1 WELCOME Pulic Informtion Centre No.1 Brm West Prkwy From Finncil Drive to Heritge Rod nd Finncil Drive From Heritge Rod to Winston Churchill Boulevrd Municipl Clss Environmentl Assessment (Schedule C) June 27, :30 p.m. to 8:30 p.m. Plese sign in so tht we cn keep you updted on the study Brm West Prkwy (Finncil Drive to Heritge Rod) nd Finncil Drive (Heritge Rod to Winston Churchill Boulevrd)

2 Purpose of Pulic Informtion Centre No. 1 This is the first of two Pulic Informtion Centres (PICs) to e held during the study to llow the pulic n opportunity to review nd comment on project detils. The PIC hs een rrnged to: Introduce the study to the pulic; Provide ckground context nd informtion; Present the need nd justifiction for the extension of Finncil Drive from Heritge Rod to Winston Churchill Boulevrd; Present lterntive plnning solutions nd identify the preferred lterntive plnning solution for Finncil Drive; Present the process for ssessing nd evluting lignment lterntives for Brm West Prkwy; Identify the preliminry preferred lterntive lignment for Brm West Prkwy; Otin pulic input nd comments; nd Identify the next steps in the process, including the preliminry design phse. Brm West Prkwy (Finncil Drive to Heritge Rod) nd Finncil Drive (Heritge Rod to Winston Churchill Boulevrd)

3 Study Overview The purpose of this study is to conduct Clss Environment Assessment (EA) for the extension of Finncil Drive from Heritge Rod to Winston Churchill Boulevrd nd new north-south rteril rod, Brm West Prkwy, from Heritge Rod to the extended Finncil Drive. Phses 1 nd 2 of the Municipl Clss Environmentl Assessment process for Brm West Prkwy were crried out during the Hlton-Peel Boundry Are Trnsporttion Study (HPBATS) (2010): HPBATS ws joint study to develop regionl trnsporttion strtegy to ddress the needs of the Regions of Hlton nd Peel, the City of Brmpton nd the Towns of Cledon nd Hlton Hills. The strtegy included the north-south rteril rod Brm West Prkwy s prt of lrger north-south trnsporttion corridor. As Trnsporttion Mster Pln, HPBATS serves s direct input into susequent Clss EA requirements to implement the individul projects tht mke up the recommended trnsporttion strtegy nd network. Therefore, the min ojectives of this study re to: Complete Phses 3 nd 4 of the Municipl Clss EA process for Brm West Prkwy; Complete Phses 1 to 4 of the Municipl Clss EA process for Finncil Drive; Consider resonle rnge of lterntives; Consider the impcts to ll spects of the environment through systemtic ssessment nd evlution of lterntives; Develop preliminry preferred designs; nd Encourge prticiption from the pulic nd potentilly ffected prties erly in nd throughout the process. Brm West Prkwy (Finncil Drive to Heritge Rod) nd Finncil Drive (Heritge Rod to Winston Churchill Boulevrd)

4 The Municipl Clss EA Process The Municipl Clss EA process enles the plnning nd implementtion of municipl infrstructure projects to e undertken in ccordnce with n pproved procedure, giving due regrd to the need to protect the environment nd minimize negtive effects. The Municipl Clss EA process is depicted elow: Brm West Prkwy (Finncil Drive to Heritge Rod) nd Finncil Drive (Heritge Rod to Winston Churchill Boulevrd)

5 Brm West Prkwy Finncil Drive The Clss EA Process For This Study This study is following the process of Schedule C requirements of the Municipl Clss EA which will complete Phses 3 nd 4 for Brm West Prkwy nd Phses 1 to 4 for Finncil Drive. Phse 1: Prolem/Opportunity Phse 2: Alterntive Solutions Phses 1 nd 2 of the Brm West Prkwy were completed through HPBATS, therefore our current Study will strt t Phse 3 for Brm West Prkwy. Phse 3: Alterntive Designs PIC No. 1 We re here PIC No. 2 (fll 2012) Phse 4: Environmentl Study Report 30 Dy Pulic Review (spring 2013) Phse 5: Implementtion Brm West Prkwy (Finncil Drive to Heritge Rod) nd Finncil Drive (Heritge Rod to Winston Churchill Boulevrd)

6 Pulic Consulttion Pulic input is n essentil component of the decision-mking process. Opportunities to provide your input re not limited to forml consulttion events such s this PIC, or other milestones. You cn provide input to the study tem t ny point throughout the study. The Study Tem recognizes tht there re mny different interests within our Study Are. To provide ll ffected stkeholders with n opportunity to ecome involved in our study, our Pulic Consulttion progrm includes outrech nd inviting feedck from the: Stkeholder Group (directly ffected lndowners within the Study Are); Technicl Agency Committee (including Ministry of Nturl Resources, Credit Vlley Conservtion, municiplities etc.); Utilities (e.g., TrnsCnd Pipeline, Enridge, Hydro One); nd the Generl pulic. Brm West Prkwy (Finncil Drive to Heritge Rod) nd Finncil Drive (Heritge Rod to Winston Churchill Boulevrd)

7 Bckground Trnsporttion nd Trnsit Mster Pln Trnsporttion nd Trnsit Mster Pln (TTMP) (2009) The TTMP sets out policies nd progrms to support the long-term trnsporttion vision for the City of Brmpton. In terms of specific policies relted to our Study, the TTMP: Identifies north-south trnsporttion corridor (NSTC) from Heritge Rod to Myfield Rod with 407 ETR interchnge etween Hwy 401 nd Mississug Rod. Recognizes tht the section of the NSTC etween 407 ETR nd Emleton Rod, known s Brm West Prkwy, is required to support the full development in the Brm West Secondry Pln. Recommends Brm West Prkwy e constructed s n initil 6 lne cross section from south of Emleton Rod to the proposed 407 ETR interchnge nd 4-lne cross section from the proposed 407 ETR interchnge to Heritge Rod, in the south y Recommends 4 lne extension of Finncil Drive from Steeles Avenue to Winston Churchill Boulevrd y Other studies crried out in ccordnce with the TTMP: Finncil Drive Clss EA, from Mississug Rod to Heritge Rod (prt of the Clss EA for Brm West Block 40-3) (MMM Group 2009) Finncil Drive Clss EA, from Steeles Avenue to Mississug Rod (prt of the Clss EA for Brm West Block 40-3) (AECOM 2008) Brm West Prkwy (Finncil Drive to Heritge Rod) nd Finncil Drive (Heritge Rod to Winston Churchill Boulevrd)

8 Bckground Hlton-Peel Boundry Are Trnsporttion Study Hlton-Peel Boundry Are Trnsporttion Study (HPBATS) (2010) Joint study to develop regionl trnsporttion strtegy to ddress the needs of the Regions of Hlton nd Peel, the City of Brmpton nd the Towns of Cledon nd Hlton Hills. The strtegy included the north-south rteril rod Brm West Prkwy. As Trnsporttion Mster Pln, the study serves s direct input into susequent Clss EA requirements to implement the individul projects tht mke up the recommended trnsporttion strtegy nd network. Brm West Prkwy (Finncil Drive to Heritge Rod) nd Finncil Drive (Heritge Rod to Winston Churchill Boulevrd)

9 Bckground GTA West Individul EA GTA West An Individul Environmentl Assessment Study currently eing undertken y the Ontrio Ministry of Trnsporttion to ssess interregionl trnsporttion needs. Considers the potentil future extension of Brm West Prkwy north from Finncil Drive to connect with future GTA West Highwy. The GTA West Corridor hs shifted south since the preprtion of HPBATS nd s such, potentil future connection from Brm West Prkwy to GTA West supersedes the previously defined Hlton-Peel Freewy Corridor identified in HPBATS. Brm West Prkwy (Finncil Drive to Heritge Rod) nd Finncil Drive (Heritge Rod to Winston Churchill Boulevrd)

