Timothy LaLonde, Chairman William Blumerich, Vice-Chairman Kenneth Foerster, Commissioner Kirk Weston, Managing Director BRIDGE MAINTENANCE PROGRAM
More information2018 Capital Improvements Report
2018 Capital Improvements Report March 19, 2018 Board of County Commissioners Butler County Government Services Center 315 High Street Hamilton, Ohio 45011-2759 RE: 2018 Capital Improvements Report Board
More informationFocus Group First Meeting Belfountain Community Centre Tuesday June 29, :00 p.m. to 9:00 p.m.
Focus Group First Meeting Belfountain Community Centre 7:00 p.m. to 9:00 p.m. Mississauga Road/Old Main Street and Bush Street, from Olde Base Line Road to Winston Churchill Boulevard Environmental Assessment
More informationCENTERTON ROAD BRIDGE REPLACEMENT
CENTERTON ROAD BRIDGE REPLACEMENT FEASIBILITY STUDY BURLINGTON COUNTY BRIDGE C4.4 OVER RANCOCAS CREEK TOWNSHIPS OF MOUNT LAUREL, WESTAMPTON & WILLINGBORO 1 prepared for: BOARD OF CHOSEN FREEHOLDERS BURLINGTON
More information2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015
AGENCY: 2016 REVISIONS COMMENT FORM Section Title Number Chapter 1 Introduction Comment 1.1 CDOT Mission Statement 1.2 Purpose of Rules and Regulations for Construction in the Public Way 1.3 Chicago Department
More informationNuts and Bolts (or Gravel and Asphalt) of the Main Street Project
Nuts and Bolts (or Gravel and Asphalt) of the Main Street Project What is the Main Street Project? The Main Street Project is a roadway project that addresses pavement, infrastructure and safety issues
More informationMunicipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights
ANCHORAGE PARKS & RECREATION Nichols Park Design and improve neighborhood park 2008 Challenge Grant applicant. 2008 $500K State Grant for Neighborhood Parks. Tikishla Park Lighting, paved parking, hockey
More informationDerby-Shelton Bridge Pedestrian and Bicyclist Enhancements [1]
nhancements [1] STATUS OF PROJECT: The project has recently moved from the Preliminary Design Phase to the Final Design Phase following the most recent Public Involvement Meeting held on January 9, 2019
More informationCity of Cedar Rapids Public Works Tentative Bid Schedule Issued December 4, 2017 *Subject to Change*
12/6/2017 3012115-03 Northwood Dr NE, Glass to s/o Brookland $980,000.00 J. 4/16/2018 12/13/2017 3012121-02 O Ave NW, 16th to Ellis $4,065,000.00 Tippe; Lee J. 3/19/2018 Collins Rd NE from E of Northland
More informationThe Ambassador Bridge/ Gateway Project
The Ambassador Bridge/ Gateway Project Connecting Neighbors & Driving the Economy 2008 Ohio Conference on Freight Given by the Toledo Metropolitan Area Council of Governments, National Association of Regional
More informationConst. ROADS - Description
Road Projects make up the bulk of the capital expenditures for the township. For the term of this CIP, road projects total $9,843,000 or 72.0% of the total capital expenditures for all capital projects
More informationThe Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass
The Illinois Department of Transportation and Lake County Division of Transportation welcome you to this Public Hearing for U.S. Route 45 from Illinois Route 132 to Illinois Route 173, including the Millburn
More informationSouthern Windsor County RPC Transportation Project Priorities January 2015
Southern Windsor County RPC Transportation Project Priorities January 205 The Southern Windsor County Regional Planning Commission (the RPC) has been evaluating and prioritizing transportation projects
More informationLocation. Served. Category. Units Start Year. Previous Appropriations
20142018 CAPITAL IMPROVEMENT PLAN ($ Thouss) CITY OF HOUSTON STREET & TRAFFIC CONTROL Project: TC Jester: Washington to I 10 N100002 Paving Drainage Project Description Project provides for the design
More informationProject Description WOO/LUC-SR /0.00. Waterville Bridge Replacement
Ohio Department of Transportation District 2 317 East Poe Rd. Bowling Green, Ohio 43402 (419) 353-8131 John R. Kasich, Governor Jerry Wray, Director Todd Audet, P.E., District Deputy Director Project Description
More informationProject Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006
Project Goal Town of Halifax Revitalization Project RRRC Living Towns Planning Workshp July 12, 2006 Town of Halifax Halifax County *** Revitalization Project Goal*** To create Economic Opportunity and
More informationProject Purpose. Project Need
Project Purpose The purpose of the project is to implement a bridge improvement solution that corrects the existing safety problem at the Strasburg Pike Bridge. The project will provide a structurally
More information2040 Long Range Transportation Plan
2040 Long Range Transportation Plan Adopted: April 15, 2013 APPENDIX D HIGHWAY NEEDS PLAN PROJECTS FREDERICKSBURG Existing and Committed Projects Fall Hill Avenue/Mary Washington Blvd. (Fredericksburg)
