1 Executive Committee Meeting #9/13 Chair: Vice Chair: Members: Gerri Lynn O'Connor Maria Augimeri Ben Cachola Ronald Chopowick Glenn De Baeremaeker Michael Di Biase Jack Heath Colleen Jordan Gloria Lindsay Luby Mike Mattos Jim Tovey Richard Whitehead November 1, :30 A.M. WESTON ROOM B, BLACK CREEK PIONEER VILLAGE AGENDA EX1. MINUTES OF MEETING #7/13, HELD ON OCTOBER 4, 2013 Minutes Summary Enclosed Herewith on PINK EX2. EX3. EX4. EX5. EX6. BUSINESS ARISING FROM THE MINUTES DISCLOSURE OF PECUNIARY INTEREST AND THE GENERAL NATURE THEREOF DELEGATIONS PRESENTATIONS CORRESPONDENCE 1

2 EX7. SECTION I - ITEMS FOR AUTHORITY ACTION EX7.1 TRIDEL CORPORATION Request for a Permanent Easement for a Sanitary Sewer Upgrade to Service Developments at 1 Old Mill Drive in the City of Toronto, Humber River Watershed CFN EX7.2 GREENLANDS ACQUISITION PROJECT FOR Flood Plain and Conservation Component, Humber River Watershed Ravines of Islington Holdings Inc. CFN EX7.3 GREENLANDS ACQUISITION PROJECT FOR Flood Plain and Conservation Component, Humber River Watershed Averton Common (Kleinburg) Inc. CFN EX7.4 GREENLANDS ACQUISITION PROJECT FOR Flood Plain and Conservation Component, Humber River Watershed Delmanor Prince Edward Inc. CFN EX7.5 GREENLANDS ACQUISITION PROJECT FOR Flood Plain and Conservation Component, Don River Watershed Ontario Inc. CFN EX7.6 EX7.7 EX7.8 USE OF RESOURCES DURING AN ELECTION Approval of Toronto and Region Conservation Authority Policy FEE SCHEDULE FOR PUBLIC FACILITIES AND PROGRAMMING 54 PLANNING AND PERMIT ADMINISTRATION Continuous Strategic Improvements and Delegation of Permit Approvals Report to Follow EX8. SECTION II - ITEMS FOR EXECUTIVE ACTION EX8.1 ENVIRONICS ANALYTICS LTD. Report to Follow EX9. SECTION IV - ITEMS FOR THE INFORMATION OF THE BOARD 2

3 EX10. ONTARIO REGULATION 166/06 PERMIT APPLICATION EX EX10.3 ARE MAJOR APPLICATIONS Applications that involved a more complex suite of technical studies to demonstrate consistency with policies; applications that cover a significant geographic area (e.g. subdivisions, stormwater management ponds), extensive modifications to the landscape, major infrastructure projects, emergency works, resolution of violations/after the fact permits, trail construction CITY OF BRAMPTON EX10.1 CITY OF BRAMPTON To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material originating on the site or elsewhere and alter a watercourse on Countryside Drive between Bramalea Road and Torbram Road in the City of Brampton, Humber River Watershed, as located on property owned by the City of Brampton or through easement agreements. The purpose is to widen Countryside Drive from Bramalea Road to Airport Road. This project has been divided into 2 separate permits (CFN and 49863). This application (CFN 40845) covers the widening of Countryside Drive from Bramalea Road to Torbram Road including the replacement of an undersized culvert with a bridge at the H3 tributary crossing, construction of a sidewalk on the south side and a multi-use path on the north side of the road. The redside dace timing window will apply to any in or near water work at the H3 tributary (approximately Station ) and the warmwater fisheries timing window will apply to the watercourse that outlets just east of Torbram Road, unless otherwise specified in writing by the Ministry of Natural Resources (MNR). A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans anada (DFO). 57 3

4 EX10.2 CITY OF BRAMPTON To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Countryside Drive between Torbram Road and Airport Road, in the City of Brampton, Humber River Watershed as located on property owned by the City of Brampton or through easement agreements. The purpose is to widen Countryside Drive from Bramalea Road to Airport Road. This project has been divided into 2 separate permits (CFN and 49863). This application (CFN 49863) covers the widening of Countryside Drive from Torbram Road to Airport Road including realigning the road to eliminate the jog which currently exists approximately midway between Torbram Road and Airport Road. A sidewalk will be constructed on the south side and a multi-use path on the north side of the road. The warmwater fisheries timing window will apply to the watercourse located at approximately Station , unless otherwise specified in writing by the Ministry of Natural Resources (MNR). A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). 59 CITY OF MARKHAM EX10.3 CITY OF MARKHAM To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and interfere with a wetland on Lot 9, Concession 5, (8307 Warden Avenue), in the City of Markham, Rouge River Watershed as located on the property owned by City of Markham. The purpose is to undertake works within a Regulated Area of the Rouge River Watershed to facilitate the construction of a wetland as part of a compensation package associated with the construction of various infrastructure works associated with an approved plan of subdivision. 61 PERMIT APPLICATIONS EX10.4 IS A MAJOR ERRATA ITEM Staff's recommendation for approval is based upon the review and acceptance of additional information from the applicant. The applicant has been informed that the information outstanding must be reviewed and accepted by staff prior to the Executive Committee Meeting. Staff will advise that this application be withdrawn from the Executive Committee Agenda should this information remain outstanding. CITY OF BRAMPTON EX AIRPORT ROAD DEVELOPMENTS INC. To construct, reconstruct, erect or place a building or structure and site grade at 7900 Airport Road, in the City of Brampton, Mimico Creek Watershed as located on the property owned by 7900 Airport Road Developments Incorporated. The purpose is to undertake works within a TRCA Regulated Area of the Mimico Creek Watershed in order to facilitate the construction of an industrial warehouse and parking lot associated with a municipal site plan application. 64 4

5 EX10.5 EX10.6 EX10.7 CITY OF BRAMPTON To construct, reconstruct, erect or place a building or structure on Lot 15, Concession 6 EHS, (H4 Tributary of West Humber River - east of Torbram Road - south of Countryside Drive), in the City of Brampton, Humber River Watershed as located on the property owned by City of Brampton. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a 2.4 metre wide pedestrian walkway within a valley corridor, located between Sled Dog Road and Executive Court, in the City of Brampton. 66 DILSAN HOLDINGS LTD. To construct, reconstruct, erect or place a building or structure and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on 16 Cadetta Road, in the City of Brampton, Humber River Watershed as located on the property owned by Dilsan Holdings Ltd.. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the installation of a 150 mm and 50 mm watermains from an existing Region of Peel watermain to the existing building located at 16 Cadetta Road, in the City of Brampton. 68 REGIONAL MUNICIPALITY OF PEEL To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Mayfield Road west of Bramalea Road, in the City of Brampton, Humber River Watershed as located on the property owned by the City of Brampton and Regional Municipality of Peel. The purpose is to widen Mayfield Road from two to six lanes and remove and replace an open footed culvert over Campbells Cross Creek located on Mayfield Road, approximately 230 m west of Bramalea Road. The Redside Dace fisheries timing window will be applied to the project unless otherwise specified in writing by the Ministry of Natural Resources (MNR) and a Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). 70 CITY OF MARKHAM EX10.8 BAYVIEW GLEN CHURCH INC. To site grade on Lot 1, Concession 2, (300 Steeles Avenue East), in the City of Markham, Don River Watershed as located on the property owned by Bayview Glen Church Inc.. The purpose is to acknowledge the placement of fill within a TRCA Regulated Area of the Don River watershed for the asphalt resurfacing of an existing surface parking lot for Bayview Glen Church at 300 Steeles Avenue East in the City of Markham. The described works were carried out without the benefit of any TRCA or municipal permits. 72 5

6 EX HIGHWAY 7 To construct, reconstruct, erect or place a building or structure on Lot 10, Concession 8, (6127 Highway 7), in the City of Markham, Rouge River Watershed. The purpose is to undertake works within TRCA's Regulated Area of the Rouge River Watershed in order to facilitate the construction of a vestibule with an underground storage room approximately 12' x 10' in size, associated with a municipal building permit. 74 CITY OF MISSISSAUGA EX LANCASTER AVENUE To construct, reconstruct, erect or place a building or structure on Lot 198, Plan 436, (7161 Lancaster Avenue), in the City of Mississauga, Mimico Creek Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Mimico Creek Watershed in order to facilitate the construction of a sq. m (2, sq. ft.) single family dwelling at 7161 Lancaster Avenue associated with a municipal building permit. 75 CITY OF TORONTO [ETOBICOKE YORK COMMUNITY COUNCIL AREA] EX10.11 EX RIVERBANK DRIVE To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lot 8, 9, 10, 11, 12, Concession A Lot 8, 9, 10, 11, 12, Plan 3390/2451, (45 Riverbank Drive), in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed. The purpose is to replace an existing bridge and footings, minor channel realignment, stabilize a portion of the creek bank and reconfigure the 15th fairway and green. 77 MARKLAND WOOD COUNTRY CLUB To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 9, Plan 2432, (245 Markland Drive), in the City of Toronto (Etobicoke York Community Council Area), Etobicoke Creek Watershed as located on the property owned by Markland Wood Country Club. The purpose is to undertake refurbishment works to existing greens, tees, and bunkers and service road. 79 6

7 CITY OF TORONTO [SCARBOROUGH COMMUNITY COUNCIL AREA] EX10.13 EX10.14 CITY OF TORONTO To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere, and alter a watercourse, at 51 Beechgrove Drive, in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed, as located on property owned by the City of Toronto. The purpose is to undertake upgrades to an existing wastewater treatment facility. Works will involve construction of new buildings and services, as well as expansion and upgrades to site facilities. The MNR warm water fisheries timing window will apply. A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO) for this project CHINE DRIVE To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 458, Plan 1566, (97 Chine Drive), in the City of Toronto (Scarborough Community Council Area), Waterfront Watershed. The purpose is to construct a second storey addition, rear basement with one and two storey addition, raised rear deck and new rear patio to the existing dwelling at 97 Chine Drive in the City of Toronto (Scarborough Community Council Area). 83 CITY OF TORONTO [TORONTO AND EAST YORK COMMUNITY COUNCIL AREA] EX10.15 EX GLENWOOD CRESCENT To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 19, 20, Plan 2983, (22 Glenwood Crescent), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to construct a new two-storey single family detached dwelling at 22 Glenwood Crescent in the City of Toronto (Toronto and East York). 85 PHYLLO INVESTMENTS INC. / RUE DE LUX To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 4, Plan 383E, (9 Thornwood Road), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed as located on the property owned by Phyllo Investments Inc. / Rue De Lux. The purpose is to reconstruct a failed portion of the slope and replace the french drain discharge pipes located to the rear of the existing multi-unit residential building at 9 Thornwood Road in the City of Toronto (Toronto and East York Community Council Area). 87 7

8 EX CASTLE FRANK CRESCENT To construct, reconstruct, erect or place a building or structure on Lot 8, Plan 686, (19 Castle Frank Crescent), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to construct a new two-tiered deck to the rear and carry out minor landscaping in the side yard of the existing single family detached dwelling at 19 Castle Frank Crescent in the City of Toronto (Toronto and East York). 89 CITY OF VAUGHAN EX10.18 YORK CONDOMINIUM CORPORATION NO. 204 To construct, reconstruct, erect or place a building or structure on Block A, B, C, Plan M-1466, (88 Rainbow Drive), in the City of Vaughan, Humber River Watershed as located on the property owned by York Condominium Corporation No The purpose is to reconstruct a number of existing wooden decks / balconies within a Regulated Area of the Humber River watershed at 88 Rainbow Drive in the City of Vaughan. 90 TOWN OF CALEDON EX10.19 EX KING STREET To construct, reconstruct, erect or place a building or structure on Lot 13, Plan 43R-35293, (3561 King Street), in the Town of Caledon, Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a 3,250 sq. ft. (301.9 sq. m) single family dwelling with porch and septic system associated with a municipal building permit VICTORIA STREET To construct, reconstruct, erect or place a building or structure on Part Lot 150, Block 1, (231 Victoria Street), in the Town of Caledon, Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of an approximate 1,877 sq. ft. ( sq. m) replacement single family dwelling located at 231 Victoria Street associated with a municipal building permit. 95 TOWN OF RICHMOND HILL EX MAGISTRALE COURT To construct, reconstruct, erect or place a building or structure on Lot 1, Plan 65M2921, (16 Magistrale Court), in the Town of Richmond Hill, Don River Watershed. The purpose is to undertake works within TRCA's Regulated Area of the Don River Watershed in order to facilitate the construction of an inground pool at the rear of an existing dwelling associated with a municipal building permit. 96 8

9 EX10.22 EX10.23 REGIONAL MUNICIPALITY OF YORK To construct - reconstruct - erect or place a building or structure, temporarily or permanently place - dump or remove any material - originating on the site or elsewhere, interfere with a wetland and watercourse on Bathurst Street from Gamble Road to north Richmond Hill Reservoir, from Teston Road to Major Mackenzie Drive and on Teston Road, from the proposed West Richmond Hill Pumping Station to Bathurst Street, in the Town of Richmond Hill, Don River Watershed as located on the property owned by Regional Municipality of York. The purpose is to undertake construction of a watermain along Bathurst Street and Teston Road. The Redside Dace fisheries timing window will apply to this project unless otherwise specified in writing by Ministry of Natural Resources (MNR). A letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO) GAMBLE GLEN CRESCENT To construct, reconstruct, erect or place a building or structure on Lot 55, Concession 1 Block 2, Plan 65M-4280, (43 Gamble Glen Crescent), in the Town of Richmond Hill, Don River Watershed. The purpose is to replace a wooden deck approximately 5.4m x 9m to the rear of an existing dwelling within TRCA's Regulated Area of the Don River Watershed. 100 TOWN OF WHITCHURCH-STOUFFVILLE EX KENNEDY ROAD To construct, reconstruct, erect or place a building or structure and change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 7, Concession 6, (13231 Kennedy Road), in the Town of Whitchurch-Stouffville, Rouge River Watershed. The purpose is to reconstruct an ancillary log building on the west side of the residential property located at Kennedy Road in the Town of Whitchurch-Stouffville. 102 TOWNSHIP OF KING EX TH SIDEROAD To construct, reconstruct, erect or place a building or structure and change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Part Lot 15, Concession 5, ( th Sideroad), in the Township of King, Humber River Watershed. The purpose is to construct an addition to an existing dwelling within a Regulated Area of the Humber River watershed at th Sideroad in the Township of King

10 PERMIT APPLICATIONS EX EX10.33 ARE ERRATA ITEMS CITY OF TORONTO [ETOBICOKE YORK COMMUNITY COUNCIL AREA] EX BONNYVIEW DRIVE To construct, reconstruct, erect or place a building or structure and change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 27, Plan 2234, (55 Bonnyview Drive), in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed. The purpose is to construct a new two-storey single family detached dwelling at 55 Bonnyview Drive in the City of Toronto (Etobicoke York). 106 CITY OF TORONTO [NORTH YORK COMMUNITY COUNCIL AREA] EX10.27 EX10.28 EX10.29 AMIN TAHERZADEH To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 15, Plan 2405, Part Lot 14, Plan, (50 Donwoods Drive), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to construct a two-storey replacement dwelling, raised rear deck, new in-ground swimming pool with new cabanas and associated landscaping at 50 Donwoods Drive in the City of Toronto (North York Community Council Area). 107 CITY OF TORONTO To construct, reconstruct, erect or place a building or structure, site grade, and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere, near Eglinton Avenue East and Bermondsey Road, in the City of Toronto (North York Community Council Area), Don River Watershed, as located on property owned by the City of Toronto. The purpose is to construct a new sidewalk. Works will involve installation of new concrete sidewalk and retaining walls. No in-water works are within the scope of this project. 109 CITY OF TORONTO To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 11, Concession 3 EYS Part Block A, Plan 6098, (125 Moatfield Road), in the City of Toronto (North York Community Council Area), Don River Watershed as located on the property owned by City of Toronto. The purpose is to construct a new freestanding pylon sign at 125 Moatfield Drive in the City of Toronto (North York Community Council Area)

11 CITY OF TORONTO [TORONTO AND EAST YORK COMMUNITY COUNCIL AREA] EX10.30 EX10.31 EX MINTO STREET To construct, reconstruct, erect or place a building or structure and change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Part 2 Lot 20, Plan 633, (18 Minto Street), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to construct a third storey and a new two-storey and basement addition to the rear of the existing two-storey semi-detached dwelling at 18 Minto Street in the City of Toronto (Toronto and East York Community Council Area) THORNWOOD ROAD To construct, reconstruct, erect or place a building or structure and change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 5, Plan 383 E, Part Lot 30, Plan 365 E, (11 Thornwood Road), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to construct a new two-storey single family detached dwelling including an underground parking garage, rear at-grade permeable paver terrace and wood deck at 11 Thornwood Road. The existing dwelling is to be demolished MINTO STREET To construct, reconstruct, erect or place a building or structure and change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Part 1 Lot 20, Plan 633, (20 Minto Street), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to construct a third storey and a new two-storey and basement addition to the rear of the existing two-storey semi-detached dwelling at 20 Minto Street in the City of Toronto (Toronto and East York Community Council Area). 116 CITY OF VAUGHAN EX ALBION VAUGHAN ROAD To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 1, Plan , (12331 Albion Vaughan Road), in the City of Vaughan, Humber River Watershed. The purpose is to conduct grading works and construct a low retaining wall associated with the construction of a new driveway to an existing dwelling within a Regulated Area of the Humber River watershed at Albion-Vaughan Road in the City of Vaughan

12 PERMIT APPLICATIONS EX EX10.47 ARE PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS Permission for Routine Infrastructure Works Letter of Approval are implemented by Planning and Development Division staff and are received monthly by the Executive Committee. The permission of routine infrastructure works is subject to authorization by the Director, Planning and Development and signed by an appointed enforcement officer. All routine infrastructure works are located within a Regulated Area, generally within or adjacent to the hazard or natural feature and in the opinion of staff do not affect the control of flooding, erosion, dynamic beaches, pollution or the conservation of land. CITY OF BRAMPTON EX10.34 BELL CANADA To undertake sewer and watermain or utility installation within an existing road right of way on Bramalea Road, south of Mayfield Road, in the City of Brampton, Humber River Watershed, as located on the property owned by the City of Brampton. The purpose is to install a communication conduit by the method of trenchless tunnelling and open trench on Bramalea Road, south of Mayfield Road, in the City of Brampton. No in-water works will take place as a part of the proposed works. CFN: Application #: 0545/13/BRAM Report Prepared by: Shirin Varzgani, extension 5785 For information contact: Shirin Varzgani, extension 5785 Date: October 8, 2013 CITY OF TORONTO [ETOBICOKE YORK COMMUNITY COUNCIL AREA] EX10.35 TRANS-NORTHERN PIPELINES INC. To undertake sewer and watermain or utility installation or maintenance within an existing right of way, east of Alhart Drive near Attercliff Court; east of Albion Road at Bankfield Drive; and east of Bankfield Drive at Edgebrook Drive, in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed, as located on property owned by Infrastructure Ontario, Hydro One Networks, Anga's Farm and Nursery, and TRCA under management agreement to the City of Toronto. The purpose is to undertake maintenance on existing pipeline infrastructure. Works will involve inspection and repairs to an existing pipeline. The MNR warm water fisheries timing window will apply. A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO) for this project. CFN: Application #: 0719/13/TOR Report Prepared by: Daniel Brent, extension 5774 For information contact: Daniel Brent, extension 5774 Date: October 22,

13 EX10.36 TRANS-NORTHERN PIPELINES INC. To undertake sewer and watermain or utility installation or maintenance within an existing right of way, between Highway 27 and Skyway Avenue, near Mimico Creek, in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed, as located on property owned by Infrastructure Ontario and Hydro One Networks. The purpose is to undertake maintenance on existing pipeline infrastructure. Works will involve inspection and repairs to an existing pipeline. No in-water works are within the scope of this project. CFN: Application #: 0718/13/TOR Report Prepared by: Daniel Brent, extension 5774 For information contact: Daniel Brent, extension 5774 Date: October 8, 2013 CITY OF TORONTO [NORTH YORK COMMUNITY COUNCIL AREA] EX10.37 TRANS-NORTHERN PIPELINES INC. To undertake sewer and watermain or utility installation or maintenance within an existing right of way in the Finch Hydro Corridor south of Tobermory Drive, in the City of Toronto (North York Community Council Area, Humber River Watershed, as located on property owned by Infrastructure Ontario and Hydro One Networks. The purpose is to undertake maintenance on existing pipeline infrastructure. Works will involve inspection and repairs to an existing pipeline. No in-water works are within the scope of this project. CFN: Application #: 0720/13/TOR Report Prepared by: Daniel Brent, extension 5774 For information contact: Daniel Brent, extension 5774 Date: October 17, 2013 CITY OF VAUGHAN EX10.38 CITY OF VAUGHAN To undertake road/pathway resurfacing or reconstruction on Canada Company Avenue, east of Islington Avenue and south of Major Mackenzie Drive, in the City of Vaughan, Humber River Watershed as located on the property owned by City of Vaughan. The purpose is to carry out road works to reinstate road shoulder and safety guide posts in a Regulated Area. CFN: Application #: 0891/13/VAUG Report Prepared by: Suzanne Bevan, extension 5759 For information contact: Suzanne Bevan, extension 5759 Date: October 9,

14 EX10.39 ENBRIDGE GAS DISTRIBUTION INC. To undertake sewer and watermain or utility installation or maintenance within an existing roadway along the north side of Highway 7 near Keele Street, in the City of Vaughan, Don River Watershed as located on property owned by the City of Vaughan under franchise agreement with Enbridge Gas Distribution Inc. The purpose is to install approximately 350 m of a NPS 12 ST HP gas pipeline along the north side of Highway 7 near Keele Street in the City of Vaughan. The warm water fisheries timing window will be applied to this project, unless otherwise specified in writing by the Ministry of Natural Resources (MNR). A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). CFN: Application #: 0860/13/VAUG Report Prepared by: Caroline Mugo, extension 5689 For information contact: Caroline Mugo, extension 5689 Date: October 8, 2013 TOWN OF AJAX EX10.40 ENBRIDGE GAS DISTRIBUTION INC. To undertake sewer and watermain or utility installation or maintenance within an existing roadway on Achilles Road, east of Salem Road, in the Town of Ajax, Carruthers Creek Watershed as located on property owned by the Town of Ajax under franchise agreement with Enbridge Gas Distribution Inc. The purpose is to install a NPS 2 PE IP gas pipeline on Achilles Road, east of Salem Road, in the Town of Ajax. No in-water works are proposed as part of this project. CFN: Application #: 0838/13/AJAX Report Prepared by: Caroline Mugo, extension 5689 For information contact: Caroline Mugo, extension 5689 Date: October 11, 2013 EX10.41 ENBRIDGE PIPELINES INC. To undertake sewer and watermain or utility installation or maintenance at Enbridge locate MP within the Enbridge right of way, adjacent to the Deer Creek Golf Course and the Banquet Facility, north of Taunton Road East and west of Audley Road, in the Town of Ajax, Carruthers Creek Watershed, as located on the property owned by Ontario Hydro. The purpose is to conduct a visual inspection and undertake necessary repairs of the Line 9 pipeline at Enbridge locate MP within the Enbridge right of way, adjacent to Deer Creek Golf Course and the Banquet Facility, north of Taunton Road East and west of Audley Road, in the Town of Ajax. There are no in-water works involved in the project. 14

15 CFN: Application #: 0787/13/AJAX Report Prepared by: Shirin Varzgani, extension 5785 For information contact: Shirin Varzgani, extension 5785 Date: October 4, 2013 EX10.42 TOWN OF AJAX To undertake off-line stormwater management pond maintenance at the Annie Stormwater Management Pond located south of Annie Crescent and west of Elizabeth Street, in the Town of Ajax, Duffins Creek Watershed, as located on property owned by the Toronto and Region Conservation Authority (TRCA). The purpose is to undertake sediment removal, hickenbottom outlet structure repair works and removal of any live or dead vegetation interfering with the operation of the stormwater management pond located south of Annie Crescent and west of Elizabeth Street, in the Town of Ajax. The warmwater fisheries timing window will be applied to this project, unless otherwise specified in writing by the Ministry of Natural Resources (MNR). A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). CFN: Application #: 0142/13/AJAX Report Prepared by: Shirin Varzgani, extension 5785 For information contact: Shirin Varzgani, extension 5785 Date: October 4, 2013 TOWN OF CALEDON EX10.43 REGIONAL MUNICIPALITY OF PEEL To undertake geotechnical investigations along the alignment of the future proposed Victoria Feedermain project, approximately 500 m south of King Street, between approximately Hurontario Street and Heart Lake Road and along Heart Lake Road, south of Old School Road, in the Town of Caledon, Etobicoke Creek and the Humber River Watersheds, as located on the properties owned by Regional Municipality of Peel, Broxton Holdings Ltd., Ontario Inc., Roman Catholic Episcopal Corporation for the Diocese of Toronto, in Canada, Catholic Cemeteries - Archdiocese of Toronto, James Allen Livingston, Leroy Robert Livingston and Anne Petrie Livingston. The purpose is to undertake geotechnical investigations (boreholes) along the alignment of the future proposed Victoria Feedermain project, approximately 500 m south of King Street, between approximately Hurontario Street and Heart Lake Road and along Heart Lake Road, south of Old school Road, in the Town of Caledon. A modified fisheries timing window will be applied to the works. A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). 15