10 Bckground Officil Pln City of Brmpton Officil Pln (2006) The City of Brmpton's Officil Pln (2006) projected significnt growth in popultion nd employment in next 20 yers Brmpton is the 9th lrgest nd 3rd fstest growing city in Cnd, t n verge nnul growth rte of 8.4% ( ) Yer Popultion Employment Housing , , , , , ,000 Source: Brmpton SGU Level Forecsts (Hemson Consulting Ltd., 2009) , , ,600 A significnt portion of the City s overll growth will occur in the west Brmpton Secondry Pln Ares of: Brm West (Secondry Pln Are 40) Huttonville (29) Huttonville North (52) Mount Plesnt (51) Mount Plesnt West (53) Yer Popultion Employment ,490 5, ,970 38, ,770 67,670 Brm West Prkwy (Finncil Drive to Heritge Rod) nd Finncil Drive (Heritge Rod to Winston Churchill Boulevrd)

11 Bckground Officil Pln continued City of Brmpton Officil Pln (2006) Designtes the section of Brm West Prkwy from Steeles Avenue to Finncil Drive s the North-South Trnsporttion Corridor with n ultimte right-ofwy width of m. Designtes the section of Finncil Drive from Mississug Rod to Winston Churchill Boulevrd s collector rod with n ultimte rightof-wy of m. Brm West Prkwy Clss EA Study Brm West Prkwy (Finncil Drive to Heritge Rod) nd Finncil Drive (Heritge Rod to Winston Churchill Boulevrd)

12 Bckground Brm West Secondry Pln Brm West Secondry Pln The Brm West Pln Are covers out 6,050 cres (2,450 hectres) in south west Brmpton nd is ounded y the Credit River in the north, the City Limit to the south, Winston Churchill Boulevrd to the west nd Chingucousy Rod (Mvis Rod) to the est. The Brm West Secondry Pln (1998, OP93-70/71) identifies rod network tht includes north-south rteril rod locted etween Heritge Rod nd Winston Churchill Boulevrd (referred to s Brm West Prkwy). A Brm West Secondry Pln Review (2005) identifies corridor protection re ounded y Heritge Rod to the est, Winston Churchill Boulevrd to the west, the Credit River Vlley to the north. The Secondry Pln Review ws implemented in 2006 through OP93-270/271. These mendments were ppeled to the OMB nd since then, ll of the OP nd portions of OP hve come into force. Ongoing stkeholder concerns/ppels re primrily ssocited with Chpter 40(), etween Heritge Rod nd Winston Churchill Boulevrd, north of Steeles Avenue West. Brm West Prkwy (Finncil Drive to Heritge Rod) nd Finncil Drive (Heritge Rod to Winston Churchill Boulevrd)

13 Existing Conditions Nturl Environment Mullet Creek, Levi Creek nd Heritge Creek ( triutry of Levi Creek) re the min wtercourses within the Study Are. Levi Creek nd Heritge Creek (north of Steeles Avenue) nd the upper reches of Mullet Creek re clssified s Smll Wrmwter in the Gtewy West Suwtershed Study Updte (2008). The most dominnt fish species in these creeks re Creek Chu nd Blcknose Dce long with Brook Stickleck, Bluntnose Minnow, Fthed Minnow nd White Sucker. All re common species typiclly oserved in these types of wrm wter hitts. Levi Creek nd its min triutries re identified y the Ministry of Nturl Resources s Recovery Hitt for qutic Species t Risk nd Regulted under the Endngered Species Act (2007). Designted fetures, which re protected under numer of provincil, regionl nd locl policies include: o o o o Levi Creek Provincilly Significnt Wetlnd Complex, scttered long the riprin res of Heritge Creek nd Levi Creek; Mullet Creek wetlnds tht re considered loclly significnt (note: one of these wetlnds is no longer present on the lndscpe); Credit Vlley Conservtion Authority Regultion Limits (Ontrio Regultion 160/60); Vlleylnds nd Wtercourse Corridors, Woodlnd nd Wetlnds under the City of Brmpton Officil Pln. Due to long history of griculturl lnd use, terrestril ecosystem fetures re limited to the smll vlley systems. Riprin vegettion communities include culturl medow, medow mrsh, culturl thicket nd scttered trees. These communities re culturlly influenced, nd tend to consist of common, disturnce tolernt plnt species. Nturl environmentl fetures re depicted on the next pnel. Brm West Prkwy (Finncil Drive to Heritge Rod) nd Finncil Drive (Heritge Rod to Winston Churchill Boulevrd)

14 Existing Conditions Nturl Environment

15 Existing Conditions Socio-Economic/Culturl Socio-Economic The study re is locted within the Brm West Secondry Pln Are, n re of future community growth. Existing lnd use within the study re includes: Agriculturl opertions etween Emleton Rod, Steeles Avenue, Winston Churchill Boulevrd nd Heritge Rod; Agriculturl-Industril opertions (Mple Lodge Frms processing plnt); Rurl residentil nd commercil long Emleton Rod, Heritge Rod nd Winston Churchill Boulevrd; Employment lnds south of Steeles Avenue (Churchill Business Prk). Archeology A Stge 1 Archeologicl Assessment determined tht there re 29 registered rcheologicl sties within 1 km of the Study Are. None re locted within the re tht my e impcted y the project. The Stge 1 Archeologicl Assessment reveled tht the Study Are is within n re of high potentil for rcheologicl finds. Therefore, Stge 2 Archeologicl Assessment will e undertken once the preferred lignments for Brm West Prkwy nd Finncil Drive hve een confirmed. Culturl Heritge Five (5) properties Listed in the City of Brmpton Municipl Register of Culturl Heritge Resources One (1) property Designted under the Ontrio Heritge Act One (1) property with pending municipl heritge designtion -Mount Zion Cemetery The Town of Hlton Hills Heritge Register ws consulted. There re no listed or designted properties immeditely djcent to the study re. Socio-economic nd Heritge fetures re depicted on the next pnel. Brm West Prkwy (Finncil Drive to Heritge Rod) nd Finncil Drive (Heritge Rod to Winston Churchill Boulevrd)

16 Existing Conditions Socio-Economic/Culturl

17 Finncil Drive Need nd Justifiction A Screenline* Anlysis ws undertken for the Study Are to ssess trvel demnd nd cpcity sed on p.m. pek hour trvel demnd model projections, using future popultion nd employment growth. The nlysis indictes tht without infrstructure improvements the existing rodwys nd intersections will result in high delys nd congestion. Additionl est-west lnes will e required in order to ccommodte the growth nd the ssocited projected trffic demnd. West Screenline Yer V/C Legend: Good operting condition (V/C <= 0.85) Est Screenline Yer Congested operting condition (V/C > 0.85) V/C *A Screenline is n imginry line, or liner feture such s rod, river, ril line or municipl oundry tht is used for the purpose of evluting the cumultive trvel demnd on the rodwys crossing this feture. A Screenline comprison of projected trffic volumes to rod cpcity is sic trnsporttion plnning tool which provide n indiction of how well specific corridor/screenline is operting. The Screenline Anlysis mesures trffic volume (V) to cpcity (C) s mens of identifying prolems (congestion, dely) t intersections long the corridor. Brm West Prkwy (Finncil Drive to Heritge Rod) nd Finncil Drive (Heritge Rod to Winston Churchill Boulevrd)