More informationPROPOSED IMPROVEMENTS
IV. PROPOSED IMPROVEMENTS The proposed improvements for each alternative carried forward are discussed below. A. FUNCTIONAL CLASSIFICATION AND ROADWAY CROSS-SECTIONS The classifications of the roadways
More informationFDOT D4 Complete Streets
FDOT D4 Complete Streets Context Sensitive Solutions Directs that complete street solutions will complement the context of the community. Collaborative approach to decision making, project development,
More informationSacramento County - Department of Transportation
Sacramento County - Department of Transportation Proposed Projects to be Funded with Road Maintenance and Rehabilitation Account Funding FY 2017-18 Project Description AC Overlay Projects - Federal: Rehabilitate
More information3.1 Survey Monument Preservation Guidelines for New and Reconstruction Projects. B. After construction and prior to recording Notice of Completion:
3.0 SURVEY 3.1 Survey Monument Preservation Guidelines for New and Reconstruction Projects A. Prior to construction: 1. Public survey records are to be researched for the location of all possible survey
More informationSouthern Windsor County RPC Transportation Project Priorities Methodology January 2016
Southern Windsor County RPC Transportation Project Priorities Methodology January 2016 The Southern Windsor County Regional Planning Commission (the RPC) has been evaluating and prioritizing transportation
More informationCOMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING
COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING Subject: Recommendation Prepared by: PRELIMINARY DESIGN REVIEW OF LOCUST STREET BRIDGE CONSTRUCTION & COURT AVENUE,
More information2014 PSPE Philadelphia Chapter Outstanding Engineering Achievement Award Nomination
2014 PSPE Philadelphia Chapter Outstanding Engineering Achievement Award Nomination Route 29 Roadway Improvement Project SR 0029, Section AL2 Charlestown Township, Chester County, PA Nomination Form Route
More informationWest Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons
West Dennis Center: Bass River to Old Main Street West Dennis Business District: Old Main Street to Dennis Commons Dennisport Center: Dennis Commons to Division Street Main Street Project Goals Project
More informationSt. Louis Engineering and Transportation Services
St. Louis Engineering and Transportation Services Amec Foster Wheeler s St. Louis office, with over 80 professional and support personnel, provides excellence in engineering and professional consulting
More informationPURPOSE AND NEED FOR THE VROOMAN ROAD BRIDGE and ROADWAY IMPROVEMENT PROJECT
PURPOSE AND NEED FOR THE VROOMAN ROAD BRIDGE and ROADWAY IMPROVEMENT PROJECT PERRY AND LEROY TOWNSHIPS, LAKE COUNTY, OHIO (PID 5669/PID 85131) PREPARED BY: MICHAEL BAKER JR., INC. 1228 EUCLID AVENUE SUITE
More informationWELCOME 50 street cp rail grade separation + road widening. public information session #1 June 26, pm to 8 pm
WELCOME 50 street cp rail grade separation + road widening public information session #1 June 26, 2018 5 pm to 8 pm session purpose To provide residents, businesses, and users of 50 Street with the opportunity
More informationINFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities
7.01. EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities 7.02. PROPOSED INFRASTRUCTURE A. Overall Concept B. Circulation C. Signals D. Drainage 7.03. INFRASTRUCTURE MAP A. Key Infrastructure
More informationCreative Engineering Group Inc, (Creative) Construction Engineering and Inspection (CEI) Professionals
ABOUT US Creative Engineering Group Inc, (Creative) is a Construction Engineering and Inspection (CEI) firm established in 2006 by two Principals Rick Estripeaut & Sri Mavanur. In the last decade Creative
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM Transportation Authorities Project Descriptions
Bridge Rehabilitation Burlington County Bridge Commission Burlington-Bristol Bridge This project includes the replacement of the existing span decks, repairs to the existing walkway, railing and ladder
More informationPublic Information Centre. Welcome
Transportation Improvements from the Beaver Creek Bridge to the Entrance of Santa s Village District of Muskoka Municipal Class Environmental Assessment Welcome Please sign in Take a comment sheet Staff
More informationRoads Plan
Roads Plan 2019-2023 Background Road conditions have been a problem for Painesville City over the past decade. Between 2009 and 2013, the city was only able to dedicate $1.9 million in total road repairs
More informationHow can landscape architects aide in transportation planning process? John Dempsey, PLA Toole Design Group July 24, 2015
How can landscape architects aide in transportation planning process? John Dempsey, PLA Toole Design Group July 24, 2015 What is Landscape Architecture? Landscape Architecture 1863 What is Landscape Architecture?