16 CFN: Application #: 0865/13/CAL Report Prepared by: Shirin Varzgani, extension 5785 For information contact: Shirin Varzgani, extension 5785 Date: October 7, 2013 TOWN OF RICHMOND HILL EX10.44 ENBRIDGE GAS DISTRIBUTION INC. To undertake sewer and watermain or utility installation or maintenance within an existing roadway on Heathmount Court, south of Shadow Falls Drive, in the Town of Richmond Hill, Rouge River Watershed as located on property owned by the Town of Richmond Hill under franchise agreement with Enbridge Gas Distribution Inc. The purpose is to install a NPS 2 PE IP gas pipeline on Heathmount Court, in the Town of Richmond Hill. No in-water or near water works are proposed as part of this project. CFN: Application #: 0450/13/RH Report Prepared by: Caroline Mugo, extension 5689 For information contact: Caroline Mugo, extension 5689 Date: October 21, 2013 TOWN OF WHITCHURCH-STOUFFVILLE EX10.45 REGIONAL MUNICIPALITY OF YORK To undertake drainage structure general maintenance at Warden Avenue, in the Town of Whitchurch-Stouffville, Rouge River Watershed as located on the property owned by Regional Municipality of York. The purpose is to replace an existing 24m long, 1500mm diameter corrugated steep pipe (CSP) cross culvert with a culvert of the same dimensions. The culvert conveys a watercourse under Warden Avenue approximately 1700m north of Stouffville Road. The Ministry of Natural Resources (MNR) Redside Dace fisheries timing window will apply to this project unless otherwise specified in writing by MNR. A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO) for this project. CFN: Application #: 0728/13/WS Report Prepared by: Scott Smith, extension 5758 For information contact: Scott Smith, extension 5758 Date: October 16,

17 EX10.46 TOWN OF WHITCHURCH-STOUFFVILLE To undertake drainage structure general maintenance on 3216 Bethesda Sideroad, in the Town of Whitchurch-Stouffville, Rouge River Watershed as located on the property owned by Town of Whitchurch-Stouffville. The purpose is to undertake sediment removal from an existing ditch on the north side of Bethesda Road, east of Warden Avenue, in the Town of Whitchurch-Stouffville. CFN: Application #: 0900/13/WS Report Prepared by: Leah Chishimba, extension 5744 For information contact: Leah Chishimba, extension 5744 Date: October 10, 2013 TOWNSHIP OF KING EX10.47 ENBRIDGE GAS DISTRIBUTION INC. To undertake sewer and watermain or utility installation or maintenance within an existing roadway on Dufferin Street, north of King Road in the Township of King, Humber River Watershed as located on property owned by the Town of King under franchise agreement with Enbridge Gas Distribution Inc. The purpose is to install a NPS 2 ST YJ HP gas pipeline on Dufferin Street, north of King Road in the Township of King. No in-water or near water works are proposed as part of this project. CFN: Application #: 0870/13/KING Report Prepared by: Caroline Mugo, extension 5689 For information contact: Caroline Mugo, extension 5689 Date: October 22, 2013 PERMIT APPLICATIONS EX EX10.74 ARE MINOR WORKS LETTER OF APPROVAL Permission for Minor Works Letter of Approval are implemented by Planning and Development Division staff and are received monthly by the Executive Committee. The permission of minor works is subject to authorization by the Director, Planning and Development and signed by an appointed enforcement officer. All minor works are located within a Regulated Area, outside of the floodplain and in the opinion of staff do not affect the control of flooding, erosion, dynamic beaches, pollution or the conservation of land. CITY OF BRAMPTON EX BAYHAMPTON DRIVE To construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 31, Plan 43M-1711, (16 Bayhampton Drive), in the City of Brampton, Humber River Watershed. 17

18 CFN: Application #: 0691/13/BRAM Report Prepared by: Anant Patel, extension 5618 For information contact: Anant Patel, extension 5618 Date: October 1, 2013 EX SUNFOREST DRIVE To construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 280, Plan 43M-608, (27 Sunforest Drive), in the City of Brampton, Etobicoke Creek Watershed. CFN: Application #: 0872/13/BRAM Report Prepared by: Anant Patel, extension 5618 For information contact: Anant Patel, extension 5618 Date: October 1, 2013 EX DEGREY DRIVE To construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 23, Plan M1863, (30 Degrey Drive), in the City of Brampton, Humber River Watershed. CFN: Application #: 0899/13/BRAM Report Prepared by: Anant Patel, extension 5618 For information contact: Anant Patel, extension 5618 Date: October 21, 2013 EX BAYHAMPTON DRIVE To construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on, (14 Bayhampton Drive), in the City of Brampton, Humber River Watershed. CFN: Application #: 0811/13/BRAM Report Prepared by: Anant Patel, extension 5618 For information contact: Anant Patel, extension 5618 Date: October 21, 2013 CITY OF MARKHAM EX HERITAGE WOODS MANOR To construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on, (21 Heritage Woods Manor), in the City of Markham, Rouge River Watershed. 18

19 CFN: Application #: 0867/13/MARK Report Prepared by: Jeffrey Thompson, extension 5386 For information contact: Doris Cheng, extension 5306 Date: September 27, 2013 CITY OF PICKERING EX WILLIAM STREET To construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 11, Plan 40M-1482, (5068 William Street), in the City of Pickering, Duffins Creek Watershed. CFN: Application #: 0866/13/PICK Report Prepared by: Vanessa Aubrey, extension 5662 For information contact: Chris Jones, extension 5718 Date: October 15, 2013 EX CONCESSION 6 To construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) and construct a ground floor addition up to 50 sq. m (538 sq. ft) on, (2374 Concession 6), in the City of Pickering, Duffins Creek Watershed. CFN: Application #: 0775/13/PICK Report Prepared by: Vanessa Aubrey, extension 5662 For information contact: Chris Jones, extension 5718 Date: September 27, 2013 CITY OF TORONTO [ETOBICOKE YORK COMMUNITY COUNCIL AREA] EX MEADOWCREST ROAD To construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) and change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Part Lot 14, Concession 2 Plan 66R-8481, (7 Meadowcrest Road), in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed. CFN: Application #: 0887/13/TOR Report Prepared by: Vanessa Aubrey, extension 5662 For information contact: Mark Rapus, extension 5259 Date: October 15,

20 CITY OF TORONTO [NORTH YORK COMMUNITY COUNCIL AREA] EX OLD COLONY ROAD To change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Part Lot 1, Plan 4135, (98 Old Colony Road), in the City of Toronto (North York Community Council Area), Don River Watershed. CFN: Application #: 0782/13/TOR Report Prepared by: Tara Jahanarai, extension 5284 For information contact: Mark Rapus, extension 5259 Date: October 10, 2013 EX ALDBRURY GARDENS To construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Part Lot 4, Concession 1 EYS, (18 Aldbury Gardens), in the City of Toronto (North York Community Council Area), Don River Watershed. CFN: Application #: 0744/13/TOR Report Prepared by: Tara Jahanarai, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: September 27, 2013 EX BRAESIDE ROAD To construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) and change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Part Lot 9, 10, 11, Plan 2473, (86 Braeside Road), in the City of Toronto (North York Community Council Area), Don River Watershed. CFN: Application #: 0776/13/TOR Report Prepared by: Tara Jahanarai, extension 5284 For information contact: Mark Rapus, extension 5259 Date: October 17, 2013 EX GWENDOLEN CRESCENT To construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) and change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 121, 122, 123, Plan M-442, (14 Gwendolen Crescent), in the City of Toronto (North York Community Council Area), Don River Watershed. CFN: Application #: 0883/13/TOR Report Prepared by: Tara Jahanarai, extension 5284 For information contact: Mark Rapus, extension 5259 Date: October 15,

21 CITY OF TORONTO [SCARBOROUGH COMMUNITY COUNCIL AREA] EX FISHLEIGH DRIVE To construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) and change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 27, Plan 4072, (33 Fishleigh Drive), in the City of Toronto (Scarborough Community Council Area), Waterfront Watershed. CFN: Application #: 0778/13/TOR Report Prepared by: Tara Jahanarai, extension 5284 For information contact: Mark Rapus, extension 5259 Date: October 18, 2013 EX SATOK TERRACE To construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 46, Plan M-1080, (55 Satok Terrace), in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed. CFN: Application #: 0784/13/TOR Report Prepared by: Tara Jahanarai, extension 5284 For information contact: Mark Rapus, extension 5259 Date: October 1, 2013 EX CEDAR BRAE BOULEVARD To construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 57, Plan 3619, (86 Cedar Brae Boulevard), in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed. CFN: Application #: 0783/13/TOR Report Prepared by: Tara Jahanarai, extension 5284 For information contact: Mark Rapus, extension 5259 Date: October 1,

22 CITY OF TORONTO [TORONTO AND EAST YORK COMMUNITY COUNCIL AREA] EX LUMSDEN AVENUE To undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads), construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) and change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 117, Plan 1351, (382 Lumsden Avenue), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. CFN: Application #: 0764/13/TOR Report Prepared by: Vanessa Aubrey, extension 5662 For information contact: Mark Rapus, extension 5259 Date: October 11, 2013 EX BEAUMONT ROAD To construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) and change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 9, Plan 661, (5 Beaumont Road), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. CFN: Application #: 0843/13/TOR Report Prepared by: Vanessa Aubrey, extension 5662 For information contact: Mark Rapus, extension 5259 Date: October 11, 2013 EX BEAUMONT ROAD To construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 4, Plan 66, (4 Beaumont Road), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. CFN: Application #: 0844/13/TOR Report Prepared by: Vanessa Aubrey, extension 5662 For information contact: Steve Heuchert, extension 5311 Date: October 15,

23 EX FERRIS ROAD To construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft), construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) and change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on, (106 Ferris Road), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. CFN: Application #: 0767/13/TOR Report Prepared by: Vanessa Aubrey, extension 5662 For information contact: Mark Rapus, extension 5259 Date: October 21, 2013 CITY OF VAUGHAN EX CALVIN CHAMBERS ROAD To install a swimming pool and undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Lot 24, Concession 1, (86 Calvin Chambers Road), in the City of Vaughan, Don River Watershed. CFN: Application #: 0881/13/VAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: June Little, extension 5756 Date: October 2, 2013 EX WOLF CREEK CRESCENT To undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) and construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 133, Plan 65M4004, (96 Wolf Creek Crescent), in the City of Vaughan, Don River Watershed. CFN: Application #: 0882/13/VAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: June Little, extension 5756 Date: October 2, 2013 EX WOLF CREEK CRESCENT To construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 133, Plan 65M-4004, (96 Wolf Creek Crescent), in the City of Vaughan, Don River Watershed. 23

24 CFN: Application #: 0917/13/VAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: June Little, extension 5756 Date: October 18, 2013 EX AUTUMN GROVE COURT To undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Lot 18, Plan 65M-3738, (109 Autumn Grove Court), in the City of Vaughan, Humber River Watershed. CFN: Application #: 0905/13/VAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: June Little, extension 5756 Date: October 18, 2013 TOWN OF AJAX EX GALEA DRIVE To construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 68, Plan 60M-2396, (65 Galea Drive), in the Town of Ajax, Carruthers Creek Watershed. CFN: Application #: 0863/13/AJAX Report Prepared by: Vanessa Aubrey, extension 5662 For information contact: Chris Jones, extension 5718 Date: September 27, 2013 TOWN OF CALEDON EX WILLOW STREET To construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on 38 Willow Street, in the Town of Caledon, Humber River Watershed. CFN: Application #: 0738/13/CAL Report Prepared by: Anant Patel, extension 5618 For information contact: Anant Patel, extension 5618 Date: October 1, 2013 EX PATTERSON SIDEROAD To undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on 7599 Patterson Sideroad, in the Town of Caledon, Humber River Watershed. 24

25 CFN: Application #: 0856/13/CAL Report Prepared by: Anant Patel, extension 5618 For information contact: Anant Patel, extension 5618 Date: October 1, 2013 EX DEER VALLEY DRIVE To install a swimming pool on Lot 110, Plan M651, (26 Deer Valley Drive), in the Town of Caledon, Humber River Watershed. CFN: Application #: 0826/13/CAL Report Prepared by: Anant Patel, extension 5618 For information contact: Anant Patel, extension 5618 Date: October 1, 2013 EX11. NEW BUSINESS NEXT MEETING OF THE EXECUTIVE COMMITTEE #10/13, TO BE HELD ON DECEMBER 13, 2013 AT 9:30 A.M. IN WESTON ROOM B, BLACK CREEK PIONEER VILLAGE Brian Denney Chief Administrative Officer /jr 25

26 TO: FROM: Chair and Members of the Executive Committee Meeting #9/13, November 1, 2013 Mike Fenning, Senior Manager, Property Services Item EX7.1 RE: TRIDEL CORPORATION Request for a Permanent Easement for a Sanitary Sewer Upgrade to Service Developments at 1 Old Mill Drive in the City of Toronto, Humber River Watershed CFN KEY ISSUE Receipt of a request from Tridel Corporation to provide a permanent easement for an upgraded sanitary sewer to service developments at 1 Old Mill Drive in the City of Toronto, Humber River watershed. RECOMMENDATION THE EXECUTIVE COMMITTEE RECOMMENDS THAT WHEREAS Toronto and Region Conservation Authority (TRCA) is in receipt of a request from Tridel Corporation (Tridel) for a permanent sanitary sewer easement to service Tridel's developments at 1 Old Mill Drive, City of Toronto, Humber River watershed; AND WHEREAS it is in the opinion of TRCA that it is in the best interests of TRCA in furthering its objectives, as set out in Section 20 of the Conservation Authorities Act, to cooperate with Tridel and the City of Toronto in this instance; THEREFORE LET IT BE RESOLVED THAT a permanent easement containing hectares (0.143 acres), more or less, be granted to the City of Toronto for an upgraded sanitary sewer to facilitate the development of adjacent lands owned by Tridel at 1 Old Mill Drive in the City of Toronto, said land being Part of Lots 1 and 2 Humber Range, Concession 2 from the Bay and designated as Part 1 and 2 on draft plan by I.M. Pastushak Limited OLS, job number # , subject to the following terms and conditions: a) the easement price be $60,000.00, to be paid by Tridel, and in addition Tridel shall pay all legal and survey costs incurred by TRCA to complete this transaction; b) sediment control measures in a manner satisfactory to TRCA be practiced by Tridel during any construction; c) an archaeological investigation be conducted by TRCA staff prior to any site disturbance, with any mitigative measures required being carried out, all at the sole expense of Tridel; d) all permits pursuant to Ontario Regulation 166/06 be obtained by Tridel prior to commencement of any construction; 26

27 e) any TRCA-owned lands disturbed by the proposed works be revegetated/stabilized following construction and, where deemed appropriate by TRCA staff and City of Toronto staff, a landscape plan be prepared for TRCA staff review and approval in accordance with existing TRCA and City of Toronto landscaping guidelines; f) Tridel and the City of Toronto are to fully indemnify and save harmless TRCA from any and all claims for injuries, damages or loss of any nature resulting in any way either directly or indirectly from the granting of this easement or the resulting construction; g) any additional considerations as deemed appropriate by TRCA staff or its solicitors; THAT said easement be subject to an Order in Council being issued in accordance with Section 21(2) of the Conservation Authorities Act, R.S.O. 1990, Chapter C.27 as amended, if required; AND FURTHER THAT authorized TRCA officials be directed to take whatever action may be required to implement the easement agreement, including the obtaining of necessary approvals and the signing and execution of any documents. BACKGROUND Tridel has formally requested a permanent easement for an upgraded sanitary sewer. The current sanitary sewer within the existing easement is not able to hold the capacity required for the proposed condominium development. Therefore Tridel is required to reconstruct the sanitary sewer to service their condominium development at 1 Old Mill Drive in the City of Toronto. The permanent easement will be assumed by the City of Toronto for maintenance after completion of construction. Extensive public consultation has taken place throughout the planning process for this development. No concerns were raised regarding the sanitary sewer during the consultations. The subjects lands are part of a larger parcel acquired from The Corporation of the City of York on October 25, 1984 for conservation purposes. TRCA staff has carried out negotiations with Tridel's representatives and respectfully submit that the compensation relating to the hectares (0.143 acres) easement, is fair and reasonable. The total compensation package is composed of $60, for the purchase of the permanent easement and $20, in native plantings throughout the Humber River watershed to produce an ecological net gain and total compensation of approximately $80, Plantings: All lands disturbed by construction will be stabilized and, where deemed appropriate by TRCA staff, revegetated with native woody and herbaceous plant material in accordance with existing TRCA landscaping guidelines. A landscaping plan was prepared and form part of the permit pursuant to Ontario Regulation 166/06. A plan illustrating the permanent easement location is attached. 27

28 FINANCIAL DETAILS It is proposed that the compensation obtained from this easement be utilized for the purchase of priority properties under the Greenlands Acquisition Project, Report prepared by: Edlyn Wong, extension 5711, Jae Truesdell, extension s: For Information contact: Edlyn Wong, extension 5711, Jae Truesdell, extension s: Date: October 22, 2013 Attachments: 1 28

29 Attachment 1 29

30 TO: FROM: Chair and Members of the Executive Committee Meeting #9/13, November 1, 2013 Mike Fenning, Senior Manager, Property Services Item EX7.2 RE: GREENLANDS ACQUISITION PROJECT FOR Flood Plain and Conservation Component, Humber River Watershed Ravines of Islington Holdings Inc. CFN KEY ISSUE Acquisition of property located south of Langstaff Road and west of Islington Avenue in the City of Vaughan, Regional Municipality of York, under the 'Greenlands Acquisition Project for ', Flood Plain and Conservation Component, Humber River watershed. RECOMMENDATION THE EXECUTIVE COMMITTEE RECOMMENDS THAT hectares ( acres), more or less, of vacant land, being Part 26 on Plan 65R-34474, located south of Langstaff Road and west of Islington Avenue, City of Vaughan, Regional Municipality of York, be purchased from Ravines of Islington Holdings Inc.; THAT the purchase price be $2.00; THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land free from encumbrance, subject to existing service easements; THAT TRCA solicitors, Gardiner Roberts LLP, be instructed to complete the transaction at the earliest possible date. All reasonable expenses incurred incidental to the closing for land transfer tax, legal costs, and disbursements are to be paid; AND FURTHER THAT authorized TRCA officials be directed to take the necessary action to finalize the transaction including obtaining needed approvals and signing and execution of documents. BACKGROUND Resolution #A94/10 at Authority Meeting #5/10, held on June 25, 2010, approved the Greenlands Acquisition Project for As a condition of site plan approval, the valleylands are to be transferred to TRCA for the nominal fee of $2.00. Negotiations have been conducted with Mary Morra of Parente, Borean LLP, acting as agent for the owner. Attached is a plan showing the location of the subject lands. 30

31 RATIONALE The subject property falls within TRCA s approved master plan for acquisition for the Humber River watershed as outlined in the approved Greenlands Acquisition Project for Through the review of the site plan for a proposed residential development of this site, TRCA staff established the limits of the valleylands (i.e. Part 26 on Plan 65R-34474). The subject property is also adjacent to TRCA lands to the west. TAXES AND MAINTENANCE Based on preliminary review of the environmental criteria for lands that are eligible to receive a property tax exemption under the Provincial Conservation Land Tax Incentive Program, it would appear that all of the subject property would be eligible for exemption for the 2014 taxation year. The addition of the subject parcel of land will not significantly impact TRCA's maintenance costs at this location. FINANCIAL DETAILS Funds for the costs related to this purchase are available in the TRCA land acquisition capital account. Report prepared by: Edlyn Wong, extension s: ewong@trca.on.ca For Information contact: Edlyn Wong, extension 5711, Jae Truesdell, extension s: ewong@trca.on.ca, jtruesdell@trca.on.ca Date: October 07, 2013 Attachments:1 31

32 Attachment 1 32

33 TO: FROM: Chair and Members of the Executive Committee Meeting #9/13, November 1, 2013 Mike Fenning, Senior Manager, Property Services Item EX7.3 RE: GREENLANDS ACQUISITION PROJECT FOR Flood Plain and Conservation Component, Humber River Watershed Averton Common (Kleinburg) Inc. CFN KEY ISSUE Purchase of property located to the rear of and Islington Avenue - Kleinburg, City of Vaughan, Regional Municipality of York, under the "Greenlands Acquisition Project for ", Flood Plain and Conservation Component, Humber River watershed. RECOMMENDATION THE EXECUTIVE COMMITTEE RECOMMENDS THAT 0.47 hectares (1.16 acres), more or less, of vacant land being Part of Lot 23, Concession 8 and designated as Parts 3, 4, 5 and 6 on a Draft Plan of Survey prepared by Schaeffer Dzaldov Bennett Ltd., Ontario Land Surveyors, under their Job No C, dated October 16, 2013, City of Vaughan, Regional Municipality of York, located to the rear of & Islington Avenue - Kleinburg, be purchased from Averton Common (Kleinburg) Inc.; THAT the purchase price be $2.00; THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the lands free from encumbrance, subject to existing service easements; THAT Gardiner Roberts LLP, be instructed to complete the transaction at the earliest possible date. All reasonable expenses incurred incidental to the closing for land transfer tax, legal costs, and disbursements are to be paid; AND FURTHER THAT authorized TRCA officials be directed to take the necessary action to finalize the transaction including obtaining needed approvals and signing and execution of documents. BACKGROUND Resolution #A94/10 at Authority Meeting #5/10, held on June 25, 2010, approved the Greenlands Acquisition Project for Negotiations have been conducted with Mr. Vince Baffa, Vice President, Development, of Averton Common (Kleinburg) Inc. Since TRCA does not presently own any adjoining property, a temporary access easement over the south side of the developable portion of the property will be granted to TRCA as part of this transaction in order to periodically inspect and maintain the lands. 33

34 Attached is a plan showing the location of the subject lands. RATIONALE The subject property falls within TRCA's approved master plan for acquisition for the Humber River watershed as outlined in the approved Greenlands Acquisition Project for Through the review of Rezoning Application Z and Site Plan Application DA for low rise, apartment type residential development, TRCA staff has established the limits of the open space lands (i.e. Parts 3 and 4 on Draft Plan of Survey) which are situated partially within the Regional Storm Flood Plain as well as entirely within the regulated area of the Humber River, including a 7.5 metre wide tableland landscape buffer. TAXES AND MAINTENANCE Based on TRCA's preliminary review of the environmental criteria for lands that are eligible to receive a property tax exemption under the provincial Conservation Land Tax Incentive Program, it would appear that all of the subject property would be eligible for exemption for the 2014 taxation year. The addition of the subject parcel of land will not significantly impact TRCA's maintenance costs at this location. FINANCIAL DETAILS Funds for the costs related to this purchase are available in the TRCA land acquisition capital account. Report prepared by: George Leja, extension s: gleja@trca.on.ca For Information contact: George Leja, extension 5342, Jae Truesdell, extension s: gleja@trca.on.ca, jtruesdell@trca.on.ca Date: August 15, 2013 Attachments: 1 34

35 Attachment 1 35

36 TO: FROM: Chair and Members of the Executive Committee Meeting #9/13, November 1, 2013 Mike Fenning, Senior Manager, Property Services Item EX7.4 RE: GREENLANDS ACQUISITION PROJECT FOR Flood Plain and Conservation Component, Humber River Watershed Delmanor Prince Edward Inc. CFN KEY ISSUE Purchase of property located to the rear of Dundas Street West, City of Toronto - Etobicoke York Community Council Area, under the "Greenlands Acquisition Project for ", Flood Plain and Conservation Component, Humber River watershed. RECOMMENDATION THE EXECUTIVE COMMITTEE RECOMMENDS THAT 0.19 hectares (0.47 acres), more or less, of vacant land being Part of Lot 10, Concession C, FTH and designated as Parts 1 and 4 on Plan 66R-27060, City of Toronto - Etobicoke York Community Council Area, located to the rear of Dundas Street West, be purchased from Delmanor Prince Edward Inc.; THAT the purchase price be $2.00; THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the lands free from encumbrance, subject to existing service easements; THAT Gardiner Roberts LLP, be instructed to complete the transaction at the earliest possible date. All reasonable expenses incurred incidental to the closing for land transfer tax, legal costs, and disbursements are to be paid; AND FURTHER THAT authorized TRCA officials be directed to take the necessary action to finalize the transaction including obtaining needed approvals and signing and execution of documents. BACKGROUND Resolution #A94/10 at Authority Meeting #5/10, held on June 25, 2010, approved the Greenlands Acquisition Project for Negotiations have been conducted with Ms. Mary Critelli of DelZotto Zorzi LLP, Barristers & Solicitors, acting as agent on behalf of the owner. The proposed site development consists of an underground parking garage and multi-storey retirement apartment building. The works also include removal and restoration of an existing asphalt parking lot located at the top of the valley. 36