18 Finncil Drive Prolem/Opportunity Sttement The City of Brmpton is experiencing high popultion nd employment growth tht will continue over the next 20 yers, nd eyond. Steeles Avenue is plnned for widening to six lnes. Even with these improvements, dditionl rodwy cpcity will still e required in the Brm West Secondry Pln to ccommodte the est-west trvel demnd growth. Emleton Rod is not identified for future widening in the TTMP due to the significnt community impcts ssocited with widening through Huttonville nd the lck of contiguous connection to the est (i.e., jog t Mississug Rod). Creting continuous connection would require new crossing of the Credit River. The trnsporttion nd trffic nlysis suggests tht the existing rodwys nd intersections will e incple of hndling the forecsted est-west trffic, leding to incresed delys nd congestion. Additionl est-west connection will e required in order to ccommodte the growth nd the ssocited projected trffic. The Finncil Drive extension to Winston Churchill Boulevrd implements the Recommended 2016 Rod Network Needs identified in the TTMP (2009). Even with other plnned rod network improvements, dditionl rod cpcity will still e required to ccommodte trvel demnd growth nticipted from development within the Brm West Secondry Pln re nd in northwest Brmpton over the next 20 yers. Brm West Prkwy (Finncil Drive to Heritge Rod) nd Finncil Drive (Heritge Rod to Winston Churchill Boulevrd)

19 Finncil Drive Alterntive Plnning Solutions Under the provisions of the Clss Environmentl Assessment process, ll resonle lterntives to the undertking require considertion. The lterntive plnning solutions eing considered re: Alterntive Solution Do Nothing Implement Trnsporttion System nd Demnd Mngement Mesures/ Improve Trnsit Service Limit Development Implement Improvements to Existing Infrstructure Extend Finncil Drive Description Mintin existing conditions. No improvements or chnges would e mde to the est-west rod network including no extension of Finncil Drive or proposed intersection with Brm West Prkwy. Reduce the numer of single occupnt vehicles during pek hours through lterntive modes of trnsporttion (trnsit, cycling, wlking), crpooling, minimizing frequency of trvel (work from home), flexile work hours. Restrict future development in the re. Undertke cpitl improvements to existing nery est-west rods including rod widening nd intersection improvements such s enhnced signl timings nd turn lnes to improve trffic opertions. Extend Finncil Drive from Heritge Rod to Winston Churchill Boulevrd in order to provide est-west trnsporttion cpcity, llevite congestion on Steeles Avenue West nd ccommodte projected future trvel demnd. Brm West Prkwy (Finncil Drive to Heritge Rod) nd Finncil Drive (Heritge Rod to Winston Churchill Boulevrd)

20 Finncil Drive Assessment of Alterntive Plnning Solutions Alterntive Solution How the Alterntive Solution Addresses the Prolem nd Opportunities Do Nothing - Does not crete the rod network system required to connect the future development of Brm West to the plnned rteril rod network. - Does not provide ny dditionl cpcity to ccommodte future trffic generted from within nd eyond Brm West. - Does not ddress dverse impcts from incresed trffic congestion. - Does not ddress Brm West Secondry Pln, the Trnsit nd Trnsporttion Mster Pln Updte (TTMP) Recommended Rod Network nd City of Brmpton Officil Pln policy. - No impcts to nturl or culturl fetures. - Does not ddress the prolem/opportunity. Implement Trnsporttion System nd Demnd Mngement Mesures/ Improve Trnsit Service Limit Development Implement Improvements to Existing Infrstructure Extend Finncil Drive - Does not crete the rod network system required to connect the future development of Brm West to the plnned rteril rod network. - Does not provide ny dditionl cpcity to ccommodte future trffic generted from within nd eyond Brm West. - Provides ccess to trnsporttion nd trnsit lterntives on existing rods to ccommodte trips generted y the development of Brm West. - Moderte nd potentilly mitigle impcts ssocited with djcent nturl fetures (for lne widening). - Positive socio-economic impcts s result of improved ccess to trnsporttion nd trnsit lterntives nd possile reduction in utomoile dependence. - On their own, these mesures do not fully ddress prolem/opportunity. - Not consistent with the Provincil Growth policy (Plces to Grow), City of Brmpton s Officil Pln policy, the Brm West Secondry Pln nd the TTMP. - Does not fully ddress the City s plnned economic growth. - Does not crete the rod network system required to connect the future development of Brm West to the plnned rteril rod network. - Provides some dditionl cpcity nd opertionl improvements to ccommodte trffic generted from the re, however, only defers the eventul need to provide dded network cpcity to support full development. - Low to moderte impcts ssocited with djcent nturl fetures (for minor rod widening). - Positive socio-economic impcts s result of minor cpcity nd opertionl improvements. - No culturl impcts. - On their own, these mesures do not fully ddress the prolem/opportunity. While improvements my offer some increses in cpcity, they simply defer the investment into creting trnsporttion network tht fully supports implementtion of the Brm West Secondry Pln. Not crried forwrd s prt of this Study ut ddressed in other inititives. - Fcilittes the cretion of trnsporttion network system required to connect the future development of Brm West to the plnned rteril rod network. - Improves est-west connections for trvel within the Brm West re. - Allevites trffic demnd on Steeles Avenue during pek hour trvel periods. - Low to moderte impcts ssocited with djcent nturl fetures. - Positive socio-economic impcts s result of improves est-west connections. - No culturl heritge impcts. - Moderte impct to griculturl lnds north of Mple Lodge Frms plnt however; no direct impcts to the plnt or its opertions. Reduces re ville for crops in the short term, however, lnd required for the new rod is designted for future industril uses. - Best ddress the prolem/opportunity nd supports the City of Brmpton s Officil Pln policy, the Brm West Secondry Pln nd the TTMP. Brm West Prkwy (Finncil Drive to Heritge Rod) nd Finncil Drive (Heritge Rod to Winston Churchill Boulevrd)

21 Finncil Drive Preferred Alterntive Plnning Solution The preferred plnning solution for Finncil Drive includes comintion of the following lterntive solutions: Extend Finncil Drive from Heritge Rod to Winston Churchill Boulevrd; Implement Trvel System nd Demnd Mngement Mesures/Trnsit Service Improvements where fesile long the corridor. The preferred plnning solution considers pedestrin fetures nd ctive trnsporttion opportunities such s wlking nd cycling. Brm West Prkwy (Finncil Drive to Heritge Rod) nd Finncil Drive (Heritge Rod to Winston Churchill Boulevrd)

22 Finncil Drive Corridor Finncil Drive, etween Heritge Rod nd Mississug Rod ws EApproved in The proposed extension of Finncil Drive will originte from the intersection of Heritge Rod nd will terminte t new intersection with Winston Churchill Boulevrd. A potentil corridor of the proposed extension of Finncil Drive is shown on the left. Brm West Prkwy (Finncil Drive to Heritge Rod) nd Finncil Drive (Heritge Rod to Winston Churchill Boulevrd)

23 Brm West Prkwy Genertion nd Evlution of Alignment Alterntives In totl, 13 lignments for the Brm West Prkwy were developed nd ssessed. The evlution of the lignments involved two stge process: Stge 1 Preferred in ech Corridor The 13 lterntive lignments were seprted into three corridor groups: West, Centrl nd Est corridors sed on where they intersect Finncil Drive. The lignment lterntives within ech group were compred, to identify preferred lignment within ech corridor. Stge 2 Preferred Overll The West, Centrl nd Est preferred lterntives were compred to ech other, to identify n overll preliminry preferred lterntive. Brm West Prkwy (Finncil Drive to Heritge Rod) nd Finncil Drive (Heritge Rod to Winston Churchill Boulevrd)