More informationRt. 29 Solutions Project Delivery Advisory Panel. December 3, 2015
Rt. 29 Solutions Project Delivery Advisory Panel December 3, 2015 Agenda item 1: Introductions Project Delivery Advisory Panel Technical Team 2 Agenda item 2: Interaction and Feedback Live Streaming Nov
More informationMetroParks Board Meeting 2018 Capital Improvement Projects
MetroParks Board Meeting 2018 Capital Improvement Projects Stephen L. Avery Planning & Operations Director Last Edited: 3.12.18 Presentation Outline MetroParks Mission Statement Strategic Master Plan MetroParks
More informationJuly 12, Columbus City Council City Hall 90 West Broad Street Columbus, OH RE: I-70/71 Columbus Crossroads Project
OHIO DEPARTMENT OF TRANSPORTATION DISTRICT 6 400 EAST WILLIAM STREET DELAWARE, OHIO 43015 800.372.7714 Columbus City Council City Hall 90 West Broad Street Columbus, OH 43215-9015 RE: I-70/71 Columbus
More informationHighway & Bridge Capabilities
Highway & Bridge Capabilities Part of a diversified family of solutions www.jmt.com An Employee Owned Company I-95/I-295/I-495 Interchange, Woodrow Wilson Memorial Bridge, Prince George s County, MD Our
More informationDaniel J. Sporik, P.E. Civil Engineer
Daniel J. Sporik, P.E. Civil Engineer Work Experience Areas of Expertise Transit Planning and Design Highway Design Stormwater Management Hydraulics and Hydrology Erosion and Sediment Control Years of
More informationConcord, BRF-X-5099 (021), Draft Alternative Analysis
THE CITY OF CONCORD in conjunction with the STATE OF NEW HAMPSHIRE, DEPARTMENT OF TRANSPORTATION BUREAU OF ENVIRONMENT and the FEDERAL HIGHWAY ADMINISTRATION Concord, BRF-X-5099 (021), 12004 Draft Alternative
More informationRezoning Transportation Analysis Petition Number: General Location Identifier:
From: Kelsie Anderson, PE Kelsie.Anderson@charlottenc.gov 704-432-5492 Staff Reviewer: Kory Hedrick, PE, PMP Khedrick@charlottenc.gov 704-432-6511 CDOT s review of this rezoning petition is intended to
More informationClay Street Bridge Replacement Project
Clay Street Bridge Replacement Project Frequently Asked Questions (FAQs) No. 2 April 4, 2018 The project is located in downtown Placerville on Clay Street between US Highway 50 and Main Street and Cedar
More informationDESIGN PUBLIC HEARING MAY 10, 2018 GRANBY TOWN HALL FIRST FLOOR CONFERENCE ROOM 10 WEST STATE STREET GRANBY, MASSACHUSETTS 7:00 PM FOR THE PROPOSED
DESIGN PUBLIC HEARING MAY 10, 2018 AT GRANBY TOWN HALL FIRST FLOOR CONFERENCE ROOM 10 WEST STATE STREET GRANBY, MASSACHUSETTS 7:00 PM FOR THE PROPOSED Reconstruction of Granby Road/West State Street (Route
More informationPRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016
PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016 The following items are required for the preliminary plat. Numbers correspond with those on the example preliminary plat. RENO COUNTY SUBDIVISION REQUIREMENTS
More informationRt. 29 Solutions Project Delivery Advisory Panel. January 7, 2016
Rt. 29 Solutions Project Delivery Advisory Panel January 7, 2016 Agenda item 1: Introductions Project Delivery Advisory Panel Technical Team 2 Agenda item 2: Interaction and Feedback Live Streaming Dec
More informationWELCOME TO THE PUBLIC INFORMATION CENTRE. Please Sign In
WELCOME TO THE PUBLIC INFORMATION CENTRE Replacement of Oxtongue Lake Narrows Bridge & Oxtongue River Bridge, Highway 60 (G.W.P. 93-89-00 & G.W.P. 5550-04-00) Class Environmental Assessment (Group B) Please
More informationPort of Seattle Street Vacations Summary April, 2016
Port of Seattle Street Vacations Summary April, 2016 Since the question of street vacations provided to the Port was raised at the April 19 Sustainability and Transportation Committee, the Port is providing
More informationMAIN STREET DESIGN GUIDELINES CONTEXT
MAIN STREET DESIGN GUIDELINES CONTEXT VISION The re-imagining of Main Street offers an unparalleled opportunity to strengthen and link Fredericton North through the integration of local neighbourhoods,
More informationPublic Meeting. US Highway 14 (6TH Street) from Main Ave to Medary Ave Urban Reconstruction Project Brookings, SD P-PH 0014(179)419 PCN 027B
Public Meeting US Highway 14 (6TH Street) from Main Ave to Medary Ave Urban Reconstruction Project Brookings, SD P-PH 0014(179)419 PCN 027B Mark Leiferman Chief Road Design Engineer April 28, 2014 Why
More informationOpen House RIVER DES PERES GREENWAY: LANSDOWNE SHREWSBURY METROLINK TO FRANCIS R. SLAY PARK
Open House 10.12.16 RIVER DES PERES GREENWAY: LANSDOWNE SHREWSBURY METROLINK TO FRANCIS R. SLAY PARK MEETING AGENDA Great Rivers Greenway and Project Partners River des Peres Greenway Overview Project
More informationConstruction Engineering & Inspection Services Transit Bus Stop Infrastructure for the Broward County Transit Division (BCT)
Construction Engineering & Inspection Services Transit Bus Stop Infrastructure for the Broward County Transit Division (BCT) 1 Firm Overview 2 We are a well established multi disciplinary firm that has
More information