37 The proposed development is subject to City of Toronto and TRCA review and approvals which have now been finalized. The subject property is appropriately zoned for the intended use and currently contains an office building and surface parking lot. The existing surface parking lot is located within the slope hazard limit as well as up to the physical top of bank and the resulting storm flows are actively eroding the slope on the northwest corner of the site. This erosion scar requires remediation and replanting. The zoning approval was conditioned upon securing a comprehensive plan for slope remediation, valley renaturalization and conveyance of the restored valley lands to TRCA. The proposed slope remediation and replanting plans need to be secured prior to moving forward with a permit for the new development. The owner has agreed to retain TRCA Restoration Services staff to design and construct the required works. An agreement is being put in place prior to the issuance of a permit under Ontario Regulation 166/06 in order to guarantee that the slope remediation works will take place. Ultimately, the development will result in renaturalization of the former parking area and the hazard lands will be conveyed to public ownership for a net gain to the natural heritage system. Access to the subject lands will be achieved along the east side of the property in order to complete the slope remediation works as well as to secure future access for maintenance purposes. Attached is a plan showing the location of the subject lands. RATIONALE The subject property falls within TRCA's approved master plan for acquisition for the Humber River watershed as outlined in the Greenlands Acquisition Project for Through our review of Official Plan and Zoning By-Law Amendment Application WET 04 OZ for retirement residential development, TRCA staff established the limits of the open space lands (i.e. Parts 1 and 4 on Plan 66R-27060) which are located partially within the Regional Storm Flood Plain and entirely within the Regulated Area of the Humber River valley corridor at this location. TAXES AND MAINTENANCE It is proposed that the lands be turned over to the City of Toronto for management. FINANCIAL DETAILS Funds for the costs related to this purchase are available in the TRCA land acquisition capital account. Report prepared by: George Leja, extension s: gleja@trca.on.ca For Information contact: George Leja, extension 5342, Jae Truesdell, extension s: gleja@trca.on.ca, jtruesdell@trca.on.ca Date: August 15, 2013 Attachments: 1 37

38 Attachment 1 38

39 TO: FROM: Chair and Members of the Executive Committee Meeting #9/13, November 1, 2013 Mike Fenning, Senior Manager, Property Services Item EX7.5 RE: GREENLANDS ACQUISITION PROJECT FOR Flood Plain and Conservation Component, Don River Watershed Ontario Inc. CFN KEY ISSUE Purchase of property located on the south side of Major Mackenzie Drive, east of Dufferin Street, City of Vaughan, Regional Municipality of York, under the "Greenlands Acquisition Project for ", Flood Plain and Conservation Component, Don River watershed. RECOMMENDATION THE EXECUTIVE COMMITTEE RECOMMENDS THAT 4.13 hectares (10.21 acres), more or less, of vacant land being Part of Lot 20, Concession 2 and designated as Block 57 on a Draft Plan of Subdivision prepared by Schaeffer & Dzaldov Ltd., Ontario Land Surveyors, Drawing No. A1, dated August 14, 2006, City of Vaughan, Regional Municipality of York, located on the south side of Major Mackenzie Drive, east of Dufferin Street, be purchased from Ontario Inc.; THAT the purchase price be $2.00; THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the lands free from encumbrance, subject to existing service easements; THAT Gardiner Roberts LLP, be instructed to complete the transaction at the earliest possible date. All reasonable expenses incurred incidental to the closing for land transfer tax, legal costs, and disbursements are to be paid; AND FURTHER THAT authorized TRCA officials be directed to take the necessary action to finalize the transaction including obtaining needed approvals and signing and execution of documents. BACKGROUND Resolution #A94/10 at Authority Meeting #5/10, held on June 25, 2010, approved the Greenlands Acquisition Project for Negotiations have been conducted with Mr. George Karakokkinos of Nu-Land Management Inc., who acts as agent on behalf of the owner. 39

40 The subject parcel to be conveyed to TRCA contains an on-stream pond with an outlet structure, utilizing stop logs to control water levels. The pond was built by a previous owner of the property sometime prior to From the outset of negotiations, which date back to 2006, staff has maintained that the existence of the on-stream pond is problematic from a liability perspective and that it is imperative that the pond be taken off-line before any acquisition by TRCA. Following much discussion between TRCA and the owner, it was decided that TRCA staff is best positioned to restore the pond due to expertise in natural heritage restoration. Accordingly, the owner has agreed to provide funds in the amount of $85,000.00, as estimated by TRCA Restoration Services staff, for removal of the outlet structure in order to gradually draw down the pond and allow the watercourse to re-establish its natural path. A portion of the funds will be used to purchase native plant material to restore the former pond area. Based on the above-noted agreement, staff is now prepared to proceed with acquisition of the subject lands. Attached is a plan showing the location of the subject lands. RATIONALE The subject lands fall within TRCA's approved master plan for acquisition for the Don River watershed as outlined in the approved Greenlands Acquisition Project for Through the review of residential subdivision 19T-95065, TRCA staff established the limits of the open space lands (i.e. Block 57 on Draft Plan of Subdivision) which are situated entirely within the regulated area and partially within the Regional Storm Flood Plain of a headwater tributary of the East Don River at this location. TAXES AND MAINTENANCE Based on TRCA's preliminary review of the environmental criteria for lands that are eligible to receive a property tax exemption under the provincial Conservation Land Tax Incentive Program, it would appear that all of the subject property will be eligible for an exemption once the restoration work has been completed. Taxes for 2014 are estimated to be $1,900. The addition of the subject parcel of land will not significantly impact TRCA's maintenance costs at this location. FINANCIAL DETAILS Funds for the costs related to this purchase are available in the TRCA land acquisition capital account. Report prepared by: George Leja, extension s: gleja@trca.on.ca For Information contact: George Leja, extension 5342, Jae Truesdell, extension s: gleja@trca.on.ca, jtruesdell@trca.on.ca Date: August 15, 2013 Attachment: 1 40

41 Attachment 1 41

42 TO: FROM: Chair and Members of the Executive Committee Meeting #9/13, November 1, 2013 Brian Denney, Chief Executive Officer Item EX7.6 RE: USE OF RESOURCES DURING AN ELECTION Approval of Toronto and Region Conservation Authority Policy KEY ISSUE Approval of policy and receipt of procedures on Use of Resources During an Election. RECOMMENDATION THE EXECUTIVE COMMITTEE RECOMMENDS THAT the policy on Use of Resources During an Election be approved, as outlined in Attachment 1; THAT the procedures on Use of Resources During an Election be received, as outlined in Attachment 2; THAT the policy be added to the category of "Application to the General Public or Have Significant Implications" as outlined in the Policy Review staff report approved by the Authority on July 26, 2013; AND FURTHER THAT the City of Toronto be so advised by the CEO's Office. BACKGROUND At its meeting held on February 20 and 21, 2013, Toronto City Council approved a motion requesting that City agencies adopt policies similar to the City of Toronto's that clarify the appropriate actions of employees and use of facilities, events, information, infrastructure and other resources during an election. At Authority Meeting #4/12, held on May 25, 2012, Resolution #A85/12 approved the Toronto and Region Conservation Authority (TRCA) policy on Conflict of Interest - Employee Participation in Municipal, Provincial or Federal Elections. TRCA staff conducted a review of the City of Toronto policy, as well as those of the cities of Vaughan and Brampton, and towns of Markham and Richmond Hill in preparing the TRCA policy and procedures for Use of Resources During and Election. RATIONALE The rationale for this request is to provide a consistent approach to the use of public resources during an election, to help support confidence in the election process, and to be in keeping with the Municipal Elections Act,1996 which specifies that a municipality or local board cannot make a contribution to a municipal election candidate. 42

43 The policy strives to recognize the need to balance freedom of expression and assembly of candidates with responsibilities while ensuring there is no unfair advantage, promotion or contributions to any one candidate, party, registrant or supporter of a ballot question. The policy recommended in Attachment 1, in conjunction with the already approved TRCA policy on employee participation in elections, meets these objectives, and is consistent with the City of Toronto policy. Procedures for implementation of the policy have been approved by TRCA's Directors Committee, and are outlined for the information of the board in Attachment 2. Staff recommends that the policy on Use of Resources During an Election be categorized as "Application to the General Public or Have Significant Implications", and as such requires Authority approval. Report prepared by: Kathy Stranks, extension s: kstranks@trca.on.ca For Information contact: Kathy Stranks, extension s: kstranks@trca.on.ca Date: September 16, 2013 Attachments: 2 43

44 Attachment 1 1. PURPOSE The Toronto and Region Conservation Authority (TRCA) policy on 'Use of Resources During an Election' provides a consistent approach and direction to TRCA employees on how TRCA resources can and cannot be used during municipal, school board, provincial and federal election campaigns or campaigns on a question on a ballot. 2. BACKGROUND The Municipal Elections Act,1996 specifies that a municipality or local board cannot make a contribution to a municipal election candidate (Section 70(4)). A contribution includes money, goods and services given to and accepted by or on behalf of a person for his or her election campaign (Section 66 (1)). Since a contribution may take the form of money, goods or services, any use by an Authority Member who is a candidate or by any candidate, of TRCA s resources for an election campaign would be a contribution by TRCA. This policy and accompanying procedures establishes guidelines on the appropriate use of resources during an election period, in order to: protect the interests of Authority Members, candidates, staff and TRCA, and ensure accountable and transparent election practices. TRCA employees may be approached by some candidates to use TRCA resources for the purposes of campaigning. A clear policy is required to guide the action of TRCA employees and help determine which requests can be accommodated and which should be denied. 3. SCOPE This policy and accompanying procedures applies to all Authority Members, candidates in a municipal, school board, provincial and federal election, and TRCA staff during an election period. 4. ROLES AND RESPONSIBILITIES Chief Executive Officer (CEO): Procedures and guidelines pursuant to the 'Use of Resources During an Election' policy shall be developed to ensure audit implementation compliance. All issues with respect to this policy and associated procedures should be directed toward the CEO. Directors: Directors are responsible for the application of this policy to TRCA resources, facilities and employees managed by their Divisions. TRCA Employees: TRCA employees are responsible for understanding and applying this policy and for seeking clarification and advice if required. 44

45 5. POLICY TRCA strives to recognize the need to balance freedom of expression and assembly of candidates with responsibilities while ensuring there is no unfair advantage, promotion or contributions to any one candidate, party, registrant or supporter of a ballot question. TRCA cannot make a contribution (including money, goods and/or services) to any candidate, political party, registrant or a supporter of a question on a ballot during an election. TRCA resources cannot be used to promote one candidate, political party, registrant or a supporter of a question on a ballot during an election over another candidate, political party, registrant or a supporter of a question on a ballot during an election. This policy is intended to enable continued public and media access to candidates or registrants for information and interviews. The policy distinguishes between unplanned media scrums or chance public encounters by candidates and the media, whether in-person or online, and actual planned media events or rallies. The policy recognizes that Authority Members are holders of their position until their successor is appointed, and supports Members in continuing to fulfill their responsibilities as Authority Members. The policy recognizes that Members of Council are holders of their office until the end of their term and supports Members in continuing to fulfill their responsibilities as Members of Council. The CEO's Office shall ensure the policy contained herein and associated procedures are reviewed on a regular basis (not to exceed three years) and remains relevant to the needs of TRCA, in accordance with legislative requirements and good business practices. 6. DEFINITIONS "Authority Member" means any individual appointed to the board of Toronto and Region Conservation Authority by a participating member municipality. "Campaigning" means any activity by or on behalf of a candidate, political party or question on a ballot meant to elicit support during the election period. Campaigning does not include the appearance of elected officials, other candidates or their supporters, or registrants at an event in their personal capacity without the display of any signage or graphic which identifies the individual as a candidate or registrant and without the solicitation of votes. "Campaign Materials" means any materials used to solicit votes for a candidate(s) or question in an election including but not limited to literature, banners, posters, pictures, buttons, clothing or other paraphernalia. Campaign materials include materials in all media, for example, print, displays, electronic radio or television, online including websites or social media. "Candidate" means any person who has filed and not withdrawn a nomination for an elected office at the municipal, school board, provincial or federal level in an election or by-election. 45

46 "TRCA Resources" includes but is not limited to TRCA employees, TRCA events, TRCA facilities, TRCA funds, TRCA information and TRCA infrastructure. These are further defined as follows: "TRCA employees" for the purpose of this policy, Toronto and Region Conservation Authority employees includes: all TRCA employees, including full time, part time and contract employees, as well as paid or unpaid interns and registered volunteers "TRCA events" means events funded or organized by TRCA or any Authority Member, including events that may be jointly organized with community organizations and/or with external sponsors. TRCA events include, but are not limited to: community meetings and consultations, parks, recreation or cultural facility openings or celebrations and other special events. "TRCA facilities" means any facility which is owned or leased by TRCA and which is directly managed and operated by TRCA divisions or programs. TRCA facilities do not include public right-of-ways such as sidewalks, roads and boulevards and laneways. "TRCA funds or monies" means funding support through TRCA s annual operating or capital budgets, including but not limited to funds provided directly to TRCA programs and services, Members expenses and staffing budgets. "TRCA information" means any information in the custody and control of TRCA, including databases that may be the repository of names, contact information, business records, financial information or other identifiers compiled and used by TRCA employees to conduct TRCA business. Examples of TRCA databases include but are not limited to: Contact Manager records, lists of event attendees, partners and TRCA tenants. Constituent information collected by TRCA Members are not under custody or control of TRCA and are not considered TRCA information for the purpose of this policy. "TRCA infrastructure" means any physical or technology systems that support the operation of TRCA programs and services, including but not limited to TRCA s fleet and marine vehicles, computer network, telecommunications and Lotus Notes system, wireless equipment, computer hardware, software and peripherals, internet and intranet. Excludes public right-of-way including sidewalks, roads, laneways and boulevards. "Contribution" as defined in the Municipal Elections Act, 1996, as amended means "money, in-kind support, goods and services given to and accepted by or on behalf of a person for his or her election campaign". "Election" means an election or by-election at the municipal, school board, provincial and federal level of government, or the submission of a question or by-law to the electors. "Election Period" means the official campaign period of an election. For a municipal or school board election, the election period commences on June 30th and ends on voting day. For a provincial or federal election, the election period commences the day the writ for the election is issued and ends on voting day. 46

47 For a by-election, the period commences when the by-election is called and ends on voting day. "Elected Official" means an individual elected to the House of Commons, the Legislative Assembly of Ontario, a municipal council or a school board. "Glad-handing" means attending a TRCA event as a private individual and interacting with other event attendees without displaying signage or disseminating material which identifies the individual as a candidate and without encouraging votes for a candidate, a political party or a position on a question on a ballot. "Media Event" means an event such as a press conference or photo opportunity to which the media is invited and the purpose of which is to promote a candidate, a political party or a position on a question on a ballot. Features of a media event can include but are not limited to, the issuing of a media advisory stating date, time and location of briefing/press conference, use of backdrops, podiums or public address systems, the distribution of media releases and/or media kits and/or the display of signage and/or other materials to promote a candidate or a position on a question on a ballot. "Media Scrum" means an unplanned encounter between a candidate, a registrant, their staff and/or a member or members of the media. "New/Social Media" means online technologies and practices used to share opinions, insights, experiences and perspectives through words, pictures, music, videos and audio. Social media can take many different forms, including but not limited to internet forums, web logs (blogs), social blogs, messaging, wikis, podcasts, pictures, video, music sharing, rating and bookmarking. "Political Party" Political parties for provincial and federal elections are those registered with the Ontario Election Finances Act or in the registry of parties referred to in section 374 of the Canada Elections Act. Political party for municipal, school board or question on a ballot means an organization whose fundamental purposes is to participate in public affairs by endorsing one or more of its members as candidates and supporting their election, or to promote the acceptance of a certain position on a question on a ballot. "Question on a Ballot" means any question or by-law submitted to the electors by Council, a school board, an elected local board, or the Minister of Municipal Affairs and Housing under the Municipal Elections Act, "Registrant" means an individual, corporation or trade union described in paragraphs 1 to 3 of subsection 70(3) who has registered with the clerk regarding a question on a ballot under the Municipal Elections Act, "Supporter" means a supporter of a yes or no response to a question on a ballot but not incurring expenses like a registrant. "Voting Day" means the day on which the final vote is to be taken in an election. 47

48 RELATED POLICES AND PROCEDURES Procedures for Use of Resources During an Election Conflict of Interest - Employee Participation in Municipal, Provincial or Federal Elections 48

49 Attachment 2 1. Activities Allowable during an Election Period 1.1 Members of the Authority may directly book normally permitted space in a Toronto and Region Conservation Authority (TRCA) facility at the approved rate identified in the fee schedule for public facilities and programming, and any other conditions normally imposed under such permit, shall apply, except as outlined under Section 2.5 of the Procedures for Use of Resources During an Election, or any other such clause as may be applicable. 1.2 All-candidate meetings can be held at TRCA facilities provided that all candidates for an office or all registrants are invited to attend such meetings. This clause is subject to all applicable TRCA policies and procedures. 1.3 Candidate, political party, registrant or a supporter of a question on a ballot during an election are permitted to distribute campaign materials on public right of way sidewalks and thoroughfares and at public parks, subject to the existing permitting policies and procedures for these facilities. 1.4 Informal media scrums are permitted in public or common areas at TRCA facilities provided that no apparatus, mechanism or device for the amplification of the human voice or any sounds is used and that the activity is not disruptive to regular TRCA business in the vicinity. If the media scrum is disruptive, employees may ask the participants to find an alternative location. This clause is subject to all applicable TRCA policies and procedures. 1.5 Candidate, political party, registrant or a supporter of a question on a ballot during an election are permitted to attend TRCA events, or events held at TRCA facilities, in either their capacity as an appointee to TRCA, elected representatives or as private citizens to glad-hand with attendees and visitors, but may not solicit votes for themselves, a political party, registrant or a supporter of a question on a ballot. No election signs may be posted and no campaign materials may be disseminated at TRCA events. This clause is subject to all applicable TRCA policies and procedures. 1.6 Permits for generic election-related purposes, such as teaching members of the public how to become a candidate or the knowledge to organize an election campaign, can be issued for TRCA facilities as long as no one particular candidate, political party, registrant or a supporter of a question on a ballot during an election is promoted or endorsed at the event. 1.7 Elected officials are permitted to attend TRCA-organized events or events held on TRCA property and act as ceremonial participants in their capacity as elected officials, including speaking at the event and partaking in ceremonial activities. Once the writ is issued for provincial or federal elections, MPPs and MPs are no longer elected officials and therefore should not be invited to attend TRCA events. 1.8 TRCA online information related to Members will continue to be accessible by the public. 49

50 1.9 TRCA databases already made available for public use may be used by candidate, political party, registrant or a supporter of a question on a ballot during an election TRCA employees may work on a campaign or support a candidate outside of their work hours, as long as they abide by the Human Resources policy titled Conflict of Interest - Employee Participation in Municipal, Provincial or Federal Elections which defines permitted campaign activity. The policy also prohibits certain employees from participating in any campaign activity Information that is requested and/or provided by TRCA employees to one candidate, political party, registrant or a supporter of a question on a ballot during an election shall be made available to all other candidate, political party, registrant or a supporter of a question on a ballot, at their request, either through posting of the information on the internet or through other mechanisms. The provision of information to a candidate, political party, registrant or a supporter of a question on a ballot during an election will be coordinated through the CEO's Office Requests by a candidate, political party, registrant or a supporter of a question on a ballot for personal meetings with TRCA employees, and requests for tours of TRCA facilities may not always be accommodated due to resource and time constraints. If a meeting or a tour is organized for one candidate, political party, registrant or a supporter of a question on a ballot during an election, TRCA staff would need to commit to organizing a similar meeting or tour for all other candidates, political parties, registrants or supporters of a question on a ballot, at their request. 2. Activities Not Allowable during an Election Period 2.1 TRCA resources, including but not necessarily limited to monies, facilities, equipment, supplies, services or other TRCA resources, may not be used at anytime to support, endorse or otherwise provide an unfair advantage to any candidate, political party, registrant or a supporter of a question on a ballot during an election. 2.2 TRCA monies may not be used to acquire any resources for any campaign or election related activities. 2.3 TRCA employees may not campaign or actively work in support of a municipal, school board, provincial or federal candidate, political party, registrant or a supporter of a question on a ballot during an election during working hours, but may during non-working hours as described in the Human Resources policy titled Conflict of Interest - Employee Participation in Municipal, Provincial or Federal Elections. 2.4 TRCA facilities and TRCA infrastructure cannot be used for any election-related purposes by candidate, political party, registrant or a supporter of a question on a ballot, including for the display of any campaign-related signs in windows or on the facilities, as well as for any other form of campaigning on the facilities, including distribution of election-related material, except as described in section 1 of this procedure. 50

51 2.5 No permits, licenses, leases, or any other agreement for the use of TRCA facilities will be issued for the use or promotion of a particular candidate, political party, registrant or a supporter of a question on a ballot during an election. 2.6 Any candidate, political party, registrant or a supporter of a question on a ballot during an election shall not distribute any campaign materials in TRCA facilities or at TRCA events, except on public right-of ways, thoroughfares and in public parks as described in section 1.3 or during all-candidates meetings. 2.7 TRCA communications materials, whether for internal or for public distribution, must not be used to: a. Profile (name or photograph), make reference to and/or identify any individual as a candidate in any election or a registrant in a question on a ballot. b. Advocate for or against a particular candidate, political party, registrant or a supporter of a question on a ballot during an election. Communications materials include but are not limited to: media releases, media advisories, invitations for special events, flyers, posters, banners, brochures and newsletters. 2.8 Websites or domain names that are funded by TRCA must not include any campaign materials, make reference to and/or identify any individual as a candidate, political party, registrant or a supporter of a question on a ballot during an election, or profile any slogan or symbol associated with a candidate, political party, registrant or a supporter of a question on a ballot during an election. 2.9 News/social media sites, blogs and other new media created and managed by TRCA employees must not make reference to and/or identify any individual as a candidate, political party, registrant or a supporter of a question on a ballot during an election Photographic or video materials which have been or may be created by TRCA employees or with TRCA resources must not be used in any campaign materials The TRCA logo must not be used in any campaign materials TRCA databases must not be used by any candidate, political party, registrant or a supporter of a question on a ballot during an election, unless the database has already been released for public use as per section TRCA infrastructure cannot be used for any election purposes TRCA employees will not perform any service, offer any advice or provide any information solely for the use of one Authority Member, candidate, political party, registrant or a supporter of a question on a ballot during an election. 51

52 2.15 All printing, high speed photocopying and distribution of materials, including stationery and business cards, will be discontinued for an Authority Member, candidate, political party, registrant or a supporter of a question on a ballot during an election, unless authorized by the Authority, except Agendas and Minutes of Authority, committee and advisory board meetings are exempt from this provision. If a compelling corporate need arises during the election period, an Authority Member who is a candidate may use corporate resources to advise or contact TRCA constituents, in keeping with the procedures contained herein, with the consent of the TRCA Chief Executive Officer Notices may not be distributed to any Authority Member, candidate, political party, registrant or a supporter of a question on a ballot during an election, for opening of parks, open spaces and facilities On any material printed or distributed by TRCA, any Authority Member, candidate, political party, registrant or a supporter of a question on a ballot during an election are not permitted to: illustrate that a person is a candidate registered in an election; identify where a person will be running for office; or profile or refer to candidates during an election Use of cell phones and PDA's that are funded by TRCA for any election-related campaign purpose is not permitted, unless TRCA is reimbursed Use of TRCA's voice mail system to record election related messages, and the computer network and related IT systems (including TRCA's system) to distribute election related, correspondence is not permitted. 3. Restrictions related to Services Provided to Authority Members during an Election Year As Authority Members may also be candidates in an election, after August 1 in the municipal or school board election year, or on the day the writ for election is issued for provincial or federal elections, TRCA employees will discontinue the following activities for Authority Members. The same rule applies to all Authority Members, irrespective of whether they are seeking election in the new term or not: 3.1 Advertising and other communications materials paid for by TRCA funds and distributed by TRCA will not reference the name of an Authority Member. 3.2 Event signage, including banners and posters, will not reference the name of an Authority Member. 3.3 Media releases issued by TRCA employees will not reference the name of an Authority Member. 4. Audit Compliance 4.1 The CEO's Office is responsible for communication of this protocol to Authority Members. 52