24 Brm West Prkwy Genertion nd Evlution of Alignment Alterntives continued The nlysis presented on the following pnels presents: Stge 1 : The selection of the preferred lignment within ech of the West, Centrl nd Est Corridors. Stge 2 : The comprison of the preliminry preferred lterntive from ech corridor nd the selection of the overll preliminry preferred lterntive. The two stge process, with the lignment lterntives is outlined elow: Stge 1 Identify the preferred lterntive in ech corridor Stge 2 Compre preferred lterntives in ech corridor Identify preliminry preferred ltertive Brm West Prkwy (Finncil Drive to Heritge Rod) nd Finncil Drive (Heritge Rod to Winston Churchill Boulevrd)

25 Brm West Prkwy Assessment nd Evlution Process The selection processes for the preliminry preferred lterntives included two steps: Step 1 Assessment of Alterntives The potentil enefits nd impcts of ech lterntive were ssessed ginst comprehensive set of criteri for socio-economic, culturl, nturl nd trnsporttion nd technicl fctor groups; Step 2 Evlution of Alterntives A comprtive exmintion of the dvntges nd disdvntges of the lterntives ws undertken to identify preliminry preferred lterntive. The evlution of lterntives ws crried out using the Resoned Argument method, compring differences in impcts nd providing cler rtionle for the selection of the preliminry preferred lterntive. Brm West Prkwy (Finncil Drive to Heritge Rod) nd Finncil Drive (Heritge Rod to Winston Churchill Boulevrd)

26 Brm West Prkwy Assessment nd Evlution Criteri nd Mesures An comprehensive set of criteri nd mesures were employed during the ssessment nd evlution process. The detiled list is provided on the right. Brm West Prkwy (Finncil Drive to Heritge Rod) nd Finncil Drive (Heritge Rod to Winston Churchill Boulevrd)

27 Brm West Prkwy Alignment Alterntives The Brm West Prkwy lignment lterntives within the West, Centrl nd Est Corridors re depicted elow. A summry of our nlysis is shown on the following disply ord. Detiled ssessment tles re ville for review from our Study Tem. ACEG is the preliminry preferred lterntive within the West Corridor ACEH is the preliminry preferred lterntive within the Centrl Corridor ACEI is the preliminry preferred lterntive within the Est Corridor