53 4.2 The CEO, Directors, Senior Managers, Managers and Supervisors are responsible for communication of this protocol to their staff and to investigate reported contraventions to ensure that there is compliance. All reported contraventions are to be reported to the CEO or designate. 4.2 TRCA staff shall consult with the CEO's Office prior to confirming a booking with a political client, to ensure the event booking is in compliance with the policy on Use of Resources During an Election. 4.3 Authority Members and staff are accountable to comply with this protocol. 5. Limitation 5.1 Nothing in this policy shall preclude an Authority Member from performing their job as an Authority Member, nor inhibit them from representing the interests of the governing body who appointed them. RELATED POLICES AND PROCEDURES Policy for Use of Resources During an Election Conflict of Interest - Employee Participation in Municipal, Provincial or Federal Elections 53

54 TO: FROM: Chair and Members of the Executive Committee Meeting #9/13, November 1, 2013 Derek Edwards, Director, Parks and Culture Item EX7.7 RE: 2014 FEE SCHEDULE FOR PUBLIC FACILITIES AND PROGRAMMING KEY ISSUE Toronto and Region Conservation Authority 2014 Fee Schedule for Public Facilities and Programming. RECOMMENDATION THAT the 2014 Fee Schedule for Public Facilities and Programming be amended as set out in Attachment 1, and become effective January 1, BACKGROUND Each year staff conducts a review of the Toronto and Region Conservation Authority (TRCA) Fee Schedule for Public Facilities and Programming to determine any changes. The review of fees takes into account whether they are reflective of the value provided and in keeping with market conditions. The conclusion is that the fee schedule is reflective of market conditions and that no major changes are warranted for 2014, except for those noted in Attachment 1. Staff propose to increase fees for two programs as outlined below in order to facilitate sustainable program offerings. RATIONALE The following notes the proposed fee increases and restructuring which are outlined in Attachment 1. Copies of the full 2014 Fee Schedule for Public Facilities and Programming are available upon request. Increase program rates for each student participating in a general tour or program at the Kortright Centre for Conservation to support program delivery costs. Increase program rates for each student participating in a specially designed tour program at the Kortright Centre for Conservation to support program delivery costs. Increase membership fees to Glen Haffy Headwaters Fly Fisher s Club to support program delivery costs. Report prepared by: Amanda Perricone, extension s: aperricone@trca.on.ca For Information contact: Derek Edwards, extension s: dedwards@trca.on.ca Date: October 03, 2013 Attachments: 1 54

55 Attachment 1 Changes to the 2014 Fee Schedule for Public Facilities and Programming Student program fees take effect in September to coincide with the school year. Student programs are designed for children aged 14 years and under. 3.0 For a permit for the use of a fishing pond at the Glen Haffy Headwaters Trout Ponds, including general admission and the use of row boats; 3.3 for a membership to Headwaters Fly Fisher s Club For general admission at the Kortright Centre for Conservation; 21.5 for each student participating in a general tour program, subject to a minimum group size of twenty persons for each student participating in a specially designed tour program, subject to a minimum group size of twenty persons Base (Plus Taxes) 2013 Gross (Including Taxes) 2014 Base (Plus Taxes) 2014 Gross (Including Taxes) Base (Plus Taxes) 2013 Gross (Including Taxes) 2014 Base (Plus Taxes) 2014 Gross (Including Taxes) For a full list of fees, visit 55

56 TO: FROM: Chair and Members of the Executive Committee Meeting #9/13, November 1, 2013 Carolyn Woodland, Director, Planning and Development Item EX10.1 RE: APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06 Development, Interference with Wetlands and Alterations to Shorelines and Watercourses KEY ISSUE Pursuant to Ontario Regulation 166/06, written permission from the Authority is required for: a) straightening, changing, diverting or interfering in any way with the existing channel of a river, creek, stream or watercourse, or for changing or interfering in any way with a wetland; b) development, if in the opinion of the authority, the control of flooding, erosion, dynamic beaches or pollution or the conservation of land may be affected by the development. A permit may be refused through a Hearing Process, if in the opinion of the Authority, the control of flooding, erosion, dynamic beaches, pollution or the conservation of land is affected. RECOMMENDATION THAT permits be granted in accordance with Ontario Regulation 166/06 for the applications which are listed below: PERMIT APPLICATION EX EX10.3 ARE MAJOR APPLICATIONS Applications that involved a more complex suite of technical studies to demonstrate consistency with policies; applications that cover a significant geographic area (e.g. subdivisions, stormwater management ponds), extensive modifications to the landscape, major infrastructure projects, emergency works, resolution of violations/after the fact permits, trail construction 56

57 CITY OF BRAMPTON EX10.1 CITY OF BRAMPTON To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material originating on the site or elsewhere and alter a watercourse on Countryside Drive between Bramalea Road and Torbram Road in the City of Brampton, Humber River Watershed, as located on property owned by the City of Brampton or through easement agreements. The purpose is to widen Countryside Drive from Bramalea Road to Airport Road. This project has been divided into 2 separate permits (CFN and 49863). This application (CFN 40845) covers the widening of Countryside Drive from Bramalea Road to Torbram Road including the replacement of an undersized culvert with a bridge at the H3 tributary crossing, construction of a sidewalk on the south side and a multi-use path on the north side of the road. The redside dace timing window will apply to any in or near water work at the H3 tributary (approximately Station ) and the warmwater fisheries timing window will apply to the watercourse that outlets just east of Torbram Road, unless otherwise specified in writing by the Ministry of Natural Resources (MNR). A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). The permit will be issued for the period of November 1, 2013 to October 31, 2015 in accordance with the following documents and plans which form part of this permit: Letter of Undertaking to provide revisions to the engineering and landscape drawings to the satisfaction of TRCA staff; dated October 15, 2013; received October 15, 2013; prepared by the City of Brampton. RATIONALE The application was reviewed by staff on the basis of the following information: 57

58 Proposal: This proposal is one of two separate permit applications for the construction of Countryside Drive from Bramalea Road to Airport Road. Work for this section of the road involves widening Countryside Drive from Bramalea Road to Torbram Road from a 2-lane rural to a 4-lane urban cross-section with 6-lanes at major intersections. A 1.5 m wide sidewalk will be constructed on the south side of the road and a 3.0 m multi-use path will be constructed on the north side of the road. The existing 3.9 m span culvert at the H3 tributary (approximately Station ) was found to be undersized. As a result, the City of Brampton together with MNR through their requirements as it relates to redside dace determined that the culvert will need to be replaced with a single 36 m span bridge and the watercourse realigned. In addition, a new 2.4 m by 1.5 m box culvert will be constructed in place of an existing 600 mm diameter CSP to accommodate the road widening near Torbram Road. This culvert will connect to an existing 2.4 m by 1.5 m concrete culvert that outlets to a watercourse south of Countryside Drive on the east side of Torbram Road. Control of Flooding: Works within this area are not anticipated to affect the conveyance or storage of flood waters. Pollution: Standard erosion and sediment control measures (silt fence, cofferdam, rock check dam) will be implemented prior to construction and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent construction generated sediments from entering any watercourse or wetland. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction. Dynamic Beaches: Not applicable Erosion: No geotechnical/slope stability issues are anticipated for the proposal. Conservation of Land: With erosion and sedimentation plans in effect, the potential for a Harmful, Alteration, Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). This application is subject to the Ministry of Natural Resources (MNR) redside dace fisheries timing window (July 1 to September 15) for any in or near water work at the H3 tributary (approximately Station ) and the warmwater fisheries timing window (July 1 to March 31) will apply for work at the tributary near Torbram Road, unless otherwise specified in writing by MNR. Plantings All disturbed areas will be restored and a net ecological gain will be achieved. The City of Brampton will be planting approximately 287 boulevard trees between Bramalea Road and Airport Road, 45 park trees in Sesquicentennial Park, 5700 buffer plantings and 1269 restoration plantings along the H3 tributary. Policy Guidelines: This proposal complies with Section Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. 58

59 CFN: Application #: 347/08/BRAM Report Prepared by: Sharon Lingertat, extension 5717 For information contact: Sharon Lingertat, extension 5717 Date: October 17, 2013 EX10.2 CITY OF BRAMPTON To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Countryside Drive between Torbram Road and Airport Road, in the City of Brampton, Humber River Watershed as located on property owned by the City of Brampton or through easement agreements. The purpose is to widen Countryside Drive from Bramalea Road to Airport Road. This project has been divided into 2 separate permits (CFN and 49863). This application (CFN 49863) covers the widening of Countryside Drive from Torbram Road to Airport Road including realigning the road to eliminate the jog which currently exists approximately midway between Torbram Road and Airport Road. A sidewalk will be constructed on the south side and a multi-use path on the north side of the road. The warmwater fisheries timing window will apply to the watercourse located at approximately Station , unless otherwise specified in writing by the Ministry of Natural Resources (MNR). A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). The permit will be issued for the period of November 1, 2013 to October 31, 2015 in accordance with the following documents and plans which form part of this permit: Letter of Undertaking to provide revisions to the engineering and landscape drawings to the satisfaction of TRCA staff; dated October 15, 2013; received October 15, 2013; prepared by the City of Brampton. RATIONALE The application was reviewed by staff on the basis of the following information: 59

60 Proposal: This proposal is one of two separate permit applications for the construction of Countryside Drive from Bramalea Road to Airport Road. Work for this section of the road involves widening Countryside Drive from Torbram Road to Airport Road from a 2-lane rural to a 4-lane urban cross-section with 6-lanes at major intersections. A 1.5 m wide sidewalk will be constructed on the south side of the road and a 3.0 m multi-use path will be constructed on the north side of the road. Countryside Drive will be realigned to eliminate the jog located approximately midway between Torbram Road and Airport Road. As a result, the existing culvert that conveys a small tributary will be removed and restored. A new 1.2 m wide concrete culvert will be constructed within the new realigned road segment to allow for conveyance of the tributary. Control of Flooding: Works within this area are not anticipated to affect the conveyance or storage of flood waters. Pollution: Standard erosion and sediment control measures (silt fence, rock check dam) will be implemented prior to construction and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent construction generated sediments from entering any watercourse or wetland. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction. Dynamic Beaches: Not applicable Erosion: No geotechnical/slope stability issues are anticipated for the proposal. Conservation of Land: With erosion and sedimentation plans in effect, the potential for a Harmful, Alteration, Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). This application is subject to the Ministry of Natural Resources (MNR) warmwater fisheries timing window (July 1 to March 31), unless otherwise specified in writing by MNR. Plantings All disturbed areas will be restored and a net ecological gain will be achieved. The City of Brampton will be planting approximately 287 boulevard trees between Bramalea Road and Airport Road and the section of road that will be removed near the tributary will be restored. Policy Guidelines: This proposal complies with Section Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: Application #: 0901/13/BRAM Report Prepared by: Sharon Lingertat, extension 5717 For information contact: Sharon Lingertat, extension 5717 Date: October 17,

61 CITY OF MARKHAM EX10.3 CITY OF MARKHAM To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and interfere with a wetland on Lot 9, Concession 5, (8307 Warden Avenue), in the City of Markham, Rouge River Watershed as located on the property owned by City of Markham. The purpose is to undertake works within a Regulated Area of the Rouge River Watershed to facilitate the construction of a wetland as part of a compensation package associated with the construction of various infrastructure works associated with an approved plan of subdivision. The permit will be issued for the period of November 1, 2013 to October 31, 2015 in accordance with the following documents and plans which form part of this permit: Drawing No. SP-1, Markham Uptown Compensation Wetland - Site Preparation, Construction Staging and Erosion Control Plan, prepared by Schollen & Company Inc., dated Jan. 2013, revised June 24, 2013, stamped received by TRCA Planning & Development September 27, 2013; Drawing No. LG-1, Markham Uptown Compensation Wetland - Layout and Grading Plan, prepared by Schollen & Company Inc., dated Jan. 2013, revised June 24, 2013, stamped received by TRCA Planning & Development September 27, 2013; Drawing No. LP-1, Markham Uptown Compensation Wetland - Planting Plan, prepared by Schollen & Company Inc., dated Jan. 2013, revised June 24, 2013, stamped received by TRCA Planning & Development September 27, 2013; Drawing No. S-1, Markham Uptown Compensation Wetland - Seeding and Site Restoration Plan, prepared by Schollen & Company Inc., dated Jan. 2013, revised June 24, 2013, stamped received by TRCA Planning & Development September 27, 2013; 61

62 Drawing No. LD-1, Markham Uptown Compensation Wetland - Planting Details, prepared by Schollen & Company Inc., dated Jan. 2013, revised June 24, 2013, stamped received by TRCA Planning & Development September 27, 2013; Drawing No. SP-1, Markham Uptown Compensation Wetland - Details, prepared by Schollen & Company Inc., dated Jan. 2013, revised June 24, 2013, stamped received by TRCA Planning & Development September 27, RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: This project was previously approved by the Executive Committee on July 5, 2013, however during this time, the land was transferred to the ownership of the City of Markham, making the originally approved permit (C ) under the ownership of Ontario Inc. no longer valid. As such, the consultants have provided a new permit application in the name of the City of Markham, the current landowner. No changes have occurred since the original approval in July The lands subject to this permit are located within the floodplain of the Rouge River Watershed, located north of the Rouge River, south of Highway 7 East, and east of Warden Avenue. The works are compensatory in nature, in order to provide mitigation for the anticipated impacts to the species within the Rouge River as a result of the construction of infrastructure works outleting to the Rouge River in support of Draft Plan of Subdivision 19TM This plan of subdivision was the subject of a Master Environmental Servicing Plan (MESP), which was completed and approved by TRCA staff on June 30, As part of the high density development, a number of infrastructure works have been constructed in phases, including the construction of underground stormwater detention chamber and outfall which services Phase 1 of subdivision the plan of subdivision (C ) and a the removal of a headwater drainage feature and the reconstruction construction of an outfall to serve Phase 2 of the development (C ). The permits associated with the works have been approved by the Executive Committee in 2011 and 2012 respectively. As this branch of the Rouge River has been identified as a regulated habitat for Redside Dace, the landowner was required to provide MNR with compensation works as per the Endangered Species Act 2007 to mitigate the impacts of the infrastructure works required to service the plan of subdivision, which outlet into the Rouge River. The proposed works are a component of the mitigation plan submitted to MNR for review and approval, which included the construction of the wetland feature, which is to provide an overall net benefit to the species. A letter of approval was received with the permit application from MNR (dated February 21, 2013) with respect to the Mitigation Plan. As the location of the wetland to be constructed is located within a Regulated Area of the TRCA, a permit pursuant to Ontario Regulation 166/06 (as amended) is required for the works. 62

63 The proposed works include the construction of a riverine wetland on City of Markham lands (with authorization from the City), as a compensatory piece in support of the infrastructure works associated with the draft approved plan of subdivision. The wetland is intended to become part of a much larger Natural Heritage System, known as the "Greenlands System" through Markham Centre. The existing location of the proposed works is currently comprised of a low, flat meadow/thicket area. The works include the impoundment of a low area along the Rouge River, which is designed to attenuate runoff during storm events, and attenuate shallow groundwater to enhance base flow and provide additional water quality improvements. The works include the creation of a small rock check dam structure within the floodplain, which will regulate the flows inleting and outleting from the feature, including a series of localized excavated areas, creating opportunities for a number of small habitats. The proposed works also include the installation of a number of native plant materials and native seed mixes. The completed works will include a newly created wetland to be integrated within the overall Natural Heritage System, and a complementary terrestrial habitat as part of the overall compensation strategy. Control of Flooding: The proposed works are located within the Regional Storm Floodplain. Intended to function as a riverine wetland, overflow from the river during storm events, will provide water to the man-made feature. Based on the design and TRCA review, there are no significant modifications to the conveyance of stream flows, and a minor increase in flood storage capacity is anticipated. Pollution: Appropriate sediment and erosion controls will be installed and maintained on the subject property during all phases of construction. Dynamic Beaches: Not applicable Erosion: There are no anticipated geotechnical impacts with respect to slope stability or erosion concerns related to this application. Conservation of Land: The Rouge River is considered a Recovery Reach for Redside Dace under MNR's Endangered Species Act, and as such, all in-water works shall adhere to the appropriate fisheries timing window (July 1 to September 15). A Letter of Advice will be required to be issued to facilitate the near and in-water works. Plantings All plantings for the restoration works will be native, non-invasive species. Policy Guidelines: This proposal is consistent with Section New Urban Development - of the Authority's Valley and Stream Corridor Management Program (VSCMP). 63

64 CFN: Application #: 0864/13/MARK Report Prepared by: Doris Cheng, extension 5306 For information contact: Doris Cheng, extension 5306 Date: October 16, 2013 PERMIT APPLICATIONS EX10.4 IS A MAJOR ERRATA ITEM Applications that involved a more complex suite of technical studies to demonstrate consistency with policies; applications that cover a significant geographic area (e.g. subdivisions, stormwater management ponds), extensive modifications to the landscape, major infrastructure projects, emergency works, resolution of violations/after the fact permits, trail construction CITY OF BRAMPTON EX AIRPORT ROAD DEVELOPMENTS INC. To construct, reconstruct, erect or place a building or structure and site grade at 7900 Airport Road, in the City of Brampton, Mimico Creek Watershed as located on the property owned by 7900 Airport Road Developments Incorporated. The purpose is to undertake works within a TRCA Regulated Area of the Mimico Creek Watershed in order to facilitate the construction of an industrial warehouse and parking lot associated with a municipal site plan application. The permit will be issued for the period of November 1, 2013 to October 31, The documents and plans which form part of this permit will be listed in a separate report RATIONALE The application was reviewed by staff on the basis of the following information: 64

65 Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Mimico Creek Watershed in order to facilitate the construction of a 69, square metre (744,922 sq. ft.) industrial warehouse and parking lot associated with a municipal site plan application (City File No. SP12-054) at 7900 Airport Road, in the City of Brampton. The western portion of the ha (34.62 acre) site is located immediately adjacent to a valley corridor of the Mimico Creek Watershed and was created by the approval of an industrial draft plan of subdivision application (City File No. 21T B). The subject property was previously a driver training centre operated by the Ministry of Transportation (MTO). The site was vacant for several years. Recently, the buildings and parking/driveway areas have been demolished and removed. Also, earthworks, the construction of a stormwater management pond, and the installation of infrastructure servicing associated with the approved industrial subdivision have been completed, which was approved by the TRCA Executive Committee (TRCA Permit No. C ) at the December 2, 2011 TRCA Executive Committee Meeting. The subject property is located outside of the Regional Floodplain. The stormwater management pond associated with the approved subdivision provides controls to achieve quantity, quality and erosion control requirements for the site and entire subdivision. Grass swales underlain with clear stone are proposed to achieve TRCA's water balance requirements. As part of the TRCA permit for the subdivision works, an enhancement and restoration plan was submitted, reviewed and approved for the adjacent valley corridor and buffer area. Control of Flooding: The subject property and the proposed development are located entirely outside of the Regional Floodplain. As such, no impacts to the storage and/or conveyance of flood waters are anticipated. Pollution: Appropriate erosion and sediment controls will be installed and maintained throughout all phases of construction. Temporary sediment basins/ponds are proposed as part of the erosion and sediment control plan, which conforms to TRCA's Erosion and Sediment Control Guideline for Urban Construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and/or slope stability concerns associated with this proposal. Conservation of Land: As a component of the subdivision works, the enhancement planting plan is premised on augmenting the existing valley vegetation, particularly in areas where natural vegetation is less dense. In addition, restoration efforts will also be directed in the valley in the western portion of the site to provide further riparian vegetation along the Mimico Creek. There are no fisheries related concerns associated with this application. 65

66 Plantings All proposed plantings approved through the subdivision works are native and non-invasive consistent with TRCA's guidelines. Policy Guidelines: This proposal is consistent with Section New Urban Development - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: Application #: 0910/13/BRAM Report Prepared by: Adam Miller, extension 5244 For information contact: Adam Miller, extension 5244 Date: October 18, 2013 EX10.5 CITY OF BRAMPTON To construct, reconstruct, erect or place a building or structure on Lot 15, Concession 6 EHS, (H4 Tributary of West Humber River - east of Torbram Road - south of Countryside Drive), in the City of Brampton, Humber River Watershed as located on the property owned by City of Brampton. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a 2.4 metre wide pedestrian walkway within a valley corridor, located between Sled Dog Road and Executive Court, in the City of Brampton. The permit will be issued for the period of November 1, 2013 to October 31, 2015 in accordance with the following documents and plans which form part of this permit: Letter of Undertaking, prepared by City of Brampton, dated October 17, 2013, to address outstanding ecology related issues. 66

67 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this proposal is to undertake works within a TRCA Regulated Area of the Humber River Watershed to facilitate the construction of a 2.4 metre wide pedestrian walkway within a valley corridor, located between Sled Dog Road and Executive Court, in the City of Brampton. The proposed pedestrian walkway is located within the Springdale Neighbourhood # Stage 4 (Draft Plan of Subdivision 21T-02006B). This project is being managed and implemented by City of Brampton staff. The proposed walkway will be constructed at-grade utilizing a permeable surface (i.e. turfstone to be filled with topsoil and seed mixture) that will allow for the passage and infiltration of surface flow. Additionally, there will be minimal disturbance to the vegetation as a result of the construction of the proposed walkway. A planting plan has been provided as part of this submission in order to improve the ecological condition of the natural area in this valley corridor. TRCA staff recognizes that the intent of this walkway is to provide for a more solid and safe trail surface in an area where residents have established their own informal walkway. TRCA staff has recommended to City of Brampton staff that they should consider a more permanent and long-term solution as a part of the City's overall trail master planning process. Recognizing that the trail is located within a valley feature, the City of Brampton has committed to installing signage at the top of the walkway to inform and warn users of their safety during high water levels and flooding. Furthermore, the City has committed to implementing a protocol during heavy storm warnings that would require placing barriers at the top of the valley to prevent pedestrians from using the walkway. Control of Flooding: A portion of the proposed walkway is located within the Regional Storm Floodplain. However, the existing grades are to be maintained. As such, TRCA staff do not anticipate any adverse impacts to the storage and/or conveyance of flood waters. Pollution: Appropriate erosion and sediment control (i.e. silt fence) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable Erosion: There are no geotechnical and/or slope stability concerns anticipated with this application. Conservation of Land: No significant vegetation will be removed as a result of construction. However, a planting plan has been provided with this application to enhance the landscaping within the riparian zone adjacent to the walkway. The landscape plan includes planting a diversity of native and non-invasive species. There are no fisheries related concerns associated with this application. 67

68 Plantings All proposed plantings along the valley corridor are native and non-invasive species and are consistent with TRCA's Planting Guideline. Policy Guidelines: This proposal is in conformity with Section New Resource-Based Uses - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: Application #: 0922/13/BRAM Report Prepared by: Anant Patel, extension 5618 For information contact: Leilani Lee-Yates, extension 5370 Date: October 21, 2013 EX10.6 DILSAN HOLDINGS LTD. To construct, reconstruct, erect or place a building or structure and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on 16 Cadetta Road, in the City of Brampton, Humber River Watershed as located on the property owned by Dilsan Holdings Ltd.. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the installation of a 150 mm and 50 mm watermains from an existing Region of Peel watermain to the existing building located at 16 Cadetta Road, in the City of Brampton. The permit will be issued for the period of November 1, 2013 to October 31, 2015 in accordance with the following documents and plans which form part of this permit: Site Servicing, Erosion and Grading Plan, prepared by EMC Group Limited, dated October 10, 2013, stamped received by TRCA Planning & Development on October 11, 2013; 68

69 Geotechnical Investigation Report Proposed New Watermain Installation and Creek Crossing 16 Cadetta Road, Brampton, Ontario; prepared by Coffey Geotechnics Inc., dated June 7, 2013, stamped received by TRCA Planning & Development on June 11, RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated area of the Humber River Watershed in order to facilitate the installation of a 150 mm and a 50 mm watermains from an existing Region of Peel watermain to the existing building located at 16 Cadetta Road, in the City of Brampton. The watermains will extend from the existing building to the Region of Peel watermain by 52.5 metres in length. The proposed watermains will be installed utilizing a Horizontal Directional Drill, and is to be installed approximately 3.8 metres below the invert of the watercourse feature. The pit entry and exit locations are sufficiently setback from the edge of the watercourse feature and will be appropriately isolated during installation, and restored after installation is complete. Additionally, TRCA technical staff have reviewed the proposal and are satisfied with the materials provided. Control of Flooding: No permanent above-ground infrastructure is proposed with this project. The temporary above-ground works that are proposed with this project will be of short duration - associated with the watermain installation process. As such, no impacts to the storage and/or conveyance of the flood waters are anticipated as a result of this project. Pollution: Appropriate erosion and sediment controls (i.e silt fence) have been proposed with this application and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable Erosion: There are no geotechnical and/or slope stability concerns anticipated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. The watermains will be installed approximately 3.8 metres below the invert of the watercourse feature, which is consistent with the Fisheries and Oceans Canada (DFO) Operational Statement. As such, there no fisheries related concerns associated with this application. Plantings As no significant vegetation will be removed as a result of this proposal, no plantings are required. Policy Guidelines: This proposal is consistent with Section Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program (VSCMP). 69

70 CFN: Application #: 0329/10/BRAM Report Prepared by: Anant Patel, extension 5618 For information contact: Leilani Lee-Yates, extension 5370 Date: October 18, 2013 EX10.7 REGIONAL MUNICIPALITY OF PEEL To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Mayfield Road west of Bramalea Road, in the City of Brampton, Humber River Watershed as located on the property owned by the City of Brampton and Regional Municipality of Peel. The purpose is to widen Mayfield Road from two to six lanes and remove and replace an open footed culvert over Campbells Cross Creek located on Mayfield Road, approximately 230 m west of Bramalea Road. The Redside Dace fisheries timing window will be applied to the project unless otherwise specified in writing by the Ministry of Natural Resources (MNR) and a Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). The permit will be issued for the period of November 1, 2013 to October 31, 2015 in accordance with the following documents and plans which form part of this permit: Sheet 1; Mayfield Road Bridge at West of Bramalea Road (H3) - General Arrangement; dated February, ; received April 9, 2013; prepared by IBI Group; Sheet 2; Mayfield Road Bridge at West of Bramalea Road (H3) - Environmental Protection; dated February, ; received April 9, 2013; prepared by IBI Group; Sheet 3; Mayfield Road Bridge at West of Bramalea Road (H3) Mitigation Measures A; dated February 5, 2013; received April 9, 2013; prepared by IBI Group; Sheet 4; Mayfield Road Bridge at West of Bramalea Road (H3) Mitigation Measures B; dated July 2011; received December 15, 2011; prepared by IBI Group; Sheet 5; Mayfield Road Bridge at West of Bramalea Road (H3) TRCA Regulation Limits; dated February 5, 2013; received April 9, 2013; prepared by IBI Group; 70

71 Sheet 6; Mayfield Road (From east of Dixie Road to East of Bramalea Road) Landscaping; Sta To ; dated December 12, 2011; received December 15, RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The Region of Peel has proposed to widen Mayfield Road from two to six lanes from Dixie Road to Airport Road. This application specifically pertains to the works located at approximately 230 m west of Bramalea Road on Mayfield Road at Campbell's Cross Creek. The existing 3.65 m wide by 2.1 m high open footed culvert will be removed and replaced with a 10.6m wide by 2.4 m high open footed culvert. A temporary corrugated steel pipe (CSP) flume will be installed to convey flows during construction. In addition, a 3.2 m multi-use path will be constructed on the south side and a pedestrian sidewalk will be constructed on the north side of Mayfield Road. Control of Flooding: No adverse impacts are anticipated to the storage or conveyance of flood waters as a result of this project. Pollution: Standard sediment and erosion controls, silt fence, pea gravel cofferdams, coir mats and filterbags will be in place for the duration of construction, and until the site is restored, to prevent construction generated sediment from entering the watercourse. Dynamic Beaches: Not applicable Erosion: There are no geotechnical/slope stability issues associated with the proposal. Conservation of Land: With the erosion and sedimentation controls in effect, the potential for a Harmful Alteration, Disruption or Destruction (HADD) of fish habitat will be mitigated. All construction activity will be carried out during the Redside Dace Fisheries timing window of July 1 to September 15 unless otherwise specified in writing by the Ministry of Natural Resources (MNR) and a Letter of Advice (LOA) will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). Plantings All trees within the regulated area will be compensated for at a 3:1 ratio. All disturbed areas will be stabilized and restored with native, non-invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3, Infrastructure and Servicing, of the TRCA's Valley and Stream Corridor Management Program. 71

72 CFN: Application #: 0445/11/BRAM Report Prepared by: Ben Krul, extension 5769 For information contact: Ben Krul, extension 5769 Date: October 21, 2013 CITY OF MARKHAM EX10.8 BAYVIEW GLEN CHURCH INC. To site grade on Lot 1, Concession 2, (300 Steeles Avenue East), in the City of Markham, Don River Watershed as located on the property owned by Bayview Glen Church Inc.. The purpose is to acknowledge the placement of fill within a TRCA Regulated Area of the Don River watershed for the asphalt resurfacing of an existing surface parking lot for Bayview Glen Church at 300 Steeles Avenue East in the City of Markham. The described works were carried out without the benefit of any TRCA or municipal permits. The permit will be issued for the period of November 1, 2013 to April 30, 2014 in accordance with the following documents and plans which form part of this permit: Topographic Survey of the parking lot, prepared by Tham Surveying Limited, dated September 13, 2013, received on September 24, 2013; Letter - Description of Works, prepared by D. Crupi & Sons Limited, dated August 30, 2013, received on September 24, RATIONALE The application was reviewed by staff on the basis of the following information: 72

73 Proposal: The purpose of this application is to resolve an outstanding violation and acknowledge the placement of fill for the asphalt resurfacing of an existing surface parking lot within a TRCA Regulated Area of the Don River watershed at 300 Steeles Avenue East, in the City of Markham. The footprint of the parking lot remains unchanged. The described works were carried out without the benefit of any TRCA or municipal permits. The subject property is located on the north side of Steeles Avenue East, east of Bayview Avenue in the City of Markham. The area of disturbance was adjacent to a tributary of the Don River and within the Regional Storm Floodplain. In order to complete the works, the proponent plans to install precast concrete curbs on the existing asphalt along the river side. Minor grading, a strip of topsoil (2-feet in width), is proposed on the eastern edge of the parking lot to ease the transition in site elevations. The top soil is to be seeded with a native seed mix. Fee and Permit Timing: The applicant initiated works in advance of a permit under Ontario Regulation 166/06 being issued, therefore the permit is to be issued "after the fact". The applicant has paid the appropriate fees for a permit "after the fact" in association with the violation. In addition, the time frame for this permit will be adjusted and reduced to reflect the works that have already been completed to date. Control of Flooding: The asphalt resurfacing took place entirely within a Regulated Floodplain of the Don River. These works will have no impact on flood conveyance or storage as the footprint of the parking lot remains unchanged and any grade changes are minor in nature. Pollution: Sediment controls are not required as the proposed works are already completed. No construction debris will result from the remaining scope of work. Dynamic Beaches: Not applicable. Erosion: There are no slope stability/geotechnical concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a result of this project. Additionally, there are no fisheries related concerns associated with these works. Plantings As no significant vegetation will be removed, no additional plantings are required. Policy Guidelines: The proposal complies with Section 4.2.2(E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program. 73

74 CFN: Application #: 0880/13/MARK Report Prepared by: Nicole Moxley, extension 5284 For information contact: Doris Cheng, extension 5306 Date: October 18, 2013 EX HIGHWAY 7 To construct, reconstruct, erect or place a building or structure on Lot 10, Concession 8, (6127 Highway 7), in the City of Markham, Rouge River Watershed. The purpose is to undertake works within TRCA's Regulated Area of the Rouge River Watershed in order to facilitate the construction of a vestibule with an underground storage room approximately 12' x 10' in size, associated with a municipal building permit. The permit will be issued for the period of November 1, 2013 to October 31, 2015 in accordance with the following documents and plans which form part of this permit: Drawing no. AS-1, Site Plan, prepared by Crang & Boake Architects, dated May 24, 2013, stamped received September 20, 2013; Drawing No. A-1, Basement Plan, prepared by Crang & Boake Architects, dated May 24, 2013, stamped received September 2013; Drawing No. A-4, East Elevation, prepared by Crang & Boake Architects, dated May 24, 2013, stamped received September 2013; Drawing No. A-5, North Elevation, prepared by Crang & Boake Architects, dated May 24, 2013, stamped received September 2013; Drawing No. A-2, Ground Floor Plan, prepared by Crang & Boake Architects, dated May 24, 2013, stamped received September 2013; Drawing No. A-6, Cross Section, prepared by Crang & Boake Architects, dated May 24, 2013, stamped received September RATIONALE The application was reviewed by staff on the basis of the following information: 74

75 Proposal: the purpose of this application is to undertake works within TRCA's Regulated Area of the Rouge River Watershed in order to facilitate the construction of a vestibule with an underground storage room approximately 12' x 10' in size, associated with a municipal building permit. The subject property is located within a valley system associated with Exhibition Creek, a tributary of the Rouge River Watershed. TRCA Geotechnical Engineering staff confirmed that there are no geotechnical and/or slope stability concerns anticipated as a result of this project. Additionally there are no ecology or flood-related concerns anticipated with this project. Control of Flooding: The proposed works are located outside of the Regional Floodplain. As such, there are no flood-related concerns anticipated with this project. Pollution: Appropriate erosion and sediment controls are proposed with this application. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and/or slope stability concerns anticipated with this application. Conservation of Land: The location of the proposed vestibule with an underground storage room is void of any significant vegetation. As such, no significant vegetation will be removed as a result of this project. In addition, there are no fisheries-related concerns anticipated with this project. Plantings As no vegetation is to be removed by the proposed works, plantings are not required at this time. Policy Guidelines: This proposal is in conformity with Section (C) - Minor Additions - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: Application #: 0878/13/MARK Report Prepared by: Jeffrey Thompson, extension 5386 For information contact: Doris Cheng, extension 5306 Date: October 21, 2013 CITY OF MISSISSAUGA EX LANCASTER AVENUE To construct, reconstruct, erect or place a building or structure on Lot 198, Plan 436, (7161 Lancaster Avenue), in the City of Mississauga, Mimico Creek Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Mimico Creek Watershed in order to facilitate the construction of a sq. m (2, sq. ft.) single family dwelling at 7161 Lancaster Avenue associated with a municipal building permit. 75

76 The permit will be issued for the period of November 1, 2013 to October 31, 2015 in accordance with the following documents and plans which form part of this permit: Drawing No. SP-1, Site Plan, prepared by Sanpro Engineering Inc., dated September 2013, stamped received by TRCA Planning & Development on September 26, 2013; Drawing No. A-1, Ground Floor & Basement Plan, prepared by Sanpro Engineering Inc., dated September 2013, stamped received by TRCA Planning & Development on September 26, 2013; Drawing No. A-2, Roof Plan and Second Floor Plans, prepared by Sanpro Engineering Inc., dated September 2013, stamped received by TRCA Planning & Development on September 26, 2013; Drawing No. A-3, Elevations and Building Sections, prepared by Sanpro Engineering Inc., dated September 2013, stamped received by TRCA Planning & Development on September 26, RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Mimico Creek Watershed in order to facilitate the construction of a sq. m (2, sq. ft.) replacement single family dwelling at 7161 Lancaster Avenue associated with a municipal building permit. The subject property is located east of Airport Road, north of Derry Road East and south of Morning Star Drive, in the City of Mississauga. The subject property is located within an approved subdivision and currently contains an existing dwelling, which is proposed to be demolished. The subject property is located outside of the Regional Floodplain and is sufficiently setback from the valley corridor. In addition, the area of the proposed works does not contain any significant natural features. As such, there are no flooding, geotechnical or ecology related concerns with this application. 76

77 Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, there are no anticipated impacts to the storage and/or conveyance of flood waters. Pollution: Appropriate erosion and sediment control (i.e. silt fence) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable Erosion: There are no geotechnical and/or slope stability concerns anticipated with this application. Conservation of Land: No significant vegetation will be removed as a result of the proposed construction. In addition, there are no fisheries concerns with this application. Plantings As no significant vegetation will be removed, no additional plantings are required. Policy Guidelines: This proposal is consistent with Section (D) - Replacement Structures - of the Authority's Valley and Stream Corridor Management (VSCMP). CFN: Application #: 0890/13/MISS Report Prepared by: Anant Patel, extension 5618 For information contact: Leilani Lee-Yates, extension 5370 Date: October 18, 2013 CITY OF TORONTO [ETOBICOKE YORK COMMUNITY COUNCIL AREA] EX RIVERBANK DRIVE To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lot 8, 9, 10, 11, 12, Concession A Lot 8, 9, 10, 11, 12, Plan 3390/2451, (45 Riverbank Drive), in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed. The purpose is to replace an existing bridge and footings, minor channel realignment, stabilize a portion of the creek bank and reconfigure the 15th fairway and green. 77

78 The permit will be issued for the period of November 1, 2013 to October 31, 2015 in accordance with the following documents and plans which form part of this permit: Letter of Undertaking, prepared by Islington Golf Club Limited, dated August 27, RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: It is proposed to reconfigure the 15th Fairway to address safety and liability issues associated with the hole in its present configuration while improving the playability of the hole and improving aesthetics along Kipling Avenue. Specific works include the following: The existing bridge will be replaced with a new longer span bridge; minor realignment of the creek and bank stabilization works near the 15th Fairway; 15 th Green will be relocated approximately 20 metres to the east of its present location and further away from Kipling Avenue; regrading and tree removal on a portion of the slope will be required to accommodate the new Green. Environmental enhancements have been incorporated into the proposed layout such as increased canopy cover over the creek, increased extent of naturalized areas, improved conveyance capacity in the creek, removal of failing gabions replaced with more natural biotechnical stabilization and revegetation of the stream corridor, and the creation of a wetland that provides a degree of water quality enhancement from an existing storm sewer discharge. The subject property is located in the area east of Kipling Avenue and north of Burnhamthorpe Road. Control of Flooding: The proposed works will be partially located within the Regional Storm Floodplain, however they will not affect the storage or conveyance of floodwaters. 78

79 Pollution: Silt fencing and/or riverstone coffer dams will be installed around all construction areas to prevent the migration of construction generated sediment into the watercourse. Dynamic Beaches: Not applicable Erosion: A geotechnical design report and meander belt assessment report were reviewed and approved by TRCA engineering staff. Conservation of Land: All filled and disturbed areas will be stabilized and revegetated following construction. No significant resource features will be impacted by the proposed works. Some of the proposed works will be executed below the existing top of bank of the watercourse, however there will be no impact to fisheries as all work will be conducted in the dry. The works will not result in a HADD and a letter of advise will be issued on behalf of DFO. A comprehensive restoration plan has been reviewed and approved by TRCA and Urban Forestry Staff at the City of Toronto. Plantings All plantings will be in accordance with TRCA's Post-Construction Restoration Guidelines and Seed Mix Guidelines. Policy Guidelines: The proposal is consistent with Section (H) Existing Resource-Based Uses of the Authorities Valley and Stream Corridor Management Program. CFN: Application #: 0610/13/TOR Report Prepared by: Mark Rapus, extension 5259 For information contact: Mark Rapus, extension 5259 Date: October 18, 2013 EX10.12 MARKLAND WOOD COUNTRY CLUB To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 9, Plan 2432, (245 Markland Drive), in the City of Toronto (Etobicoke York Community Council Area), Etobicoke Creek Watershed as located on the property owned by Markland Wood Country Club. The purpose is to undertake refurbishment works to existing greens, tees, and bunkers and service road. 79

80 The permit will be issued for the period of November 1, 2013 to October 31, 2015 in accordance with the following documents and plans which form part of this permit: Letter of Undertaking prepared by Markland Wood Golf Club, dated August 27, RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: It is proposed to renovate a number of greens, tees and bunkers to improve turf conditions and enhance the playability of the golf course. Specific works include the following: regrading of several tees, greens and bunkers; and regrading and resurfacing of a segment of existing service road including the installation of an armour stone retaining wall and restoration plantings associated with the service road improvements. The subject property is located west of Highway 427 and north of Dundas Street West. Control of Flooding: The proposed works are located within the Regional Storm Floodplain, however they will not affect the storage or conveyance of floodwaters. Pollution: Silt fencing will be secured around all construction areas to prevent the migration of construction generated sediment into the watercourse. Dynamic Beaches: Not applicable Erosion: Not applicable 80

81 Conservation of Land: All filled and disturbed areas will be stabilized and revegetated following construction. No significant resource features will be impacted by the proposed works. Plantings All plantings will be in accordance with TRCA's Post-Construction Restoration Guidelines and Seed Mix Guidelines. Policy Guidelines: The proposal is consistent with Section (H) Existing Resource-Based Uses of the Authorities Valley and Stream Corridor Management Program. CFN: Application #: 0189/10/TOR Report Prepared by: Mark Rapus, extension 5259 For information contact: Mark Rapus, extension 5259 Date: October 18, 2013 CITY OF TORONTO [SCARBOROUGH COMMUNITY COUNCIL AREA] EX10.13 CITY OF TORONTO To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere, and alter a watercourse, at 51 Beechgrove Drive, in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed, as located on property owned by the City of Toronto. The purpose is to undertake upgrades to an existing wastewater treatment facility. Works will involve construction of new buildings and services, as well as expansion and upgrades to site facilities. The MNR warm water fisheries timing window will apply. A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO) for this project. 81

82 The permit will be issued for the period of November 1, 2013 to October 31, 2015 in accordance with the following documents and plans which form part of this permit: Letter of undertaking from the City of Toronto to TRCA to provide revisions to the engineering and landscape drawings to the satisfaction of TRCA; dated October 2, 2013; received by TRCA on October 3, RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The City of Toronto is proposing upgrades to the Highland Creek Wastewater Treatment Plant, located at 51 Beechgrove Drive, north of Copperfield Road. These works are being necessitated in order to replace the existing main treatment building. Works will involve construction of a new headworks building, biofilter structure and influent chamber to the north of the bend in Beechgrove Drive. Two new permanent roads are to be constructed to allow for access to the biofilter structure and influent chamber; the road to the influent chamber will be asphalt, while the road to the biofilter structure is to be comprised of permeable grass pavers. In order to accommodate the new influent chamber, an existing culvert conveying drainage under the roadway is to be realigned, and the lands south of Beechgrove Drive graded to accommodate the new location of the culvert. A coffer dam is to be established while the culvert is being realigned; flows will be diverted using a bypass pump and discharged through a filter bag to a vegetated area. Rip rap shall be placed at both the upstream and downstream end of the realigned culvert to prevent erosion. The downstream end of this culvert will also be constructed to receive flows from a new roadside drainage feature on the north side of Beechgrove Drive, running under the new permeable paver road. A 900mm concrete sanitary sewer running south from Beechgrove Drive is also part of this project, and will be installed using trench boxes. Once construction of the new facilities is complete, the existing treatment building will be decommissioned. Heavy duty silt fencing will be used to isolate the work areas from the adjacent natural features, employed either as a single row, or as a dual row reinforced with straw bales. Tree protection fencing is also to be established in accordance with City of Toronto Urban Forestry standards. Several trees and several shrubs are to be removed within the TRCA regulated area to accommodate facility expansion. These removals will be compensated through an extensive planting plan that includes native trees, shrubs, sod, or a seed mix. Construction is anticipated to commence in early 2014 and be completed by mid Control of Flooding: The proposed works are not located within the Regional Storm flood plain and are not anticipated to impact flooding, flood storage or conveyance of flood waters. All grades will be maintained or matched. Pollution: Erosion and sediment control measures (silt fence, catch basin filter fabric, filter bag) will be installed prior to construction and maintained for its duration. These measures are being implemented to prevent the release of construction generated sediment into Highland Creek. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction (2006). 82

83 Dynamic Beaches: The proposal will not have any implications to dynamic beaches. Erosion: There are no impacts identified to slope stability or erosion as a result of these works. Conservation of Land: With erosion and sedimentation plans in effect, the potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated. A Letter of Advice (LOA) will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). The Ministry of Natural Resources warm water fisheries timing window will apply to this proposal, unless otherwise specified in writing by MNR. Plantings Several trees and several shrubs are to be removed within the TRCA regulated area to accommodate facility expansion. These removals will be compensated through an extensive planting plan that includes native trees, shrubs, sod, or a seed mix. This restoration plan has been developed in consultation with City of Toronto Urban Forestry staff; tree protection fencing is also to be established in accordance with City of Toronto Urban Forestry standards. The proposed planting plan will ensure that all disturbed areas are restored to pre-construction conditions, or better, upon completion of work. Policy Guidelines: This proposal complies with Section 4.1.2, New Resource-based Uses, of the TRCA s Valley and Stream Corridor Management Program. CFN: Application #: 0679/13/TOR Report Prepared by: Daniel Brent, extension 5774 For information contact: Daniel Brent, extension 5774 Date: October 17, 2013 EX CHINE DRIVE To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 458, Plan 1566, (97 Chine Drive), in the City of Toronto (Scarborough Community Council Area), Waterfront Watershed. The purpose is to construct a second storey addition, rear basement with one and two storey addition, raised rear deck and new rear patio to the existing dwelling at 97 Chine Drive in the City of Toronto (Scarborough Community Council Area). 83

84 The permit will be issued for the period of November 1, 2013 to October 31, 2015 in accordance with the following documents and plans which form part of this permit: Drawing No. SP, Site Plan, prepared by Arc Design Group, dated July 31, 2013, received by TRCA staff on September 6, RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The applicant seeks permission to develop within a TRCA Regulated Area of the Lake Ontario Waterfront in order to facilitate the construction of a two storey with basement rear addition, second storey addition and raised rear deck with patio below to the existing dwelling at 97 Chine Drive. The subject site is located east of Midland Avenue and south of Kingston Road in the City of Toronto (Scarborough Community Council Area). The property is regulated as it is located within the valley corridor and contains the top of valley slope. Control of Flooding: The site is not located within a regional storm flood plain and the proposal will have no impact on the storage and/or conveyance of floodwaters. Pollution: Sediment controls are not required as the subject site is removed from the watercourse. Dynamic Beaches: Not applicable Erosion: There are no slope stability/geotechnical concerns associated with this application. 84

85 Conservation of Land: The proposed works are located no further than the existing limit of development. Plantings Native plantings will be provided as per City of Toronto Urban Forestry Ravine Protection Services Guidelines and recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: This proposal is consistent with Section (B) and (E) - Development Guidelines for Minor Additions, and Property Improvements and Ancillary Structures within Non-Established/Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: Application #: 0813/13/TOR Report Prepared by: Jessica Bester, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: October 16, 2013 CITY OF TORONTO [TORONTO AND EAST YORK COMMUNITY COUNCIL AREA] EX GLENWOOD CRESCENT To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 19, 20, Plan 2983, (22 Glenwood Crescent), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to construct a new two-storey single family detached dwelling at 22 Glenwood Crescent in the City of Toronto (Toronto and East York). The permit will be issued for the period of November 1, 2013 to October 31, 2015 in accordance with the following documents and plans which form part of this permit: 85

86 Drawing No. SP-1, Site Plan, prepared by avtech designs, dated June 13, 2013, received on June 19, 2013, redline revised by TRCA staff on October 21, 2013; Drawing No. 1, South Elevation, submitted by KC Au Architect Inc., received on October 9, 2013; Drawing No. 2, East Elevation, submitted by KC Au Architect Inc., received on October 9, 2013; Drawing No. 3, North Elevation, submitted by KC Au Architect Inc., received on October 9, 2013; Drawing No. 4, West Elevation, submitted by KC Au Architect Inc., received on October 9, RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a new two-storey single family detached dwelling at 22 Glenwood Crescent. The subject site is located south of St. Clair Avenue East and west of O'Connor Drive in the City of Toronto (Toronto and East York Community Council Area). Control of Flooding: The site is not located within a regional storm flood plain and the proposal will have no impact on the storage and/or conveyance of floodwaters. Pollution: Sediment controls will be installed and maintained during construction to prevent debris from entering the adjacent ravine. Dynamic Beaches: Not applicable Erosion: There are no slope stability/geotechnical concerns associated with this application. Conservation of Land: The proposed works are located no further towards the valley slope. The appropriate tree protection fencing will be installed. Plantings Native plantings will be provided as per City of Toronto Urban Forestry Ravine Protection Services Guidelines and recommendations pertaining to tree protection and maintenance during construction will be implemented Policy Guidelines: This proposal is consistent with Section (D) - Development Guidelines for Replacement Structures within Non-Established/Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. 86

87 CFN: Application #: 0536/13/TOR Report Prepared by: Vanessa Aubrey, extension 5662 For information contact: Mark Rapus, extension 5259 Date: October 21, 2013 EX10.16 PHYLLO INVESTMENTS INC. / RUE DE LUX To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 4, Plan 383E, (9 Thornwood Road), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed as located on the property owned by Phyllo Investments Inc. / Rue De Lux. The purpose is to reconstruct a failed portion of the slope and replace the french drain discharge pipes located to the rear of the existing multi-unit residential building at 9 Thornwood Road in the City of Toronto (Toronto and East York Community Council Area). The permit will be issued for the period of November 1, 2013 to October 31, 2015 in accordance with the following documents and plans which form part of this permit: Drawing No. L001, Tree Protection and Sediment Control Plan, prepared by Janet Rosenberg & Studio, dated August 23, 2013, received September 13, 2013; Drawing No. L002, Demolition and Removals Plan, prepared by Janet Rosenberg & Studio, dated August 21, 2013, received September 13, 2013; Drawing No. L100, Landscape Layout Plan - Rear, prepared by Janet Rosenberg & Studio, dated August 30, 2013, received September 13, 2013; Drawing No. L300, Planting Plan, prepared by Janet Rosenberg & Studio, dated August 27, 2013, received September 13, 2013; Drawing No. L400, Landscape Sections, prepared by Janet Rosenberg & Studio, dated September 4, 2013, received September 13, 2013; Drawing No. L500, Landscape Details, prepared by Janet Rosenberg & Studio, dated August 26, 2013, received September 13, RATIONALE The application was reviewed by staff on the basis of the following information: 87