28 Brm West Prkwy West Alterntives Stge 1 Evlution W1 W2 W3 W4 Fctor/Criteri (ABDG) (ABEG) (ACDG) (ACEG) Evlution 1 Trnsporttion c d e f g h i Rod Geometry Interchnge Opertions Intersection Spcing Impcts on Locl Rods Impcts of 407 ETR Network Comptiility Flexiility of Future Expnsion Emergency Services Support of Alterntive Modes of Trvel In terms of rod geometry, W3 is the est with the fewest curves. All other lterntives hve similr curviliner lignments. In terms of potentil impct to 407 ETR opertions, W1 nd W2, with potentil future full interchnge my result in potentil weving concerns on 407 ETR to the west, given the reltively close proximity to the Highwy 401/407 freewy to freewy interchnge. In terms of future interchnge opertions; ll lterntives re similr for potentil Full Interchnge t 407 ETR in terms of requiring 3 utment modifictions t djcent ridges to ccommodte the speed chnge lnes nd low flexiility of future widening 407 ETR eyond the pproved 8 lnes. W1 nd W2 hve minor impcts on the existing 407 ETR SWM fcility. For potentil Prtil Interchnge t 407 ETR, W1 nd W2 re preferred ecuse they require one less utment modifiction to djcent ridges, mintin high flexiility for future widening of 407 ETR nd void impcts to the existing 407 ETR SWM fcility. All lterntives hve similr level of service nd cceptle distnces etween intersections with other rods, re comptile with the existing rodwy network, mintin or enhnce emergency services/ccess nd cn ccommodte cycling/pedestrins. Therefore, W1 nd W2 re slightly preferred over W3 nd W4. 2 Technicl Considertions c d Impcts to Utilities Degree of Design Chllenge Constructility Issues Cost W1 nd W2 (minline) require 3 crossings of TCPL, 4 crossings of Enridge nd would need to ccommodte n ccess rod to the Enridge vlve sttion locted south of 407 ETR. In contrst, W3 nd W4 require 1 crossing of TCPL nd 2 crossings of Enridge nd will not impct the Enridge vlve sttion. W3 nd W4 preferred over W1 nd W2 ecuse they require fewer crossings of TCPL nd Enridge, void potentil conflict with Enridge vlve sttion. All lterntives will potentilly conflict with two EA-pproved 230kV hydro lines plnned for south of 407 ETR, within the Prkwy Belt. Creful considertion of potentil mitigtion mesures will need to e undertken regrdless of the preferred lterntive. W2 nd W4 hve more desirle loction reltive to the Enridge pipeline ROW tht will fcilitte ccess to the pipeline nd void triggering potentil future Clss chnges when surrounding lnd use trnsitions. Cost of constructility is considered similr for ll lterntives. Slightly higher costs my e ttriuted to W1 nd W2 given the dditionl utilities crossings however, these costs re firly minor when considered in the context of the overll costs of the new rod nd proposed interchnge. Therefore W3 nd W4 re preferred over W1 nd W2. 3 Nturl Environment 3.1 Aqutic Ecosystems Fish nd Fish Hitt All lterntives will require 3 wtercourse crossings: triutry of Mullet Creek, Mullet Creek nd Heritge Creek South. For the purposes of comprison, the crossings of the Mullet Creek triutry re considered similr for ll lterntives. The W1 nd W2 crossings of Mullet Creek re locted in n lredy distured re t Steeles Avenue. However, Mullet Creek crossing for W3 nd W4 is in n re lredy plnned for relignment. There my e some dvntges to utilizing the crossing loction t Steeles Avenue nd voiding newly restored rech downstrem however, in terms of impcts to fish nd fish hitt, ll lterntives re considered to hve similr low impcts to Mullet Creek. Heritge Creek South is considered more sensitive given tht it is Regulted s Recovery Hitt for qutic species t risk nd therefore this wtercourse crossing fctors more highly in the evlution. W1 nd W3 hve less desirle crossing loctions on Heritge Creek South since they hve slightly more olique crossing ngle nd will enclose more strem length (or require more extensive chnnel relignment). While W2 nd W4 my lso require some modifictions to loclized strem hitt, it is nticipted tht these impcts will e lower thn W1 nd W2 ecuse crossing re t perpendiculr ngle with less chnnel length impcted. Therefore, W2 nd W4 re preferred over W1 nd W Terrestril Ecosystems Designted Fetures Uplnd nd Wetlnd Vegettion c Wildlife nd Hitt 3.3 Surfce Wter nd Groundwter Fluvil Geomorphology Surfce Wter (including fluvil geomorphology, floodplin storge/flood conveynce nd stormwter mngement) c Groundwter 3.4 Property Wste & Contmintion Effect on operting nd closed wste disposl sites, known contminted sites nd potentilly contminted sites Nturl Environment Summry 4 Socio-Economic nd Lnd Use 4.1 Property nd Access Impcts to Mple Lodge Frms (numer of properties impcted, impcts to ccess, seprtion distnce from plnt) Impcts to other properties (numer of properties impcted, impcts to residences, impcts to commercil/industril res nd usinesses) c Impct to ccess 4.2 Community Effects There re no Ares of Nturl nd Scientific Interest (ANSI) or Environmentlly Sensitive/Significnt Ares (ESAs) impcted y ny of the lterntives. All lterntives cross vlleys designted s Greenlnds, in two loctions; Mullet Creek nd Heritge Creek South. W1 nd W2 crossings of Mullet Creek my e slightly desirle since it is comines with rod crossing nd therefore hs reduced impct on the roder vlley/greenlnds system (i.e., does not introduce new crossing in restored vlley portion). All lignments result in similr low to moderte impcts to uplnd nd wetlnd vegettion. Within the griculturl lnd use context, nturl fetures re lmost exclusively ssocited with the nrrow riprin corridors long the wtercourses. All lterntives result in similr minor removls of Levi Creek PSW nd similr reltively minor removls of culturl medow nd mrsh vegettion communities. All lterntives result in similr low impcts to nthropogeniclly influenced wildlife hitt for rnge of species common in n griculturl setting. If Species t Risk such s Boolink or Estern Medowlrk (i.e., species typiclly found in n griculturl setting) re found to e present, ll lterntives hve similr impcts to their hitt. Therefore, ll lterntives result in low to moderte impcts nd re eqully preferred. W1 nd W2 crossings of Mullet Creek re slightly preferred over W3 nd W4 ecuse they occur t more distured rech t n existing rod crossing. While the sensitivity of the creek crossing t W3/W4 is lso considered low, it my e desirle not to introduce new rod crossing in this newly restored rech. Bsed on the nlysis, it ppers s though two distinct chnnels re present t the Heritge Creek South crossings for ll lterntives. Therefore, ll crossings of Heritge Creek South will require some degree of geomorphic input to the design to ssess nd ddress the potentil issues. W2 nd W4 re preferle due to the improved crossing ngle (more perpendiculr) nd the reduced distnce etween the two chnnels which re expected to result in lower potentil impcts from surfce wter nd geomorphic perspective. All lignments re the sme from groundwter perspective s no wells re impcted. Therefore, W2 nd W4 re preferred over W1 nd W3. There re no known properties with contmintion. There is one property with Certificte of Approvl tht llows for the spreding of iosolids. All other properties impcted re considered to hve moderte potentil for contmintion (in ccordnce with MOE regultions, ny lnds under griculturl use re considered to hve moderte potentil for contmintion). All lignments result in similr impcts to potentilly contminted sites. Therefore, ll lterntives re eqully preferred. From nturl environmentl perspective, the most importnt evlution fctor when compring lterntives within the west corridor is the crossing loction of Heritge Creek South, given its designtion s Recovery Hitt for qutic species t risk. W1 nd W3 hve less desirle crossing loctions on Heritge Creek South since they hve slightly more olique crossing ngle nd will enclose more strem length (or require more extensive chnnel relignment). While W2 nd W4 my lso require some modifictions to loclized strem hitt, it is nticipted tht these impcts will e lower thn W1 nd W2 ecuse crossing re t perpendiculr ngle with less chnnel length impcted. All lterntives result in similr low to moderte impcts to uplnd nd wetlnd vegettion nd ssocited wildlife hitt. Impcts re limited to nrrow riprin corridors. All lterntives results in similr impcts to Levi Creek Provincilly Significnt Wetlnds. Therefore, W2 nd W4 re preferred over W1 nd W3. In terms of impcts to Mple Lodge Frms (MLF), W1 nd W3 offer the lest seprtion distnce from MLF opertions. W2 nd W4 offer more contiguous field re djcent to the plnt nd lgoons tht llows MLF equipment to move more freely etween the plnt nd surrounding lnds therey minimizing the impcts to their existing prctices. W4 provides the est seprtion from the MLF plnt compred to the other lterntives. All lterntives will require frm ccess to djcent field e creted/mintined however, My Wy is considered the most significnt of the ccess rods. W3 nd W4 void impcts to My Wy, the min service rod into the Mple Lodge Frms plnt. W3 nd W4 impct one less prcel of MLF lnds. In terms of impcts to other properties, none of the lterntives will displce residences or usiness. All lignments impct 3 other properties (in dditionl to the MLF lnds); these lnds re owned y Infrstructure Ontrio, Orlndo Group Limited nd privte developer. W4 results in fewer impcts s it ffects one less prcel of lnd, offers the est seprtion distnce from MLF opertions nd voids the min frm ccess rod. Impcts under other criteri re ll considered low. Therefore W4 is preferred over the other lterntives. Bsed on the nlysis, W4 (ACEG) is the preliminry preferred lterntive in the West Corridor. c d Impcts to cemeteries, schools, plces of worship, unique community fetures Nuisnce Impcts (e.g., noise nd esthetics) Impcts on Community Activity/Moility nd Community Chrcter Impcts to Recretionl Fetures All lterntives result in similr low impcts to ll criteri. No community fetures will e encroched upon or displced. There re no prks, recretion res or pulic tils in the Study Are. Although ll of the lignments will crete physicl footprint, there re no impcts to moility within communities s there re no communities locted on ny of the lignments. Overll, moility mong communities eyond the study re should e improved s ll lignments improve rteril rod connections in the re. All lterntives hve similr numer of residences tht my experience incresed noise levels. A noise nlysis of the preferred lignment will e undertken to identify if noise mitigtion is required for ny existing residentil property. Aesthetic impcts re nticipted to e miniml. Proposed rod eing constructed in n re of industril nd griculturl production with surrounding lnd use trnsitioning to urn/employment. Therefore, ll lterntives re eqully preferred. 4.3 Lnd Use c Comptiility with Government Gols/Ojectives /Policies Comptiility with Plnned nd future Lnd Use Impct to Agriculturl Resources All lterntives re eqully comptile with government gols/ojectives nd policies. In terms of existing/pproved development plns, W3 nd W4 provide for more efficient development ly out on the west lock of the Churchill 3 Business Prk, south of Steeles Avenue. In terms of future development/ potentil lnd use chnges consistent with the Officil Pln industril lnds designtion, W1 nd W3 offer the most flexiility with respect to potentil future development lyout north of Steeles Avenue y retining lrge locks est of BWP nd keeping BWP closely ssocited with the utilities corridor. This would optimize the lyout of development prcels tht re le to ccommodte lrge uildings comprle to those plnned in the Churchill Business Prk. Becuse W3 optimizes the lyout for the pproved development south of Steeles Avenue, nd ecuse it provides the most flexiility for potentil future development north of Steeles Avenue, it is considered slightly preferred over the other lterntives when considering future potentil lnd use. All lterntives hve similr impcts to griculturl lnd (nd Clss 1 Soils). Therefore, W3 is considered slightly preferred over the other lterntives. Socio-Economic Environment Summry W4 results in slightly fewer impcts s it ffects one less prcel of lnd, offers the est seprtion distnce from MLF opertions nd voids the min frm ccess rod. Impcts under other criteri re ll considered low. W3 offers the most flexiility with respect to pproved development south of Steeles Avenue nd potentil future development north of Steeles Avenue. However, ecuse there re currently no pproved development plns to the north of Steeles Avenue, W4 is considered to e slightly more preferred thn W3 from socio-economic perspective s it is more comptile with the existing lnd use. Therefore W4 is preferred over the other lterntives. 5 Culturl Heritge Resources Impcts to Built Heritge Fetures nd Culturl Heritge Lndscpes All lterntives result in similr low impcts to heritge fetures. None of the lterntives will impct designted or listed uilt heritge resources. The entire study re is considered Culturl Heritge Lndscpe. As such, ll lterntives will hve similr impcts to the CHL. Therefore, ll lterntives re eqully preferred. Impcts to Archeologicl Resources All lterntives result in similr low impcts to rcheology ecuse the entire study re is within n re of high rcheologicl potentil. A Stge 2 Archeologicl Assessment will e undertken for the preferred lterntive. Therefore, ll lterntives re eqully preferred. Culturl Heritge Summry All lterntives result in similr low impcts to Culturl Heritge Resources. Therefore, ll lterntives re preferred. From trnsporttion perspective, ll lterntives hve similr level of service nd cceptle distnces etween intersections with other rods, re comptile with the existing rodwy network, mintin or enhnce emergency services/ccess nd cn ccommodte cycling/pedestrins. LEGEND: W1 nd W2 re not preferred from technicl perspective ecuse they hve the highest level of conflict with TCPL nd Enridge fcilities. Overll Summry W1 nd W3 provide the lest seprtion distnce from MLF opertions. W2 nd W4 offer more contiguous field re djcent to the plnt nd lgoons tht llows MLF equipment to move more freely etween the plnt nd surrounding lnds therey minimizing the impcts to their existing prctices. W4 provides the est seprtion from the MLF plnt compred to the other lterntives. All lterntives will require frm ccess to djcent field e creted/mintined however W3 nd W4 void impcts to My Wy, the min service rod into the Mple Lodge Frms plnt. W3 offers the most flexiility with respect to pproved development south of Steeles Avenue nd potentil future development north of Steeles Avenue. However, ecuse there re currently no pproved development plns to the north of Steeles Avenue, W4 is considered to e slightly more preferred thn W3 from socio-economic perspective s it is more comptile with the existing lnd use north of Steeles Avenue. High Impct / Lest Benefit Low Impct / Most Benefit W2 nd W4 re preferred from nturl environmentl ecuse they re nticipted to hve lower impcts to Heritge Creek South given the etter crossing ngle nd reduced length of chnnel potentilly impcted. All lterntives result in very similr low impcts to the culturl environment. Therefore this fctor re is not decision relevnt when selecting preferred west corridor lterntive.