88 Proposal: The purpose of this application is to develop within the TRCA Regulated Area of the Don River Watershed in order to facilitate the reconstruction of a failed portion of the valley slope and replace the french drain discharge pipes located to the rear of the existing multi-unit residential building at 9 Thornwoood Road. The subject property is located west of Mount Pleasant Road and south of St. Clair Avenue East, and backs onto David Balfour Park in the City of Toronto (Toronto and East York Community Council Area). During the major storm event on July 8, 2013, the large influx of rain caused the slope to fail and experience significant erosion. Given the proximity of the slope to the residence and adjoining public park, the slope should be reconstructed and restored as soon as possible. Control of Flooding: The site is not located within a regional storm flood plain and the proposal will have no impact on the storage and/or conveyance of floodwaters. Pollution: The applicant has provided an erosion and sediment and erosion control plan as well as a construction access and staging plan to ensure the adjoining properties will not be affected. Dynamic Beaches: Not applicable Erosion: A geotechnical report and the proposed drawings have been reviewed and approved by TRCA Geotechnical Engineering staff. Conservation of Land: The proposal will restore an area of natural slope damaged due to the impact of a storm event. The slope will be restored and re-vegetated with native seed mix, trees and shrubs to allow it to re-naturalize over time. Tree protection fencing will also be in place to ensure there will be no further damage to existing trees. Plantings Native plantings will be provided as per City of Toronto Urban Forestry Ravine Protection Services Guidelines and recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: The proposal is consistent with Section Erosion Control and Slope Stability Remedial Works within the TRCA Valley and Stream Corridor Management Program. CFN: Application #: 0886/13/TOR Report Prepared by: Vanessa Aubrey, extension 5662 For information contact: Steve Heuchert, extension 5311 Date: October 21,

89 EX CASTLE FRANK CRESCENT To construct, reconstruct, erect or place a building or structure on Lot 8, Plan 686, (19 Castle Frank Crescent), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to construct a new two-tiered deck to the rear and carry out minor landscaping in the side yard of the existing single family detached dwelling at 19 Castle Frank Crescent in the City of Toronto (Toronto and East York). The permit will be issued for the period of November 1, 2013 to October 31, 2015 in accordance with the following documents and plans which form part of this permit: Drawing No. L-1, Site Plan, prepared by john lloyd & associates, dated January 17, 2013, received on August 23, 2013; Drawing No. L-2, Site Plan Details, prepared by john lloyd & associates, dated January 17, 2013, received on August 23, 2013; Drawing No. L-3, Elevations, prepared by john lloyd & associates, dated January 17, 2013, received on August 23, RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within the TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a new two-tied deck to the rear and carry out minor landscaping in the side yard of the existing single family detached dwelling at 19 Castle Frank Crescent. The subject site is located south of Bloor Street East and west of Bayview Avenue in the City of Toronto (Toronto and East York Community Council Area). Control of Flooding: The site is not located within a regional storm flood plain and the proposal will have no impact on the storage and/or conveyance of floodwaters. 89

90 Pollution: Sediment controls will be installed and maintained during construction to prevent debris from entering the adjacent ravine. Dynamic Beaches: Not applicable Erosion: A geotechnical brief has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance with the recommendations of this report. Conservation of Land: TRCA staff are satisfied that there will be no geotechnical/slope stability issues associated with the completed works. The proposed works are adequately set back from the top of bank. There are no other significant natural features on, or adjacent to, the site that would be negatively impacted by the project. Plantings Native plantings will be provided as per City of Toronto Urban Forestry Ravine Protection Services Guidelines and recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: The proposal is consistent with Section (E) - Development Guidelines for Property Improvements and Ancillary Structures within Non-Established/Highly Urbanized Areas of the TRCA s Valley and Stream Corridor Management Program. CFN: Application #: 0313/13/TOR Report Prepared by: Vanessa Aubrey, extension 5662 For information contact: Mark Rapus, extension 5259 Date: October 21, 2013 CITY OF VAUGHAN EX10.18 YORK CONDOMINIUM CORPORATION NO. 204 To construct, reconstruct, erect or place a building or structure on Block A, B, C, Plan M-1466, (88 Rainbow Drive), in the City of Vaughan, Humber River Watershed as located on the property owned by York Condominium Corporation No The purpose is to reconstruct a number of existing wooden decks / balconies within a Regulated Area of the Humber River watershed at 88 Rainbow Drive in the City of Vaughan. 90

91 The permit will be issued for the period of November 1, 2013 to October 31, 2015 in accordance with the following documents and plans which form part of this permit: Site Plan, prepared by EXP Services Inc., dated August 19, 2013, received by the TRCA September 25, 2013; Deck Plan, drawing no. SK-1, prepared by EXP Services Inc., revise dated September 18, 2013, received by the TRCA September 25, RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to reconstruct a number of existing wooden decks within a Regulated Area of the Humber River watershed. The subject property is located adjacent to the Robinson Creek valley corridor. Based upon a site visit conducted by TRCA staff on October 2, 2013, the top-of-slope of the valley is located near the rear property line, has a gentle configuration (approximately 4 horizontal : 1 vertical) and currently contains a paved pathway. All of the proposed works are approximately 6 metres or more away from the top-of-slope and will not impact the slope's stability. No vegetation removals are required as result of these works. Control of Flooding: The subject property is not located within the Regional Storm Flood Plain. There will be no impacts on the storage or conveyance of flood waters. Pollution: Sediment control fencing will be erected and maintained for the duration of construction to prevent the transport of sediment into the adjacent valley system. 91

92 Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this application. Conservation of Land: As a watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project. Plantings All disturbed areas will be restored to the existing sodded condition and will not affect any significant natural features. Policy Guidelines: The proposal is consistent with Section E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: Application #: 0876/13/VAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: June Little, extension 5756 Date: October 17, 2013 TOWN OF CALEDON EX KING STREET To construct, reconstruct, erect or place a building or structure on Lot 13, Plan 43R-35293, (3561 King Street), in the Town of Caledon, Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a 3,250 sq. ft. (301.9 sq. m) single family dwelling with porch and septic system associated with a municipal building permit. 92

93 The permit will be issued for the period of November 1, 2013 to October 31, 2015 in accordance with the following documents and plans which form part of this permit: Dwg # 3A, Siting and Grading, prepared by Renaissance Nouveau Design Inc., dated September 12, 2013, stamped received by TRCA Planning & Development on September 24, 2013; Page No. 1 of 6, Basement Floor Plan, prepared by Renaissance Nouveau Design Inc., dated September 18, 2013, stamped received by TRCA Planning & Development on September 24, 2013; Page No. 2 of 6, Ground Floor Plan, prepared by Renaissance Nouveau Design Inc., dated September 18, 2013, stamped received by TRCA Planning & Development on September 24, 2013; Page No. 3 of 6, Roof Plan, prepared by Renaissance Nouveau Design Inc., dated September 18, 2013, stamped received by TRCA Planning & Development on September 24, 2013; Page No. 4 of 6, Front & Right Side Elevation, prepared by Renaissance Nouveau Design Inc., dated September 18, 2013, stamped received by TRCA Planning & Development on September 24, 2013; Page No. 5 of 6, Rear & Left Side Elevation, prepared by Renaissance Nouveau Design Inc., dated September 18, 2013, stamped received by TRCA Planning & Development on September 24, 2013; Erosion and Sediment Control, prepared by Crozier & Associated Consulting Engineers; dated September 27, 2012, stamped received by TRCA Planning & Development on September 24, RATIONALE The application was reviewed by staff on the basis of the following information: 93

94 Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a 3,250 sq. ft. (301.9 sq. m) single family dwelling with a porch and septic system located at 3561 King Street associated with a municipal building permit. The subject property is located east of Kennedy Road, west of Heart Lake Road and south of King Street, in the Town of Caledon. The subject property is adjacent to the Campbell's Cross valley corridor, which is a tributary of the Humber River. The proposed works are located a sufficient distance from the valley corridor, and the subject property does not contain any significant natural features. As such, there are no ecology related concerns with this proposal. Additionally, there are no flooding, hydrological, or geotechnical related concerns with this application. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and/or conveyance of flood waters is anticipated as a result of the proposed works. Pollution: Appropriate erosion and sediment controls (i.e. silt fence) have been proposed with this application and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable Erosion: There are no geotechnical and/or slope stability concerns anticipated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. There are no fisheries concerns related to this project. Plantings As no significant vegetation will be removed as a result of this proposal, no plantings are required. Policy Guidelines: The proposal is in conformity with Section New Urban Development, of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: Application #: 0873/13/CAL Report Prepared by: Anant Patel, extension 5618 For information contact: Leilani Lee-Yates, extension 5370 Date: October 18,

95 EX VICTORIA STREET To construct, reconstruct, erect or place a building or structure on Part Lot 150, Block 1, (231 Victoria Street), in the Town of Caledon, Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of an approximate 1,877 sq. ft. ( sq. m) replacement single family dwelling located at 231 Victoria Street associated with a municipal building permit. The permit will be issued for the period of November 1, 2013 to October 31, 2015 in accordance with the following documents and plans which form part of this permit: Sheet No. 1/1, Proposed Site Servicing & Grading Plan C-, prepared by Calder Engineering Ltd., dated October 2013, stamped received by TRCA Planning & Development on October 16, 2013; Drawing # A1, Elevations, prepared by Guildcrest Homes, dated October 15, 2013, stamped received by TRCA Planning & Development on October 16, RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a 1,877 sq. ft. ( sq. m) replacement single family dwelling located at 231 Victoria Street, in the Town of Caledon associated with a municipal building permit. The subject property is located within an approved plan of subdivision located within the Village of Bolton, which is within the larger Humber River valley. However, the subject property is located a sufficient distance from the toe of a valley slope and is also located outside of the Regional Storm Floodplain. Additionally, the subject property does not contain any significant natural features. As such, there are no flooding, hydrological, geotechnical or ecological related concerns anticipated with this proposal. 95

96 Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impact to the storage and/or conveyance of flood waters are anticipated. Pollution: Appropriate erosion and sediment control (i.e. silt fence) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable Erosion: There are no geotechnical and/or slope stability concerns anticipated with this application. Conservation of Land: No significant vegetation will be removed as a result of this project. Additionally, there are no fisheries related concerns associated with these works. Plantings As no significant vegetation will be removed as a result of this proposal, no plantings are required. Policy Guidelines: This proposal is consistent with Section (D) - Replacement Structures - of the Authority's Valley and Stream Corridor Management (VSCMP). CFN: Application #: 0907/13/CAL Report Prepared by: Anant Patel, extension 5618 For information contact: Leilani Lee-Yates, extension 5370 Date: October 18, 2013 TOWN OF RICHMOND HILL EX MAGISTRALE COURT To construct, reconstruct, erect or place a building or structure on Lot 1, Plan 65M2921, (16 Magistrale Court), in the Town of Richmond Hill, Don River Watershed. The purpose is to undertake works within TRCA's Regulated Area of the Don River Watershed in order to facilitate the construction of an inground pool at the rear of an existing dwelling associated with a municipal building permit. 96

97 The permit will be issued for the period of November 1, 2013 to October 31, 2015 in accordance with the following documents and plans which form part of this permit: Site Plan, prepared by Enrique Gomez, no date provided, stamped received by TRCA September 18, RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within TRCA's Regulated Area of the Don River Watershed in order to facilitate the construction of an inground pool at the rear of an existing dwelling associated with a municipal building permit. The rear portion of the subject property is located on a valley slope associated with the Don River Watershed. The proposed works are appropriately setback from the valley slope and, as such, there are no geotechnical concerns anticipated with this project. In addition, there are no ecology or flood-related concerns anticipated with this project. Control of Flooding: The proposed works are located outside of the Regulatory Floodplain. As such, there are no flood-related concerns anticipated with this project. Pollution: Appropriate erosion and sediment controls are proposed with this application. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and/or slope stability concerns anticipated with this project. 97

98 Conservation of Land: The location of the proposed works are void of any significant vegetation. As such, no significant vegetation will be removed as part of a result of this project. In addition, there are no fisheries-related concerns anticipated with this project. Plantings As no vegetation is to be removed by the proposed works, plantings are not required at this time. Policy Guidelines: The proposal is in conformity with Section (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: Application #: 0850/13/RH Report Prepared by: Jeffrey Thompson, extension 5386 For information contact: Doris Cheng, extension 5306 Date: October 21, 2013 EX10.22 REGIONAL MUNICIPALITY OF YORK To construct - reconstruct - erect or place a building or structure, temporarily or permanently place - dump or remove any material - originating on the site or elsewhere, interfere with a wetland and watercourse on Bathurst Street from Gamble Road to north Richmond Hill Reservoir, from Teston Road to Major Mackenzie Drive and on Teston Road, from the proposed West Richmond Hill Pumping Station to Bathurst Street, in the Town of Richmond Hill, Don River Watershed as located on the property owned by Regional Municipality of York. The purpose is to undertake construction of a watermain along Bathurst Street and Teston Road. The Redside Dace fisheries timing window will apply to this project unless otherwise specified in writing by Ministry of Natural Resources (MNR). A letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). The permit will be issued for the period of November 1, 2013 to October 31, 2015 in accordance with the following documents and plans which form part of this permit: 98

99 Letter of Undertaking to provide minor revisions to engineering drawings and notes to the satisfaction of TRCA staff, prepared by Regional Municipality of York, dated October 22, 2013, received by TRCA on October 22, RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to undertake construction of a watermain along Bathurst Street and Teston Road in the Town of Richmond Hill, Don River Watershed, Regional Municipality of York. The works will include construction of a 1050mm watermain on Bathurst Street from Teston Road to approximately 100m north of Major Mackenzie Drive, along Bathurst Street from 60m south of Gamble Road to the existing North Richmond Hill Reservoir, and along Teston Road from proposed West Richmond Hill Pumping Station to Bathurst Street. The watermains will be constructed using open-cut methods through roads and boulevards and trenchless methods underneath watercourse crossings. Control of Flooding: The proposed project is not anticipated to impact flooding, conveyance or storage of floodwaters. Pollution: Standard erosion and sediment control measures, including silt fencing will be implemented prior to construction and maintained for the duration of construction and until the site is stabilized and restored in order to prevent construction generated sediments from entering any watercourse or wetland. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction. Dynamic Beaches: Not applicable Erosion: No geotechnical/slope stability issues have been identified. Conservation of Land: With erosion and sedimentation plans in effect, the potential for a Harmful, Alteration Disruption or Destruction (HADD) of fish habitat will be mitigated. A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). The Ministry of Natural Resources (MNR) Redside Dace fisheries timing window of July 1 to September 15 will apply to this proposal unless otherwise specified in writing by MNR. Plantings All disturbed areas will be restored with native non-invasive species. Policy Guidelines: This proposal complies with Section Infrastructure and Servicing - of the Toronto and Region Conservation Authority's Valley and Stream Corridor Management Program. 99

100 CFN: Application #: 0373/13/RH Report Prepared by: Harsha Gammanpila, extension 5629 For information contact: Harsha Gammanpila, extension 5629 Date: October 21, 2013 EX GAMBLE GLEN CRESCENT To construct, reconstruct, erect or place a building or structure on Lot 55, Concession 1 Block 2, Plan 65M-4280, (43 Gamble Glen Crescent), in the Town of Richmond Hill, Don River Watershed. The purpose is to replace a wooden deck approximately 5.4m x 9m to the rear of an existing dwelling within TRCA's Regulated Area of the Don River Watershed. The permit will be issued for the period of November 1, 2013 to October 31, 2014 in accordance with the following documents and plans which form part of this permit: Deck Layout, prepared by Vasily Dernis, dated August 28, 2013, stamped received September 19, RATIONALE The application was reviewed by staff on the basis of the following information: 100

101 Proposal: The purpose of this application is to construct a replacement wooden deck approximately 5.4m x 9m to the rear of an existing dwelling within TRCA's Regulated Area of the Don River Watershed. The deck is being reduced in size to comply with municipal zoning requirements. The original deck was constructed without TRCA or municipal building permits. As such, the City required the landowner to comply with zoning standards and reduce the size of the deck. The subject property is located adjacent to a valley corridor associated with German Mills Creek, a tributary of the Don River watershed. TRCA Geotechnical Engineering staff have reviewed this application and do not anticipate any geotechnical and/or slope stability concerns as a result of the proposed works. In addition, there are no ecology or flood-related concerns anticipated with this application. Fee and Permit Timing: The applicant initiated works in advance of a permit under Ontario Regulation 166/06 being issued, therefore the permit is to be issued "after the fact". The applicant has paid the application fee plus 100% as required for a permit "after the fact" in association with the violation. Given that the proposed works are being undertaken to adhere to municipal zoning by-law requirements, and that a portion of the undertaken works are complete, the time frame for this permit has been adjusted. Control of Flooding: The proposed works are located outside of the Regulatory Floodplain. As such, there are no anticipated impacts to the storage and/or conveyance of floodwaters as a result of this application. Pollution: Appropriate erosion and sediment controls will be in place throughout the completion of this project. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and/or slope stability concerns anticipated with this project. Conservation of Land: The location of the existing deck, including all modifications and repairs, is void of any significant vegetation. As such, no significant vegetation will be removed as a result of this project. In addition, there are no fisheries-related concerns anticipated with this project. Plantings As no vegetation is to be removed by the proposed works, plantings are not required at this time. Policy Guidelines: The proposal is in conformity with Section (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). 101

102 CFN: Application #: 0877/13/RH Report Prepared by: Jeffrey Thompson, extension 5386 For information contact: Jeffrey Thompson, extension 5386 Date: October 21, 2013 TOWN OF WHITCHURCH-STOUFFVILLE EX KENNEDY ROAD To construct, reconstruct, erect or place a building or structure and change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 7, Concession 6, (13231 Kennedy Road), in the Town of Whitchurch-Stouffville, Rouge River Watershed. The purpose is to reconstruct an ancillary log building on the west side of the residential property located at Kennedy Road in the Town of Whitchurch-Stouffville. The permit will be issued for the period of November 1, 2013 to October 31, 2015 in accordance with the following documents and plans which form part of this permit: Lot Survey Sketch, Site Plan, submitted by William Han, dated 2007, received on August 29, 2013; Drawing #2, Log Out Building, submitted by William Han, dated November 2008, received on August 29, RATIONALE The application was reviewed by staff on the basis of the following information: 102

103 Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction an ancillary log building on the west side of a residential property located at Kennedy Road. The proposed works will be located within an Area of Interference associated with a locally significant wetland within the Oak Ridges Moraine. The building will be constructed on pre-existing foundations in an area that is located outside of the wetlands and absent of any significant vegetation. The subject property is located northeast of Bethesda Road and is on the east side Kennedy Road in the Town of Whitchurch-Stouffville. Control of Flooding: Not applicable. Pollution: The proposed building will be constructed at present grades and only limited grading is anticipated. No sediment and erosion controls are required as part of this proposal. Dynamic Beaches: Not applicable Erosion: There are no slope stability and/or erosion concerns with this proposal. Conservation of Land: The ancillary log building is sited away from the nearby wetlands and will be constructed on pre-existing foundations in a location that was formerly a manicured lawn. No significant vegetation will be removed as a result of construction. Plantings No plantings are required as part of this project. Policy Guidelines: The proposal is consistent with Section (E) - Development Guidelines for Property Improvements and Ancillary Structures within Non-Established/Highly Urbanized Areas of the TRCA s Valley and Stream Corridor Management Program. CFN: Application #: 0820/13/WS Report Prepared by: Vanessa Aubrey, extension 5662 For information contact: Chris Jones, extension 5718 Date: October 21,

104 TOWNSHIP OF KING EX TH SIDEROAD To construct, reconstruct, erect or place a building or structure and change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Part Lot 15, Concession 5, ( th Sideroad), in the Township of King, Humber River Watershed. The purpose is to construct an addition to an existing dwelling within a Regulated Area of the Humber River watershed at th Sideroad in the Township of King. The permit will be issued for the period of November 1, 2013 to October 31, 2015 in accordance with the following documents and plans which form part of this permit: Site Plan & Grading Plan, drawing SP-1, prepared by Phoenix Design Group, revise dated October 7, 2013, received by the TRCA October 16, 2013, redline revised to indicate location of sediment control fencing and removal of excess fill material. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct a second storey addition and expand an existing attached garage within a Regulated Area of the Humber River watershed. The subject property is entirely regulated as it is located within the 120 metre Wetland Area of Interference of a number of wetlands located on or partially on the subject property. 104

105 Based upon a site visit conducted by TRCA staff on June 12, 2013, we note that the proposed works are all located on already disturbed areas that are flat and devoid of significant vegetation. The only expansion to the footprint of the existing dwelling does not result in increased encroachment towards the natural features on the property. All other works are located over the existing building footprint. The works are also significantly set back from the nearest wetland (approximately 25 metres). On this basis, TRCA Ecology staff are satisfied that the proposed addition will not have any impacts on the nearby wetland features. A permit under Ontario Regulation 166/06 was previously issued to the construction of a septic system on the property (Permit No. C , issued August 9, 2013). Control of Flooding: The subject property is not located within the Regional Storm Flood Plain. There will be no impacts on the storage or conveyance of flood waters. Pollution: Sediment control fencing will be erected and maintained for the duration of construction to prevent the transport of sediment into the nearby wetland features and vegetated areas. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this application. Conservation of Land: As a watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project. Plantings All disturbed areas will be restored to the existing sodded condition and will not affect any significant natural features. Policy Guidelines: The proposal is consistent with Section Existing Development - of the Authority's Valley and Stream Corridor Management Program. CFN: Application #: 0915/13/KING Report Prepared by: Anthony Sun, extension 5724 For information contact: June Little, extension 5756 Date: October 18, 2013 PERMIT APPLICATIONS EX EX10.33 MAJOR ERRATA ITEMS Applications that involved a more complex suite of technical studies to demonstrate consistency with policies; applications that cover a significant geographic area (e.g. subdivisions, stormwater management ponds), extensive modifications to the landscape, major infrastructure projects, emergency works, resolution of violations/after the fact permits, trail construction 105

106 CITY OF TORONTO [ETOBICOKE YORK COMMUNITY COUNCIL AREA] EX BONNYVIEW DRIVE To construct, reconstruct, erect or place a building or structure and change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 27, Plan 2234, (55 Bonnyview Drive), in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed. The purpose is to construct a new two-storey single family detached dwelling at 55 Bonnyview Drive in the City of Toronto (Etobicoke York). The permit will be issued for the period of November 1, 2013 to October 31, The documents and plans which form part of this permit will be listed in a separate report RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Mimico Creek watershed in order to facilitate the construction of a new two-storey single family detached dwelling at 55 Bonnyview Drive. The subject site is located west of Park Lawn Road and north of the Queensway in the City of Toronto (Etobicoke York Community Council Area). 106

107 Control of Flooding: The property is located within the Regulatory Floodplain of the Mimico Creek. The new dwelling will be dry passive flood proofed to the Regional Storm elevation. A letter prepared by a certified structural engineer confirms that the new dwelling has been designed to withstand the flood elevations and velocities associated with a Regional Storm Event. The proposed works will be constructed in accordance with this letter. Pollution: Sediment controls are not required as the subject site is located at the toe of a slope and removed from the watercourse. Dynamic Beaches: Not applicable Erosion: There are no slope stability/geotechnical concerns associated with this application. Conservation of Land: The proposed works are located no further towards the valley slope. There are no other significant natural features on, or adjacent to, the site that would be negatively impacted by the project. Plantings No plantings are required as part of this project. Policy Guidelines: This proposal is consistent with Section (D) - Development Guidelines for Replacement Structures within Non-Established/Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: Application #: 0893/13/TOR Report Prepared by: Vanessa Aubrey, extension 5662 For information contact: Mark Rapus, extension 5259 Date: October 21, 2013 CITY OF TORONTO [NORTH YORK COMMUNITY COUNCIL AREA] EX10.27 AMIN TAHERZADEH To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 15, Plan 2405, Part Lot 14, Plan, (50 Donwoods Drive), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to construct a two-storey replacement dwelling, raised rear deck, new in-ground swimming pool with new cabanas and associated landscaping at 50 Donwoods Drive in the City of Toronto (North York Community Council Area). 107

108 The permit will be issued for the period of November 1, 2013 to October 31, The documents and plans which form part of this permit will be listed in a separate report RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The applicant seeks permission to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a two-storey replacement dwelling, raised rear deck, new in-ground swimming pool with new cabanas and associated landscaping at 50 Donwoods Drive. The subject site is located east of Yonge Street and south of York Mills Road in the City of Toronto (North York Community Council Area). The property is regulated as it is located within the valley, below the top of bank and partially within the Regulatory Floodplain of the West Don River. Control of Flooding: The subject property is partially located with the Regulatory Floodplain of the West Don River and the Hoggs Hollow Special Policy Area (SPA). The new dwelling will be dry passive flood proofed to the regional storm event elevation. A letter from a structural engineer stating that the proposed dwelling is designed to withstand the depths and velocity's of the Regional Storm Event has been received and accepted by technical staff. Pollution: Sediment controls are not required as the subject site is located at the toe of a slope and removed from the watercourse. Dynamic Beaches: Not applicable 108

109 Erosion: There are no slope stability/geotechnical concerns associated with this application. Conservation of Land: All filled and disturbed areas will be stabilized and re-vegetated following construction. Plantings Native plantings will be provided as per City of Toronto Urban Forestry Ravine Protection Services Guidelines and recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: The proposal is consistent with Section 4.2.1(B) - Development Guidelines for Development/Redevelopment within Designated Two Zone/Special Policy Areas - of the TRCA s Valley and Stream Corridor Management Program. CFN: Application #: 0768/13/TOR Report Prepared by: Jessica Bester, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: October 16, 2013 EX10.28 CITY OF TORONTO To construct, reconstruct, erect or place a building or structure, site grade, and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere, near Eglinton Avenue East and Bermondsey Road, in the City of Toronto (North York Community Council Area), Don River Watershed, as located on property owned by the City of Toronto. The purpose is to construct a new sidewalk. Works will involve installation of new concrete sidewalk and retaining walls. No in-water works are within the scope of this project. The permit will be issued for the period of November 1, 2013 to October 31,

110 The documents and plans which form part of this permit will be listed in a separate report RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The City of Toronto is proposing to construct a new concrete sidewalk along Bermondsey Road between Old Eglinton Avenue East and Bartley Drive. Works will involve construction of the new sidewalk, which will be between 1.7 and 2.3m in width, along the east side of the roadway. To facilitate the proposed sidewalk alignment, several retaining walls will be constructed to maintain the existing slope on the east side of the roadway. These walls will vary in height from 0.6 to 3.5m, with a vegetated grass swale planted along the top. Silt fencing is to be established to isolate the construction area over the watercourse, while the catch basins will be outfitted with filter fabric. Trees that fall within the footprint of the proposed sidewalk and retaining walls will be removed; compensation is to be sought in accordance with City of Toronto Urban Forestry standards. Construction is anticipated to occur in fall Control of Flooding: The proposed works are not located within the Regional Storm flood plain and are not anticipated to impact flooding, flood storage or conveyance of flood waters. Pollution: Erosion and sediment control measures (silt fence, catch basin filter) will be installed prior to construction and maintained for its duration. These measures are being implemented to prevent the release of construction generated sediment into Wilson Brook, a tributary of the East Don River. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction (2006). Dynamic Beaches: The proposal will not have any implications to dynamic beaches. Erosion: There are no impacts identified to slope stability or erosion as a result of these works. Conservation of Land: No in-water works are within the scope of this project. Plantings Several tree removals are associated with this project; these will be compensated by the planting of new trees in accordance with City of Toronto Urban Forestry standards. All disturbed areas will be restored to pre-construction conditions, or better, upon completion of work. Policy Guidelines: This proposal complies with Section 4.3, Infrastructure and Servicing, of the TRCA s Valley and Stream Corridor Management Program. 110

111 CFN: Application #: 0091/12/TOR Report Prepared by: Daniel Brent, extension 5774 For information contact: Daniel Brent, extension 5774 Date: October 18, 2013 EX10.29 CITY OF TORONTO To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 11, Concession 3 EYS Part Block A, Plan 6098, (125 Moatfield Road), in the City of Toronto (North York Community Council Area), Don River Watershed as located on the property owned by City of Toronto. The purpose is to construct a new freestanding pylon sign at 125 Moatfield Drive in the City of Toronto (North York Community Council Area). The permit will be issued for the period of November 1, 2013 to October 31, The documents and plans which form part of this permit will be listed in a separate report RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The applicant seeks permission to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a new freestanding pylon sign at 125 Moatfield Drive. The subject is located west of Don Mills Road and north of York Mills Road in the City of Toronto (North York Community Council Area). The property is regulated as is within the valley, below the top of bank and entirely within the regulatory floodplain of the East Don River. 111

112 Control of Flooding: TRCA staff are satisfied that the proposed works will not affect the storage and conveyance of flood waters. The applicant has provide a letter from a certified Structural Engineer verifying that the proposed will be able to withstand the depths and velocity's of the regional storm. Pollution: Sediment controls are not required as the subject site is removed from the watercourse. Dynamic Beaches: Not applicable Erosion: There are no slope stability/geotechnical concerns associated with this application. Conservation of Land: There are no other significant natural features on, or adjacent to, the site that would be negatively impacted by the proposed sign. Plantings No plantings are required as part of this project. Policy Guidelines: The proposal is consistent with Section (E) - Development Guidelines for Property Improvements and Ancillary Structures within Non-Established/Highly Urbanized Areas of the TRCA s Valley and Stream Corridor Management Program. CFN: Application #: 0889/13/TOR Report Prepared by: Jessica Bester, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: October 16, 2013 CITY OF TORONTO [TORONTO AND EAST YORK COMMUNITY COUNCIL AREA] EX MINTO STREET To construct, reconstruct, erect or place a building or structure and change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Part 2 Lot 20, Plan 633, (18 Minto Street), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to construct a third storey and a new two-storey and basement addition to the rear of the existing two-storey semi-detached dwelling at 18 Minto Street in the City of Toronto (Toronto and East York Community Council Area). 112

113 The permit will be issued for the period of November 1, 2013 to October 31, The documents and plans which form part of this permit will be listed in a separate report RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a new third storey and a two-storey and basement addition to the rear of the existing two-storey semi-detached dwelling at 18 Minto Street. The subject site is located east of Leslie Street and north of Eastern Avenue in the City of Toronto (Toronto and East York Community Council Area). Control of Flooding: The subject property is located within the Regional Storm Floodplain of the Don River and the provincially approved Lower Don Special Policy Area (SPA). The new dwelling will be above the 1:350 Year Storm elevation. A letter prepared by a certified structural engineer confirms that the new dwelling has been designed to withstand the flood elevations and velocities associated with a Regional Storm Event. The proposed works will be constructed in accordance with this letter. Pollution: The proposed construction is well removed from the watercourse. The proponent is required to abide by the municipal sewer by-law so that sediment will not enter the storm sewer system. Dynamic Beaches: Not applicable 113

114 Erosion: There are no slope stability/geotechnical concerns associated with this application. Conservation of Land: The entire property is located within a highly urbanized area surrounded by both commercial and residential developments. There are no significant natural features on the site. Plantings There are no plantings required as part of this proposal. Policy Guidelines: The proposal is consistent with Section 4.2.1(B)3.iii. - Development Guidelines for Development/Redevelopment within Designated Two Zone/Special Policy Areas - of the Authority's Valley and Stream Corridor Management Program. CFN: Application #: 0599/13/TOR Report Prepared by: Vanessa Aubrey, extension 5662 For information contact: Steve Heuchert, extension 5311 Date: October 21, 2013 EX THORNWOOD ROAD To construct, reconstruct, erect or place a building or structure and change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 5, Plan 383 E, Part Lot 30, Plan 365 E, (11 Thornwood Road), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to construct a new two-storey single family detached dwelling including an underground parking garage, rear at-grade permeable paver terrace and wood deck at 11 Thornwood Road. The existing dwelling is to be demolished. The permit will be issued for the period of November 1, 2013 to October 31,

Executive Committee Meeting #7/10

Executive Committee Meeting #7/10 Executive Committee Meeting #7/10 Chair: Vice Chair: Members: Gerri Lynn O'Connor Maria Augimeri David Barrow Gay Cowbourne Glenn De Baeremaeker Suzan Hall Jack Heath Colleen Jordan Ron Moeser Anthony

More information

INDEX TO EXECUTIVE COMMITTEE MEETING #11/14. Friday, January 16, 2015

INDEX TO EXECUTIVE COMMITTEE MEETING #11/14. Friday, January 16, 2015 INDEX TO EXECUTIVE COMMITTEE MEETING #11/14 Friday, January 16, 2015 MINUTES Minutes of Meeting #10/14, held on December 12, 2014 547 ONTARIO REGULATION 166/06, AS AMENDED ENBRIDGE GAS DISTRIBUTION INC.

More information

Executive Committee Meeting #4/12

Executive Committee Meeting #4/12 Executive Committee Meeting #4/12 Chair: Vice Chair: Members: Gerri Lynn O'Connor Maria Augimeri Ben Cachola Vincent Crisanti Glenn De Baeremaeker Michael Di Biase Jack Heath Colleen Jordan Mike Mattos

More information

10.14 ERRATA UPDATE SHEET 3

10.14 ERRATA UPDATE SHEET 3 Executive Committee Meeting Addendum #13/15 January 15, 2016 9:30 A.M. HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN Members: Maria Augimeri Michael Di Biase David Barrow Vincent Crisanti Glenn De Baeremaeker

More information

Executive Committee Meeting #8/12

Executive Committee Meeting #8/12 Executive Committee Meeting #8/12 Chair: Vice Chair: Members: Gerri Lynn O'Connor Maria Augimeri Ben Cachola Vincent Crisanti Glenn De Baeremaeker Michael Di Biase Jack Heath Colleen Jordan Mike Mattos

More information

Executive Committee Meeting Addendum. #7/15 July 3, :30 A.M. HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN Members:

Executive Committee Meeting Addendum. #7/15 July 3, :30 A.M. HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN Members: Executive Committee Meeting Addendum #7/15 July 3, 2015 9:30 A.M. HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN Members: Maria Augimeri Michael Di Biase David Barrow Ronald Chopowick Vincent Crisanti Glenn

More information

Executive Committee Meeting #4/10

Executive Committee Meeting #4/10 Executive Committee Meeting #4/10 Chair: Vice Chair: Members: Gerri Lynn O'Connor Maria Augimeri David Barrow Gay Cowbourne Glenn De Baeremaeker Suzan Hall Jack Heath Colleen Jordan Ron Moeser Anthony

More information

FURTHER TO EXECUTIVE COMMITTEE MEETING #11/12 To be held on Friday, January 11, 2013

FURTHER TO EXECUTIVE COMMITTEE MEETING #11/12 To be held on Friday, January 11, 2013 FURTHER TO EXECUTIVE COMMITTEE MEETING #11/12 To be held on Friday, January 11, 2013 FURTHER TO: Pages EX10. APPLICATION FOR PERMITS UNDER ONTARIO REGULATION 166/06 Development, Interference with Wetlands

More information

Gloria Lindsay Luby. Richard Whitehead. PRESENT VIA TELECONFERENCE Michael Di Biase. Ronald Chopowick Glenn De Baeremaeker Gerri Lynn O'Connor

Gloria Lindsay Luby. Richard Whitehead. PRESENT VIA TELECONFERENCE Michael Di Biase. Ronald Chopowick Glenn De Baeremaeker Gerri Lynn O'Connor MEETING OF THE EXECUTIVE COMMITTEE #3/13 May 10, 2013 The Executive Committee Meeting #3/13, was held in Weston Room B, Black Creek Pioneer Village, on Friday, May 10, 2013. The Chair Gloria Lindsay Luby,

More information

Authority Meeting #8/12

Authority Meeting #8/12 Authority Meeting #8/12 Chair: Vice Chair: Members: Gerri Lynn O'Connor Maria Augimeri October 26, 2012 9:30 A.M. WESTON ROOM B, BLACK CREEK PIONEER VILLAGE AGENDA AUTH EX BAAB Pages Material for Consideration

More information

FURTHER TO EXECUTIVE COMMITTEE MEETING #5/06 To be held on Friday, July 7, ERRATA UPDATE SHEET

FURTHER TO EXECUTIVE COMMITTEE MEETING #5/06 To be held on Friday, July 7, ERRATA UPDATE SHEET FURTHER TO EXECUTIVE COMMITTEE MEETING #5/06 To be held on Friday, July 7, 2006 Pages FURTHER TO: 8. SECTION II - ITEMS FOR EXECUTIVE ACTION 8.1 ERRATA UPDATE SHEET 138-140 WITHDRAWN 8.1.36 CITY OF TORONTO

More information

FURTHER TO EXECUTIVE COMMITTEE MEETING #10/11 To be held on Friday, November 4, 2011

FURTHER TO EXECUTIVE COMMITTEE MEETING #10/11 To be held on Friday, November 4, 2011 FURTHER TO EXECUTIVE COMMITTEE MEETING #10/11 To be held on Friday, November 4, 2011 FURTHER TO: Pages EX4. DELEGATIONS NEW DELEGATION EX4.2 A delegation from Mr. Anton Kikas, P.Eng., O.L.S. with Anton

More information

Executive Committee Meeting #7/12

Executive Committee Meeting #7/12 Executive Committee Meeting #7/12 Chair: Vice Chair: Members: Gerri Lynn O'Connor Maria Augimeri Ben Cachola Vincent Crisanti Glenn De Baeremaeker Michael Di Biase Jack Heath Colleen Jordan Mike Mattos

More information

Authority Meeting #8/11

Authority Meeting #8/11 Authority Meeting #8/11 Chair: Vice Chair: Members: Gerri Lynn O'Connor Maria Augimeri September 30, 2011 9:30 A.M. WESTON ROOM B, BLACK CREEK PIONEER VILLAGE AGENDA AUTH EX BAAB Material for Consideration

More information

Executive Committee Meeting #2/11

Executive Committee Meeting #2/11 Executive Committee Meeting #2/11 Chair: Vice Chair: Members: Gerri Lynn O'Connor Maria Augimeri Bryan Bertie Gay Cowbourne Vincent Crisanti Glenn De Baeremaeker Michael Di Biase Jack Heath Colleen Jordan

More information

FURTHER TO EXECUTIVE COMMITTEE MEETING #7/12 To be held on Friday, September 7, 2012

FURTHER TO EXECUTIVE COMMITTEE MEETING #7/12 To be held on Friday, September 7, 2012 FURTHER TO EXECUTIVE COMMITTEE MEETING #7/12 To be held on Friday, September 7, 2012 FURTHER TO: Pages EX10. APPLICATION FOR PERMITS UNDER ONTARIO REGULATION 166/06 Development, Interference with Wetlands

More information

FURTHER TO EXECUTIVE COMMITTEE MEETING #9/11 To be held on Friday, October 14, 2011

FURTHER TO EXECUTIVE COMMITTEE MEETING #9/11 To be held on Friday, October 14, 2011 FURTHER TO EXECUTIVE COMMITTEE MEETING #9/11 To be held on Friday, October 14, 2011 FURTHER TO: Pages EX4. DELEGATIONS EX4.1 A delegation from Mr. Luca Pasquali of 5 Attercliff Court, City of Toronto,

More information

FURTHER TO EXECUTIVE COMMITTEE MEETING #10/12 To be held on Friday, December 7, 2012

FURTHER TO EXECUTIVE COMMITTEE MEETING #10/12 To be held on Friday, December 7, 2012 FURTHER TO EXECUTIVE COMMITTEE MEETING #10/12 To be held on Friday, December 7, 2012 FURTHER TO: Pages EX8.7 NEW ITEM WWK RECREATION INC. (WILD WATER KINGDOM) Deferral of 2012 Rent 118 EX10. APPLICATION

More information

Executive Committee Meeting #8/14

Executive Committee Meeting #8/14 Executive Committee Meeting #8/14 Chair: Vice Chair: Members: Gerri Lynn O'Connor Maria Augimeri Ben Cachola Ronald Chopowick Glenn De Baeremaeker Michael Di Biase Jack Heath Colleen Jordan Gloria Lindsay

More information

Executive Committee Meeting Agenda. #11/16 January 13, :30 A.M. HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN Members:

Executive Committee Meeting Agenda. #11/16 January 13, :30 A.M. HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN Members: Executive Committee Meeting Agenda #11/16 January 13, 2017 9:30 A.M. HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN Members: Chair Maria Augimeri Vice Chair Michael Di Biase Jack Ballinger David Barrow Vincent

More information

INDEX TO EXECUTIVE COMMITTEE MINUTES #9/08. Friday, November 7, 2008

INDEX TO EXECUTIVE COMMITTEE MINUTES #9/08. Friday, November 7, 2008 INDEX TO EXECUTIVE COMMITTEE MINUTES #9/08 Friday, November 7, 2008 MINUTES Minutes of Meeting #8/08, held on October 3, 2008 821 PRESENTATIONS Cape, Geoff, Executive Director, Evergreen Environmental

More information

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report Page 1 of 18 ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville Environmental Screening Report July 2011 Page 2 of 18 Table of Contents 1.0 INTRODUCTION

More information

PRESENT Maria Augimeri. Vincent Crisanti. Giorgio Mammoliti. Glenn De Baeremaeker

PRESENT Maria Augimeri. Vincent Crisanti. Giorgio Mammoliti. Glenn De Baeremaeker Executive Committee Meeting #11/16 was held at TRCA Head Office, on Friday, January 13, 2017. The Chair Maria Augimeri, called the meeting to order at 9:34 a.m. PRESENT Maria Augimeri Mike Mattos PRESENT

More information

FURTHER TO EXECUTIVE COMMITTEE #3/09 To be held Friday, May 8, 2009

FURTHER TO EXECUTIVE COMMITTEE #3/09 To be held Friday, May 8, 2009 FURTHER TO EXECUTIVE COMMITTEE #3/09 To be held Friday, May 8, 2009 Pages FURTHER TO: NEW DELEGATIONS 4. DELEGATIONS 4.1 A delegation by Ray Ristich, Ajax Resident, in regard to widening of Rossland Road

More information

Executive Committee Meeting Revised Agenda. #12/17 February 9, :30 A.M. Teleconference Conducted from Head Office Members:

Executive Committee Meeting Revised Agenda. #12/17 February 9, :30 A.M. Teleconference Conducted from Head Office Members: Executive Committee Meeting Revised Agenda #12/17 February 9, 2018 9:30 A.M. Teleconference Conducted from Head Office Members: Chair Maria Augimeri Vice Chair Jack Heath Jack Ballinger Vincent Crisanti

More information

FURTHER TO EXECUTIVE COMMITTEE MEETING #7/11 To be held on August 5, 2011

FURTHER TO EXECUTIVE COMMITTEE MEETING #7/11 To be held on August 5, 2011 FURTHER TO EXECUTIVE COMMITTEE MEETING #7/11 To be held on August 5, 2011 FURTHER TO: Pages EX8. SECTION II - ITEMS FOR EXECUTIVE ACTION EX8.2 - LISTED ON AGENDA AS REPORT TO FOLLOW EX8.2 51 DEER VALLEY

More information

INDEX TO EXECUTIVE COMMITTEE MINUTES #1/07. Friday, March 2, 2007

INDEX TO EXECUTIVE COMMITTEE MINUTES #1/07. Friday, March 2, 2007 INDEX TO EXECUTIVE COMMITTEE MINUTES #1/07 Friday, March 2, 2007 MINUTES Minutes of Meeting #12/06, held on February 2, 2007 1 GREENLANDS ACQUISITION PROJECT FOR 2006-2010 Flood Plain and Conservation

More information

INDEX TO EXECUTIVE COMMITTEE MINUTES #11/08. Friday, January 16, 2009

INDEX TO EXECUTIVE COMMITTEE MINUTES #11/08. Friday, January 16, 2009 INDEX TO EXECUTIVE COMMITTEE MINUTES #11/08 Friday, January 16, 2009 MINUTES Minutes of Meeting #10/08, held on December 12, 2008 1068 PRESENTATIONS Kendall, Peter, Executive Director, Earth Rangers Centre

More information

INDEX TO EXECUTIVE COMMITTEE MINUTES #4/05. Friday, June 3, 2005

INDEX TO EXECUTIVE COMMITTEE MINUTES #4/05. Friday, June 3, 2005 INDEX TO EXECUTIVE COMMITTEE MINUTES #4/05 Friday, June 3, 2005 MINUTES Minutes of Meeting #3/05, held on May 6, 2005 265 ONTARIO REGULATION 158 555174 Ontario Ltd. 275 1380543 Ontario Limited 300 Bell

More information

INDEX TO EXECUTIVE COMMITTEE MINUTES #1/08. Friday, March 7, 2008

INDEX TO EXECUTIVE COMMITTEE MINUTES #1/08. Friday, March 7, 2008 INDEX TO EXECUTIVE COMMITTEE MINUTES #1/08 Friday, March 7, 2008 MINUTES Minutes of Meeting #12/07 1 GREENLANDS ACQUISITION PROJECT FOR 2006-2010 Flood Plain and Conservation Component, Don River Watershed

More information

TOWN OF CALEDON Land Use Study for GTA West Corridor and Adjacent Lands!

TOWN OF CALEDON Land Use Study for GTA West Corridor and Adjacent Lands! TOWN OF CALEDON Land Use Study for GTA West Corridor and Adjacent Lands! Presentation to Council! March 10, 2015! Why are we here?! 1. The Province has now developed a short list of possible routes for

More information

INDEX TO EXECUTIVE COMMITTEE MINUTES #6/06. Friday, August 11, 2006

INDEX TO EXECUTIVE COMMITTEE MINUTES #6/06. Friday, August 11, 2006 INDEX TO EXECUTIVE COMMITTEE MINUTES #6/06 Friday, August 11, 2006 MINUTES Minutes of Meeting #5/06, held on July 7, 2006 511 ONTARIO REGULATION 166/06 830460 Ontario Limited 552, 553 1281216 Ontario Inc.

More information

Executive Committee Meeting Agenda. #9/18 November 9, :30 A.M. HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN Members:

Executive Committee Meeting Agenda. #9/18 November 9, :30 A.M. HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN Members: Executive Committee Meeting Agenda #9/18 November 9, 2018 9:30 A.M. HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN Members: Chair Maria Augimeri Jack Ballinger Vincent Crisanti Glenn De Baeremaeker Chris Fonseca

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF MAY 27, 2014

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF MAY 27, 2014 CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF MAY 27, 2014 Item 6, Report No. 21, of the Committee of the Whole, which was adopted without amendment by the Council of the City of Vaughan on May

More information

PRESENT Maria Augimeri Vincent Crisanti. Glenn De Baeremaeker. Giorgio Mammoliti

PRESENT Maria Augimeri Vincent Crisanti. Glenn De Baeremaeker. Giorgio Mammoliti Executive Committee Minutes of Meeting #11/15 November 13, 2015 Executive Committee Meeting #11/15 was held at TRCA Head Office, on Friday, November 13, 2015. The Chair Maria Augimeri, called the meeting

More information

INDEX TO EXECUTIVE COMMITTEE MINUTES #9/07. Friday, November 2, 2007

INDEX TO EXECUTIVE COMMITTEE MINUTES #9/07. Friday, November 2, 2007 INDEX TO EXECUTIVE COMMITTEE MINUTES #9/07 Friday, November 2, 2007 MINUTES Minutes of Meeting #8/07, held on October 12, 2007 924 CORRESPONDENCE O'Connor, Gerri Lynn, Chair, TRCA, and Doug Beynon, Chair,

More information

OFFICE CONSOLIDATION SECONDARY PLAN AREA 22 THE BRAMALEA SOUTH INDUSTRIAL SECONDARY PLAN

OFFICE CONSOLIDATION SECONDARY PLAN AREA 22 THE BRAMALEA SOUTH INDUSTRIAL SECONDARY PLAN OFFICE CONSOLIDATION SECONDARY PLAN AREA 22 THE BRAMALEA SOUTH INDUSTRIAL SECONDARY PLAN November 2010 EXPLANATORY NOTES (Secondary Plan Area 22) General (pertaining to all secondary plan office consolidations)

More information

PRESENT Maria Augimeri Anthony Perruzza. Vincent Crisanti Glenn De Baeremaeker. Jennifer McKelvie

PRESENT Maria Augimeri Anthony Perruzza. Vincent Crisanti Glenn De Baeremaeker. Jennifer McKelvie Executive Committee Meeting #12/17 was held at TRCA Head Office, on Friday, February 9, 2017. The Chair Maria Augimeri, called the meeting to order at 9:32 a.m. PRESENT Maria Augimeri Anthony Perruzza

More information

INDEX TO EXECUTIVE MEETING #5/04. Friday, June 4, 2004

INDEX TO EXECUTIVE MEETING #5/04. Friday, June 4, 2004 INDEX TO EXECUTIVE MEETING #5/04 Friday, June 4, 2004 MINUTES Minutes of Meeting #4/04, held on May 7, 2004 376 NATURAL HERITAGE LANDS PROTECTION AND ACQUISITION PROJECT 2001-2005 Flood Plain and Conservation

More information

THAT Site Development Application DA (Villa Charities Inc./Villa Colombo DiPoce Campus) BE APPROVED, subject to the following conditions:

THAT Site Development Application DA (Villa Charities Inc./Villa Colombo DiPoce Campus) BE APPROVED, subject to the following conditions: COMMITTEE OF THE WHOLE JUNE 16, 2003 SITE DEVELOPMENT FILE DA.02.058 VILLA CHARITIES INC./VILLA COLOMBO DIPOCE CAMPUS Recommendation The Commissioner of Planning recommends: THAT Site Development Application

More information

INDEX TO EXECUTIVE COMMITTEE MEETING #7/13. Friday, September 13, 2013

INDEX TO EXECUTIVE COMMITTEE MEETING #7/13. Friday, September 13, 2013 INDEX TO EXECUTIVE COMMITTEE MEETING #7/13 Friday, September 13, 2013 MINUTES Minutes of Meeting #6/13, held on August 9, 2013 381 GREENLANDS ACQUISITION PROJECT FOR 2011-2015 Flood Plain and Conservation

More information

THE CITY OF VAUGHAN BY-LAW BY-LAW NUMBER

THE CITY OF VAUGHAN BY-LAW BY-LAW NUMBER THE CITY OF VAUGHAN BY-LAW BY-LAW NUMBER 123-2013 A By-law to designate the whole of the City of Vaughan as a Site Plan Control Area, and to adopt site development guidelines and rules of procedure for

More information

Executive Committee Meeting Revised Agenda. #2/18 April 6, :30 A.M. HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN Members:

Executive Committee Meeting Revised Agenda. #2/18 April 6, :30 A.M. HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN Members: Executive Committee Meeting Revised Agenda #2/18 April 6, 2018 9:30 A.M. HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN Members: Chair Maria Augimeri Vice Chair Jack Heath Jack Ballinger Vincent Crisanti Glenn

More information

SPECIAL COMMITTEE OF THE WHOLE DECEMBER 9, 2002 BLOCK 57/58 WEST BLOCK PLAN BLOCK PLAN FILE BL.57/58W.99 HUNTINGTON BUSINESS PARK LAND OWNERS

SPECIAL COMMITTEE OF THE WHOLE DECEMBER 9, 2002 BLOCK 57/58 WEST BLOCK PLAN BLOCK PLAN FILE BL.57/58W.99 HUNTINGTON BUSINESS PARK LAND OWNERS SPECIAL COMMITTEE OF THE WHOLE DECEMBER 9, 2002 BLOCK 57/58 WEST BLOCK PLAN BLOCK PLAN FILE BL.57/58W.99 HUNTINGTON BUSINESS PARK LAND OWNERS Recommendation The Commissioner of Planning recommends: THAT

More information

12 AMENDMENT NO. 149, TOWN OF MARKHAM HIGHWAY 404 NORTH SECONDARY PLAN

12 AMENDMENT NO. 149, TOWN OF MARKHAM HIGHWAY 404 NORTH SECONDARY PLAN 12 AMENDMENT NO. 149, TOWN OF MARKHAM HIGHWAY 404 NORTH SECONDARY PLAN The Planning and Economic Development Committee recommends the adoption of the recommendation contained in the following report August

More information

A delegation from Ms. Carmen Diges of 106 Banbury Road, Toronto, in regard to item EX7.1 - Hearing Report.