29 Brm West Prkwy Centrl Alterntives Stge 1 Evlution C1 C2 C3 C4 Fctor/Criteri (ABDH) (ABEH) (ACDH) (ACEH) Evlution 1 Trnsporttion c d e f g h i Rod Geometry Interchnge Opertions Intersection Spcing Impcts on Locl Rods Impcts of 407 ETR Network Comptiility Flexiility of Future Expnsion Emergency Services Support of Alterntive Modes of Trvel In terms of rod geometry, C3 is the est with the fewest curves. All other lterntives hve similr curviliner lignments. In terms of potentil impct to 407 ETR opertions, C1 nd C2, potentil future full interchnge will result in potentil weving concerns on 407 ETR to the west, given the reltively close proximity to the Highwy 401/407 freewy to freewy interchnge. In terms of future interchnge opertions; ll lterntives re similr for potentil Full Interchnge t 407 ETR in terms of requiring 3 utment modifictions t djcent ridges to ccommodte the speed chnge lnes nd low flexiility of future widening 407 ETR eyond the pproved 8 lnes. C1 nd C2 hve minor impcts on the existing 407 ETR SWM fcility. For potentil Prtil Interchnge t 407 ETR, C1 nd C2 re preferred ecuse they require one less utment modifiction to djcent ridges, mintin high flexiility for future widening of 407 ETR nd void impcts to the existing 407 ETR SWM fcility. All lterntives hve similr level of service nd cceptle distnces etween intersections with other rods, re comptile with the existing rodwy network, mintin or enhnce emergency services/ccess nd cn ccommodte cycling/pedestrins. Therefore, C1 nd C2 re slightly preferred over C3 nd C4. 2 Technicl Considertions c d Impcts to Utilities Degree of Design Chllenge Constructility Issues Cost C1 nd C2 (minline) require 2 crossings of TCPL, 2 crossings of Enridge nd would need to ccommodte n ccess rod to the Enridge vlve sttion locted south of 407 ETR. In contrst, C3 nd C4 my void crossing TCPL, hve 1 crossing of Enridge nd will not impct the Enridge vlve sttion. C3 nd C4 preferred over C1 nd C2 ecuse they require fewer crossings of TCPL nd Enridge, void potentil conflict with Enridge vlve sttion nd provide more flexiility with regrd to future hydro corridor. All lterntives will potentilly conflict with two EA-pproved 230kV hydro lines plnned for south of 407 ETR, within the Prkwy Belt. Creful considertion of potentil mitigtion mesures will need to e undertken regrdless of the preferred lterntive. C3 hs more desirle future development lyout reltive to the Enridge pipeline ROW tht will fcilitte ccess to the pipeline nd void potentil future Clss chnges when surrounding lnd use chnges. Cost of constructility is considered similr for ll lterntives. Slightly higher costs my e ttriuted to C1 nd C2 given the dditionl utilities crossings however, these costs re firly minor when considered in the context of the overll costs of the new rod nd proposed interchnge. Therefore C3 nd C4 re preferred over C1 nd C2. 3 Nturl Environment 3.1 Aqutic Ecosystems Fish nd Fish Hitt 3.2 Terrestril Ecosystems Designted Fetures Uplnd nd Wetlnd Vegettion c Wildlife nd Hitt 3.3 Surfce Wter nd Groundwter Fluvil Geomorphology Surfce Wter (including fluvil geomorphology, floodplin storge/flood conveynce nd stormwter mngement) c Groundwter 3.4 Property Wste & Contmintion Effect on operting nd closed wste disposl sites, known contminted sites nd potentilly contminted sites Nturl Environment Summry 4 Socio-Economic nd Lnd Use 4.1 Property nd Access Impcts to Mple Lodge Frms (numer of properties impcted, impcts to ccess, seprtion distnce from plnt) Impcts to other properties (numer of properties impcted, impcts to residences, impcts to commercil/industril res nd usinesses) c Impct to ccess 4.2 Community Effects All lterntives will require 3 wtercourse crossings: triutry of Mullet Creek, Mullet Creek nd Heritge Creek South. For the purposes of comprison, the crossings of the Mullet Creek triutry re considered similr for ll lterntives. The C1 nd C2 crossings of Mullet Creek re locted in n lredy distured re t Steeles Avenue. However, Mullet Creek crossing for C3 nd C4 is in n re lredy plnned for relignment. There my e some dvntges to utilizing the crossing loction t Steeles Avenue nd voiding newly restored rech downstrem however, in terms of impcts to fish nd fish hitt, ll lterntives re considered similr nd reltively low for Mullet Creek, given the low sensitivity of the hitt. Heritge Creek South hs higher sensitivity given tht it is Regulted s Recovery Hitt for qutic species t risk nd therefore this wtercourse crossing fctors more highly in the evlution. C1 nd C3 hve slightly less desirle crossing loctions on Heritge Creek South since they hve slightly more olique crossing ngle nd will enclose more strem length (or require more extensive chnnel relignment). While C2 nd C4 my lso require some modifictions to loclized strem hitt, it is nticipted tht this impcts will e lower thn C1 nd C2 ecuse crossing re t perpendiculr ngle with less chnnel length impcted. Therefore, C2 nd C4 re preferred over C1 nd C3 There re no Ares of Nturl nd Scientific Interest (ANSI) or Environmentlly Sensitive/Significnt Ares (ESAs) impcted y ny of the lterntives. All lterntives cross vlleys designted s Greenlnds, in two loctions; Mullet Creek nd Heritge Creek South. C1 nd C2 crossings of Mullet Creek my e slightly desirle since it is comines with rod crossing nd therefore hs reduced impct on the roder vlley/greenlnds system (i.e., does not introduce new crossing in restored vlley portion). All lignments result in similr low impcts to uplnd nd wetlnd vegettion. Within the griculturl lnd use context, nturl fetures re lmost exclusively ssocited with the nrrow riprin corridors long the wtercourses. All lterntives result in similr minor removls of Levi Creek PSW nd similr minor removls of culturl medow nd mrsh vegettion communities. All lterntives result in similr low impcts to nthropogeniclly influenced wildlife hitt for rnge of species common in n griculturl setting. If Species t Risk such s Boolink or Estern medowlrk (i.e., species typiclly found in n griculturl setting) re found to e present, ll lterntives hve similr impcts to their hitt. Therefore, ll lterntives re eqully preferred. C1 nd C2 crossings of Mullet Creek re slightly preferred over C3 nd C4 ecuse they occur t more distured rech t n existing rod crossing. While the sensitivity of the creek crossing t C3/C4 is lso considered low, it my e desirle not to introduce new rod crossing in this newly restored rech. Bsed on the nlysis, it ppers s though two distinct chnnels re present t the Heritge Creek South crossings for ll lterntives. Therefore, ll crossings of Heritge Creek South will require some degree of geomorphic input to the design to ssess nd ddress the potentil issues. C2 nd C4 re slightly preferle due to the improved crossing ngle (more perpendiculr) nd the reduced distnce etween the two chnnels which re expected to result in lower potentil impcts from surfce wter nd geomorphic perspective. All lignments re the sme from groundwter perspective s no wells re impcted. Therefore, C2 nd C4 re preferred over C1 nd C3. There re no known properties with contmintion. There is one property with Certificte of Approvl tht llows for the spreding of iosolids. All other properties impcted re considered to hve moderte potentil for contmintion (in ccordnce with MOE regultions, ny lnds under griculturl use re considered to hve moderte potentil for contmintion). All lignments result in similr impcts to potentilly contminted sites. Therefore, ll lterntives re eqully preferred. From nturl environmentl perspective, the most importnt evlution fctor when compring lterntives within the centrl corridor is the crossing loction of Heritge Creek