A delegation from Ms. Carmen Diges of 106 Banbury Road, Toronto, in regard to item EX7.1 - Hearing Report. FURTHER TO EXECUTIVE COMMITTEE MEETING #3/10 To be held on Friday, May 7, 2010 FURTHER TO: Pages EX4. DELEGATIONS EX4.2 A delegation from Ms. Carmen Diges of 106 Banbury Road, Toronto, in regard to item

More information

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED 9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO. 631 - BOCA EAST INVESTMENTS LIMITED The Planning and Economic Development Committee recommends the adoption of the recommendations contained in the following

More information

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01 City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01 July 27, 2009 TABLE OF CONTENTS 1.0 Introduction... 1 1.1 Plan Area Location & Context... 1 1.2 Ownership

More information

INDEX TO EXECUTIVE COMMITTEE MINUTES #10/08. Friday, December 12, 2008

INDEX TO EXECUTIVE COMMITTEE MINUTES #10/08. Friday, December 12, 2008 INDEX TO EXECUTIVE COMMITTEE MINUTES #10/08 Friday, December 12, 2008 MINUTES Minutes of Meeting #9/08, held on November 7, 2008 955 PRESENTATIONS Soknacki, David, Chair of the Board of Directors, Parc

More information

FURTHER TO EXECUTIVE COMMITTEE #3/05 To be held Friday, May 6, 2005

FURTHER TO EXECUTIVE COMMITTEE #3/05 To be held Friday, May 6, 2005 FURTHER TO EXECUTIVE COMMITTEE #3/05 To be held Friday, May 6, 2005 Pages 7. SECTION I - ITEMS FOR AUTHORITY ACTION LISTED ON AGENDA AS REPORT TO FOLLOW 7.12 LAKE ONTARIO RESOURCES IMPROVEMENT OPPORTUNITY

More information

INDEX TO EXECUTIVE COMMITTEE MEETING #4/13. Friday, June 7, 2013

INDEX TO EXECUTIVE COMMITTEE MEETING #4/13. Friday, June 7, 2013 INDEX TO EXECUTIVE COMMITTEE MEETING #4/13 Friday, June 7, 2013 MINUTES Minutes of Meeting #3/13, held on May 10, 2013 192 GREENLANDS ACQUISITION PROJECT 2011-2015 Flood Plain and Conservation Component,

More information

INDEX TO EXECUTIVE COMMITTEE MINUTES #8/09. Friday, October 9, 2009

INDEX TO EXECUTIVE COMMITTEE MINUTES #8/09. Friday, October 9, 2009 INDEX TO EXECUTIVE COMMITTEE MINUTES #8/09 Friday, October 9, 2009 MINUTES Minutes of Meeting #7/09, held on September 11, 2009 871 GREENLANDS ACQUISITION PROJECT FOR 2006-2010 Flood Plain and Conservation

More information

STAFF REPORT. December 20, North York Community Council. Director, Community Planning, North York District

STAFF REPORT. December 20, North York Community Council. Director, Community Planning, North York District STAFF REPORT December 20, 2005 To: From: Subject: North York Community Council Director, Community Planning, North York District Preliminary Report Application to Amend the Official Plan and Zoning By-law

More information

HUNTSVILLE PHYSICAL SERVICES DEPARTMENT

HUNTSVILLE PHYSICAL SERVICES DEPARTMENT HUNTSVILLE PHYSICAL SERVICES DEPARTMENT URBAN DEVELOPMENT SITE PLAN CONTROL DRAWING DESIGN GUIDE April, 2000 (Revised June, 2003) TABLE OF CONTENTS Part A. General Information Page 1 Part B. Site Servicing

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF FEBRUARY 16, 2016

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF FEBRUARY 16, 2016 CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF FEBRUARY 16, 2016 Item 6, Report No. 7, of the Committee of the Whole, which was adopted without amendment by the Council of the City of Vaughan

More information

10 Park Lawn Rd - Zoning Amendment Application- Preliminary Report

10 Park Lawn Rd - Zoning Amendment Application- Preliminary Report STAFF REPORT ACTION REQUIRED 10 Park Lawn Rd - Zoning Amendment Application- Preliminary Report Date: March 9, 2012 To: From: Wards: Reference Number: Etobicoke York Community Council Director, Community

More information

TRCA Roles and Responsibilities in Planning and Development

TRCA Roles and Responsibilities in Planning and Development TRCA Roles and Responsibilities in Planning and Development Regional Watershed Alliance November 14, 2018 Laurie Nelson, MCIP, RPP Associate Director, Planning and Policy Outline Roles and Legislation

More information

INDEX TO EXECUTIVE COMMITTEE MEETING #1/13. Friday, March 1, 2013

INDEX TO EXECUTIVE COMMITTEE MEETING #1/13. Friday, March 1, 2013 INDEX TO EXECUTIVE COMMITTEE MEETING #1/13 Friday, March 1, 2013 MINUTES Minutes of Meeting #12/12, held on February 1, 2013 1 GREENLANDS ACQUISITION PROJECT FOR 2011-2015 Flood Plain and Conservation

More information

Director, Community Planning, Etobicoke York District

Director, Community Planning, Etobicoke York District STAFF REPORT April 25, 2006 To: From: Subject: Etobicoke York Community Council Director, Community Planning, Etobicoke York District Refusal Report Rezoning Application 04 203855 WET 07 OZ Plan of Subdivision

More information

Welcome. Date: Thursday March 2, 2017 Time: 6:30 p.m. 9:00 p.m. Location: Woodview School Gym, 69 Flatt Road, Burlington Presentation Time: 7:00 p.m.

Welcome. Date: Thursday March 2, 2017 Time: 6:30 p.m. 9:00 p.m. Location: Woodview School Gym, 69 Flatt Road, Burlington Presentation Time: 7:00 p.m. Welcome Public Information Centre No.2 City of Burlington, City of Hamilton, Region of Halton Waterdown Road Widening Detailed Design Craven Avenue to Mountain Brow Road Date: Thursday March 2, 2017 Time:

More information

Highway 427 Industrial Secondary Plan Area 47 Schedule C Class Environmental Assessment For Arterial Roadways

Highway 427 Industrial Secondary Plan Area 47 Schedule C Class Environmental Assessment For Arterial Roadways Welcome to Pubic Information Centre #1 Highway 427 Industrial Secondary Plan Area 47 Schedule C Class Environmental Assessment For Arterial Roadways Welcome to Open House # 1 Tonight, we invite you to.

More information

Executive Committee Meeting Revised Agenda. #9/17 November 3, :30 A.M. HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN Members:

Executive Committee Meeting Revised Agenda. #9/17 November 3, :30 A.M. HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN Members: Executive Committee Meeting Revised Agenda #9/17 November 3, 2017 9:30 A.M. HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN Members: Chair Maria Augimeri Vice Chair Jack Heath Jack Ballinger Vincent Crisanti

More information

2900 Steeles Avenue East at Don Mills Road in the Town of Markham

2900 Steeles Avenue East at Don Mills Road in the Town of Markham STAFF REPORT INFORMATION ONLY 2900 Steeles Avenue East at Don Mills Road in the Town of Markham Date: January 23, 2008 To: From: Wards: Reference Number: North York Community Council Director, Community

More information

Executive Committee Meeting Revised Agenda. #5/17 July 14, :30 A.M. HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN Members:

Executive Committee Meeting Revised Agenda. #5/17 July 14, :30 A.M. HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN Members: Executive Committee Meeting Revised Agenda #5/17 July 14, 2017 9:30 A.M. HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN Members: Chair Maria Augimeri Vice Chair Jack Heath Jack Ballinger Vincent Crisanti Glenn

More information

INDEX TO EXECUTIVE COMMITTEE MEETING #7/12. Friday, September 7, 2012

INDEX TO EXECUTIVE COMMITTEE MEETING #7/12. Friday, September 7, 2012 INDEX TO EXECUTIVE COMMITTEE MEETING #7/12 Friday, September 7, 2012 MINUTES Minutes of Meeting #6/12, held on August 10, 2012 442 CORRESPONDENCE A letter dated September 6, 2012 from Ms. Danielle Chin,

More information

Staff Report for Committee of the Whole Meeting

Staff Report for Committee of the Whole Meeting Agenda Item 26 Staff Report for Committee of the Whole Meeting Department: Division: Subject: Planning and Regulatory Services Development Planning Request for Approval Official Plan Amendment, Zoning

More information

Paul D. Ralph, BES, RPP, MCIP, Commissioner, Development Services Department. Proposed Storm Water Pond Maintenance Fee

Paul D. Ralph, BES, RPP, MCIP, Commissioner, Development Services Department. Proposed Storm Water Pond Maintenance Fee Public Report To: From: Report Number: Development Services Committee Paul D. Ralph, BES, RPP, MCIP, Commissioner, Development Services Department DS-16-211 Date of Report: December 1, 2016 Date of Meeting:

More information

INDEX TO EXECUTIVE COMMITTEE MEETING #7/10. Friday, September 10, 2010

INDEX TO EXECUTIVE COMMITTEE MEETING #7/10. Friday, September 10, 2010 INDEX TO EXECUTIVE COMMITTEE MEETING #7/10 Friday, September 10, 2010 MINUTES Minutes of Meeting #6/10, held on August 6, 2010 373 HEARING REPORT Ontario Khalsa Darbar Inc., 7080 Dixie Road, City of Mississauga

More information

SPECIAL COMMITTEE OF THE WHOLE DECEMBER 9, 2002 BLOCK 12 BLOCK PLAN FILE BL CASTAN BATHURST TESTON CORPORATION ET AL PRELIMINARY REPORT

SPECIAL COMMITTEE OF THE WHOLE DECEMBER 9, 2002 BLOCK 12 BLOCK PLAN FILE BL CASTAN BATHURST TESTON CORPORATION ET AL PRELIMINARY REPORT SPECIAL COMMITTEE OF THE WHOLE DECEMBER 9, 2002 BLOCK 12 BLOCK PLAN FILE BL.12.99 CASTAN BATHURST TESTON CORPORATION ET AL PRELIMINARY REPORT Recommendation The Commissioner of Planning recommends: THAT

More information

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT PUBLIC INFORMATION CENTRE Vaughan Metropolitan Centre (VMC) Black Creek Renewal Wednesday, May 10, 2017 6:00 p.m. to 8:00 p.m. Add photo Project Management, Environmental Assessment, Stormwater Management

More information

INDEX TO EXECUTIVE COMMITTEE MINUTES #11/06. Friday, January 19, 2007

INDEX TO EXECUTIVE COMMITTEE MINUTES #11/06. Friday, January 19, 2007 INDEX TO EXECUTIVE COMMITTEE MINUTES #11/06 Friday, January 19, 2007 MINUTES Minutes of Meeting #10/06, held on December 1, 2006 974 GREENLANDS ACQUISITION PROJECT FOR 2006-2010 Flood Plain and Conservation

More information

Northeast Anthony Henday Drive Manning Freeway to Whitemud Drive Welcome to this Construction Information Session

Northeast Anthony Henday Drive Manning Freeway to Whitemud Drive Welcome to this Construction Information Session Manning Freeway to Whitemud Drive Welcome to this Construction Information Session Purpose To inform interested residents and businesses about the plans accommodation. Background: The Government of Alberta

More information

Red Hill Valley Project More Than A Road October 16, 2006

Red Hill Valley Project More Than A Road October 16, 2006 Red Hill Valley Project Presented By: More Than A Road October 16, 2006 September, 2007 Gerry Davis, C.M.A., Senior Director, Capital Planning and Implementation Division Public Works Department City of

More information

Heritage Markham Committee Meeting City of Markham

Heritage Markham Committee Meeting City of Markham Heritage Markham Committee Meeting City of Markham Council Chamber, Markham Civic Centre Members Councillor Colin Campbell Judith Dawson Graham Dewar Anthony Farr Councillor Don Hamilton David Johnston

More information

Brampton. Secondary Plan. Review. Bram West. A New Direction in Planning & Public Consultation

Brampton. Secondary Plan. Review. Bram West. A New Direction in Planning & Public Consultation Brampton Bram West Secondary Plan Review A New Direction in Planning & Public Consultation Introduction The Bram West Secondary Plan Review offers an important opportunity for the community to define a

More information

Better Cycling. The City will update the cycling master plan (London ON Bikes) based on the approved BRT network.

Better Cycling. The City will update the cycling master plan (London ON Bikes) based on the approved BRT network. Better Cycling Dedicated bike facilities will be constructed along BRT corridors where space is available. Nearby bike routes will also be upgraded to ensure a complete network is available for cyclists.

More information

INDEX TO EXECUTIVE COMMITTEE MEETING #3/10. Friday, May 7, 2010

INDEX TO EXECUTIVE COMMITTEE MEETING #3/10. Friday, May 7, 2010 INDEX TO EXECUTIVE COMMITTEE MEETING #3/10 Friday, May 7, 2010 MINUTES Minutes of Meeting #2/10, held on April 9, 2010 85 DELEGATIONS Carbone, Rose and Michael Di Biase re: Request for Disposal (109 Autumn

More information

THE REGIONAL MUNICIPALITY OF YORK BY-LAW NO. OP

THE REGIONAL MUNICIPALITY OF YORK BY-LAW NO. OP THE REGIONAL MUNICIPALITY OF YORK BILL NO. 93 BY-LAW NO. OP-0041-2007-090 A by-law to adopt Amendment 54 to the Official Plan for The Regional Municipality of York The Council of The Regional Municipality

More information

TORONTO TRANSIT COMMISSION AND THE REGIONAL MUNICIPALITY OF YORK

TORONTO TRANSIT COMMISSION AND THE REGIONAL MUNICIPALITY OF YORK TORONTO TRANSIT COMMISSION AND THE REGIONAL MUNICIPALITY OF YORK NOTICE OF PREPARATION OF AN ADDENDUM REPORT TO THE HIGHWAY 7 CORRIDOR AND VAUGHAN NORTH-SOUTH LINK ENVIRONMENTAL ASSESSMENT & RESPONSE TO

More information

SUBDIVISON & ZONING BY-LAW AMENDMENT

SUBDIVISON & ZONING BY-LAW AMENDMENT RICHMOND WEST SUBDIVISON & ZONING BY-LAW AMENDMENT FEBRUARY 2013 APPLICATION INFORMATION Applications: Proposed Plan of Subdivision and Zoning By Law Amendment. Site Address: 6335 and 6350 Perth Street.

More information

13. VANDORF-PRESTON LAKE SECONDARY PLAN 13.1 INTRODUCTION

13. VANDORF-PRESTON LAKE SECONDARY PLAN 13.1 INTRODUCTION 13. VANDORF-PRESTON LAKE SECONDARY PLAN 13.1.1 Purpose 13.1 INTRODUCTION The Vandorf-Preston Lake Secondary Plan establishes the principles, objectives and general policies, as well as specific strategies

More information

City of Petersburg, VA Stormwater Utility Frequently Asked Questions

City of Petersburg, VA Stormwater Utility Frequently Asked Questions Q. What is stormwater runoff? A. Stormwater runoff is the water that flows off roofs, driveways, parking lots, streets and other hard surfaces during rain storms. Stormwater runoff is also the rain that

More information

APPENDIX F: EXTERNAL APPROVALS

APPENDIX F: EXTERNAL APPROVALS 1.0 RESPONSIBILITIES When the City is constructing the Park or Open Space Development lands (OPTION I), after the subdivision construction process is completed by the Developer, Open Space Development

More information

PRESENT Maria Augimeri. Vincent Crisanti Glenn De Baeremaeker. Giorgio Mammoliti

PRESENT Maria Augimeri. Vincent Crisanti Glenn De Baeremaeker. Giorgio Mammoliti Executive Committee Meeting #14/15 was held at TRCA Head Office, on Friday, February 5, 2016. The Chair Maria Augimeri, called the meeting to order at 9:37 a.m. PRESENT Maria Augimeri Michael Di Biase

More information

Humber Bay Shores Precinct Plan Final Report

Humber Bay Shores Precinct Plan Final Report STAFF REPORT ACTION REQUIRED Humber Bay Shores Precinct Plan Final Report Date: May 21, 2010 To: From: Wards: Reference Number: Etobicoke York Community Council Director, Community Planning, Etobicoke

More information

7 HIGHWAY 7 CORRIDOR AND VAUGHAN N-S LINK ENVIRONMENTAL ASSESSMENT RECOMMENDED ALIGNMENT

7 HIGHWAY 7 CORRIDOR AND VAUGHAN N-S LINK ENVIRONMENTAL ASSESSMENT RECOMMENDED ALIGNMENT 7 HIGHWAY 7 CORRIDOR AND VAUGHAN N-S LINK ENVIRONMENTAL ASSESSMENT RECOMMENDED ALIGNMENT The Rapid Transit Public/Private Partnership Steering Committee recommends the adoption of the recommendations contained

More information

TERRESTRIAL NATURAL HERITAGE SYSTEM STRATEGY APPENDIX F: MODEL POLICIES FOR THE IMPLEMENTATION OF THE TARGET TERRESTRIAL NATURAL HERITAGE SYSTEM

TERRESTRIAL NATURAL HERITAGE SYSTEM STRATEGY APPENDIX F: MODEL POLICIES FOR THE IMPLEMENTATION OF THE TARGET TERRESTRIAL NATURAL HERITAGE SYSTEM TERRESTRIAL NATURAL HERITAGE SYSTEM STRATEGY APPENDIX F: MODEL POLICIES FOR THE IMPLEMENTATION OF THE TARGET TERRESTRIAL NATURAL HERITAGE SYSTEM C H A P T E R 1 M O D E L P O L I C I E S F O R I M P L

More information

Rowntree Mill Road Zoning and Plan of Subdivision Applications Final Report

Rowntree Mill Road Zoning and Plan of Subdivision Applications Final Report STAFF REPORT ACTION REQUIRED 148-156 Rowntree Mill Road Zoning and Plan of Subdivision Applications Final Report Date: March 13, 2007 To: From: Wards: Reference Number: Etobicoke York Community Council

More information

Ashbridges Bay Erosion and Sediment Control Project

Ashbridges Bay Erosion and Sediment Control Project Ashbridges Bay Erosion and Sediment Control Project Project Brief Overview Toronto and Region Conservation Authority, in partnership with the City of Toronto, intends to carry out remedial erosion control

More information

4208, 4210 and 4214 Dundas Street West Official Plan and Zoning By-law Amendment Application Final Report

4208, 4210 and 4214 Dundas Street West Official Plan and Zoning By-law Amendment Application Final Report STAFF REPORT ACTION REQUIRED 4208, 4210 and 4214 Dundas Street West Official Plan and Zoning By-law Amendment Application Final Report Date: October 27, 2016 To: From: Wards: Reference Number: Etobicoke

More information

East Whiteland Township Current Land Development Projects

East Whiteland Township Current Land Development Projects Current Land Development Projects A. Lincoln Court (Lancaster Avenue / Malin Road) Demolish existing 2 story brick and stucco structure Build onto existing 1 story masonry shopping center to add 8 new

More information

CITY OF KITCHENER CONDITIONS REQUIRED FOR ISSUANCE OF SITE PLAN APPROVAL

CITY OF KITCHENER CONDITIONS REQUIRED FOR ISSUANCE OF SITE PLAN APPROVAL CITY OF KITCHENER CONDITIONS REQUIRED FOR ISSUANCE OF SITE PLAN APPROVAL The following is a list of conditions requiring completion to the City s Satisfaction prior to Site Plan Approval being granted

More information

Message from York Regional Council

Message from York Regional Council Tom Taylor Town of Newmarket Tim Jones Town of Aurora James Young Town of East Gwillimbury Robert Grossi Town of Georgina Danny Wheeler Town of Georgina Margaret Black Township of King A.J. (Tony) Van

More information

1. Recommendations. It is recommended that:

1. Recommendations. It is recommended that: Clause 11 in Report No. 3 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on February 18, 2016. 11 Acquisition of Land

More information

2. Analysis. DRAFT Gerald Richards & Pleasantview Park Master Plan

2. Analysis. DRAFT Gerald Richards & Pleasantview Park Master Plan DRAFT Gerald Richards & Pleasantview Park Master Plan 19 Historic Features According to the National Register of Historic Places and the National Historic Landmarks Program, there is nothing of national

More information

Edward R. Sajecki Commissioner of Planning and Building. Land Use Review- Former Parkway Belt West Lands- Fieldgate Drive and Audubon Boulevard

Edward R. Sajecki Commissioner of Planning and Building. Land Use Review- Former Parkway Belt West Lands- Fieldgate Drive and Audubon Boulevard Corporate Report Clerk s Files Originator s Files CD.04.FOR DATE: November 15, 2011 TO: FROM: SUBJECT: Chair and Members of Planning and Development Committee Meeting Date: December 5, 2011 Edward R. Sajecki

More information

WELCOME TO OPEN HOUSE TWO November 28, 2018

WELCOME TO OPEN HOUSE TWO November 28, 2018 Langstaff Road Weston Road to Highway 7 Class Environmental Assessment Study WELCOME TO OPEN HOUSE TWO November 28, 2018 Please sign in and join our mailing list Study Overview York Region is conducting

More information

4155 Yonge Street Official Plan Amendment and Rezoning Application Preliminary Report

4155 Yonge Street Official Plan Amendment and Rezoning Application Preliminary Report STAFF REPORT ACTION REQUIRED 4155 Yonge Street Official Plan Amendment and Rezoning Application Preliminary Report Date: May 5, 2011 To: From: Wards: Reference Number: North York Community Council Director,

More information

Ontario Municipal Board Commission des affaires municipales de l'ontario

Ontario Municipal Board Commission des affaires municipales de l'ontario PL150128 Ontario Municipal Board Commission des affaires municipales de l'ontario PROCEEDING COMMENCED UNDER subsection 34(11) of the Planning Act, R.S.O. 1990, c. P. 13, as amended Applicant and Appellant:

More information

Slope Stability Evaluation and Determination of Location of Long Term Stable Top of Slope 233 to 245 Dunlop Street West, Barrie, Ontario

Slope Stability Evaluation and Determination of Location of Long Term Stable Top of Slope 233 to 245 Dunlop Street West, Barrie, Ontario geotechnics construction materials testing Ref No.: 17-048 Trinity Consultants Ontario Inc. 885 Don Mills Road, Suite 106 Toronto, ON. M3C 1V9 Attn: Brian J. Schuyler, C.E.T., Senior Consultant Subject:

More information