South, given its designtion s Recovery Hitt for qutic species t risk. C1 nd C3 hve less desirle crossing loctions on Heritge Creek South since they hve slightly more olique crossing ngle nd will enclose more strem length (or require more extensive chnnel relignment). While C2 nd C4 my lso require some modifictions to loclized strem hitt, it is nticipted tht these impcts will e lower thn C1 nd C2 ecuse crossing re t perpendiculr ngle with less chnnel length impcted. All lterntives result in similr low to moderte impcts to uplnd nd wetlnd vegettion nd ssocited wildlife hitt. Impcts re limited to nrrow riprin corridors. All lterntives results in similr impcts to Levi Creek Provincilly Significnt Wetlnds. Therefore, C2 nd C4 re preferred over C1 nd C3. In terms of impcts to Mple Lodge Frms (MLF), C1 nd C3 offer the lest seprtion distnce from MLF opertions. C2 nd C4 offer more contiguous field re djcent to the plnt nd lgoons tht llows MLF equipment to move more freely etween the plnt nd surrounding lnds therey minimizing the impcts to their existing prctices. C4 provides the est seprtion from the MLF plnt compred to the other lterntives. All lterntives will require frm ccess to djcent field e creted/mintined however, My Wy is considered the most significnt of the ccess rods. C3 nd C4 void impcts to My Wy, the min service rod into the Mple Lodge Frms plnt. C3 nd C4 impct one less prcel of MLF lnds. In terms of impcts to other properties, none of the lterntives will displce residences or usiness. All lignments impct 3 other properties (in dditionl to the MLF lnds); these lnds re owned y Infrstructure Ontrio, Orlndo Group Limited nd privte developer. C4 results in fewer impcts s it ffects one less prcel of lnd, offers the est seprtion distnce from MLF opertions nd voids the min frm ccess rod. Impcts under other criteri re ll considered low. Therefore C4 is considered preferred over the other lterntives. Bsed on the nlysis, C4 (ACEH) is the preliminry preferred lterntive in the Centrl Corridor. c d Impcts to cemeteries, schools, plces of worship, unique community fetures Nuisnce Impcts (e.g., noise nd esthetics) Impcts on Community Activity/Moility nd Community Chrcter Impcts to Recretionl Fetures All lterntives result in similr low impcts to ll criteri. No community fetures will e encroched upon or displced. There re no prks, recretion res or pulic tils in the Study Are. Although ll of the lignments will crete physicl footprint, there re no impcts to moility within communities s there re no communities locted on ny of the lignments. Overll, moility mong communities eyond the study re should e improved s ll lignments improve rteril rod connections in the re. All lterntives hve similr numer of residences tht my experience incresed noise levels. A noise nlysis of the preferred lignment will e undertken to identify if noise mitigtion is required for ny existing residentil property. Aesthetic impcts re nticipted to e miniml. Proposed rod eing constructed in n re of industril nd griculturl production with surrounding lnd use trnsitioning to urn/employment. Therefore, ll lterntives re eqully preferred. 4.3 Lnd Use c Comptiility with Government Gols/Ojectives /Policies Comptiility with Plnned nd future Lnd Use Impct to Agriculturl Resources All lterntives re eqully comptile with government gols/ojectives nd policies. In terms of existing/pproved development plns, C3 nd C44 provide for more efficient development ly out on the west lock of the Churchill 3 Business Prk, south of Steeles Avenue. In terms of future development/ potentil lnd use chnges consistent with the Officil Pln industril lnds designtion, C1 nd C3 offer the most flexiility with respect to potentil future development lyout north of Steeles Avenue y retining lrge locks est of BWP nd keeping BWP closely ssocited with the utilities corridor. This would optimize the lyout of development prcels tht re le to ccommodte lrge uildings comprle to those plnned in the Churchill Business Prk. Becuse C3 optimizes the lyout for the pproved development south of Steeles Avenue, nd ecuse it provides the most flexiility for potentil future development north of Steeles Avenue, it is considered slightly preferred over the other lterntives when considering future potentil lnd use. All lterntives hve similr impcts to griculturl lnd (nd Clss 1 Soils). Therefore, C3 is considered slightly preferred over the other lterntives. Socio-Economic Environment Summry C4 results in slightly fewer impcts s it ffects one less prcel of lnd, offers the est seprtion distnce from MLF opertions nd voids the min frm ccess rod. Impcts under other criteri re ll considered low. C3 offers the most flexiility with respect to pproved development south of Steeles Avenue nd potentil future development north of Steeles Avenue. However, ecuse there re currently no pproved development plns to the north of Steeles Avenue, C4 is considered to e slightly more preferred thn C3 from socio-economic perspective s it is more comptile with the existing lnd use. Therefore C4 is preferred over the other lterntives. 5 Culturl Heritge Resources Impcts to Built Heritge Fetures nd Culturl Heritge Lndscpes All lterntives result in similr low impcts to heritge fetures. None of the lterntives will impct designted or listed uilt heritge resources. The entire study re is considered Culturl Heritge Lndscpe. As such, ll lterntives will hve similr impcts to the CHL. Therefore, ll lterntives re eqully preferred. Impcts to Archeologicl Resources All lterntives result in similr low impcts to rcheology ecuse the entire study re is within n re of high rcheologicl potentil. A Stge 2 Archeologicl Assessment will e undertken for the preferred lterntive. Therefore, ll lterntives re eqully preferred. Culturl Heritge Summry All lterntives result in similr low impcts to Culturl Heritge Resources. Therefore, ll lterntives re preferred. From trnsporttion perspective, ll lterntives hve similr level of service nd cceptle distnces etween intersections with other rods, re comptile with the existing rodwy network, mintin or enhnce emergency services/ccess nd cn ccommodte cycling/pedestrins. LEGEND: C1 nd C2 re not preferred from technicl perspective ecuse they hve the highest level of conflict with TCPL nd Enridge fcilities. Overll Summry C1 nd C3 provide the lest seprtion distnce from MLF opertions. C2 nd C4 offer more contiguous field re djcent to the plnt nd lgoons tht llows MLF equipment to move more freely etween the plnt nd surrounding lnds therey minimizing the impcts to their existing prctices. C4 provides the est seprtion from the MLF plnt compred to the other lterntives. All lterntives will require frm ccess to djcent field e creted/mintined however C3 nd C4 void impcts to My Wy, the min service rod into the Mple Lodge Frms plnt. In terms of comptiility with existing nd future development,c3 offers the most flexiility with respect to pproved development south of Steeles Avenue nd potentil future development north of Steeles Avenue. However, ecuse there re currently no pproved development plns to the north of Steeles Avenue, C4 is considered to e slightly more preferred thn C3 from socio-economic perspective s it is more comptile with the existing lnd use north of Steeles Avenue. High Impct / Lest Benefit Low Impct / Most Benefit C2 nd C4 re preferred from nturl environmentl ecuse they re nticipted to hve lower impcts to Heritge Creek South given the etter crossing ngle nd reduced length of chnnel potentilly impcted. All lterntives result in very similr low impcts to the culturl environment. Therefore this fctor re is not decision relevnt when selecting preferred centrl corridor lterntive.

30 Brm West Prkwy Est Alterntives Stge 1 Evlution E1 E2 E3 E4 E5 Fctor/Criteri (ABDI) (ABEI) (ACDI) (ACEI) (ACFI) Evlution 1 Trnsporttion c d e f g h i Rod Geometry Interchnge Opertions Intersection Spcing Impcts on Locl Rods Impcts of 407 ETR Network Comptiility Flexiility of Future Expnsion Emergency Services Support of Alterntive Modes of Trvel In terms of rod geometry, E2, E3 nd E4 re considered slightly etter since they re less curviliner. In terms of potentil impct to 407 ETR opertions, E1 nd E2, potentil future full interchnge will result in potentil weving concerns on 407 ETR to the west, given the reltively close proximity to the Highwy 401/407 freewy to freewy interchnge. In terms of future interchnge opertions; ll lterntives re similr for potentil Full Interchnge t 407 ETR in terms of requiring 3 utment modifictions t djcent ridges to ccommodte the speed chnge lnes nd low flexiility of future widening 407 ETR eyond the pproved 8 lnes. E3, E4 nd E5 hve minor impcts on the existing 407 ETR SWM fcility. For potentil Prtil Interchnge t 407 ETR, E1 nd E2 re preferred ecuse they require one less utment modifiction to djcent ridges, mintin high flexiility for future widening of 407 ETR nd void impcts to the existing 407 ETR SWM fcility. All lterntives hve similr level of service nd cceptle distnces etween intersections with other rods, re comptile with the existing rodwy network, mintin or enhnce emergency services/ccess nd cn ccommodte cycling/pedestrins. Therefore, E1 nd E2 re slightly preferred over the other lterntives. 2 Technicl Considertions c d Impcts to Utilities Degree of Design Chllenge Constructility Issues Cost E1 nd E2 (minline) require 2 crossings of TCPL, 3 crossings of Enridge nd would need to ccommodte n ccess rod to the Enridge vlve sttion locted south of 407 ETR. In contrst, E3/E4/E5 hve no crossings of TCPL, 1 crossing of Enridge, void potentil conflict with Enridge vlve sttion nd provide more flexiility with regrd to future hydro corridor. All lterntives will potentilly conflict with two EA-pproved 230kV hydro lines plnned for south of 407 ETR, within the Prkwy Belt. Creful considertion of potentil mitigtion mesures will need to e undertken regrdless of the preferred lterntive. E3 hs more desirle loction reltive to the Enridge pipeline future development lyout reltive to the pipeline tht will fcilitte ccess to the pipeline nd void potentil future Clss chnges when surrounding lnd use chnges. Cost of constructility is considered similr for ll lterntives. Higher costs my e ttriuted to E1 nd E2 given the dditionl utilities crossings however, these costs re firly minor when considered in the context of the overll costs of the new rod nd proposed interchnge. Therefore E3, E4 nd E5 re preferred over E1 nd E2. 3 Nturl Environment 3.1 Aqutic Ecosystems Fish nd Fish Hitt All lterntives, with the exception of E5 will require 4 wtercourse crossings: triutry of Mullet Creek, Mullet Creek nd Heritge Creek South nd Heritge Creek North. For the purposes of comprison, the crossings of the Mullet Creek triutry re considered similr for ll lterntives. E5 crosses Heritge Creek t the confluence of the North nd South rnches. The E1 nd E2 crossings of Mullet Creek re locted in n lredy distured re t Steeles Avenue. However, the Mullet Creek crossing for E3, E4 nd E5 is in n re lredy plnned for relignment. There my e some dvntges to utilizing the crossing loction t Steeles Avenue nd voiding newly restored rech downstrem however, in terms of impcts to fish nd fish hitt, ll lterntives re considered similr nd reltively low for Mullet Creek. Heritge Creek is considered more sensitive given tht it is Regulted s Recovery Hitt for qutic species t risk nd therefore this wtercourse fctors more highly in the evlution. E1 nd E3 hve less desirle crossing loctions on Heritge Creek South since they hve slightly more olique crossing ngle nd will enclose more strem length (or require more extensive chnnel relignment). E1 nd E3 hve more desirle crossing loctions on Heritge Creek North ecuse it is locted t frm crossing (previously distured re) nd hs more perpendiculr crossing ngle. The slight dvntges nd disdvntges of the creek crossing loctions ssocited with E1, E2, E3 nd E4 mkes them ll somewht similr in terms of trde-offs. E2 nd E4 re considered more preferred ecuse they hve etter crossing loctions on more complex creek system (Heritge Creek South). E5 is lest preferred ecuse it is locted very close to the confluence of Heritge Creeks North nd South. Therefore, E2 nd E4 re preferred over E1 nd E3, nd much more preferred over E Terrestril Ecosystems c Designted Fetures Uplnd nd Wetlnd Vegettion Wildlife nd Hitt There re no Ares of Nturl nd Scientific Interest (ANSI) or Environmentlly Sensitive/Significnt Ares (ESAs) impcted y ny of the lterntives. All lterntives cross vlleys designted s Greenlnds, in three loctions; Mullet Creek, Heritge Creek South nd Heritge Creek North. E1 nd E2 crossings of Mullet Creek my e slightly desirle since it is comines with rod crossing nd therefore hs reduced impct on the roder vlley/greenlnds system (i.e., does not introduce new crossing in restored vlley portion). All lignments result in similr low to moderte impcts to uplnd nd wetlnd vegettion. All result in similr minor removls of culturl medow nd mrsh vegettion communities. E5 hs the enefit of voiding wetlnds designted s Levi Creek PSW, ut this lterntive still ffects similr re of vegettion overll. All lterntives result in similr low impcts to nthropogeniclly influenced wildlife hitt for rnge of species common in n griculturl setting. If Species t Risk such s Boolink or Estern Medowlrk (i.e., species typiclly found in n griculturl setting) re found to e present, ll lterntives hve similr impcts to their hitt. Therefore, ll lterntives re eqully preferred. 3.3 Surfce Wter nd Groundwter c Fluvil Geomorphology Surfce Wter (including fluvil geomorphology, floodplin storge/flood conveynce nd stormwter mngement) Groundwter E1 nd E2 crossings of Mullet Creek re slightly preferred ecuse they occur t more distured rech t n existing rod crossing. While the sensitivity of the creek crossing t E3/E4/E5 is lso considered low, it my e desirle not to introduce new rod crossing in this newly restored rech. Bsed on the nlysis, it ppers s though two distinct chnnels re present t the Heritge Creek South crossings for ll lterntives. Therefore, ll crossings of Heritge Creek South will require some degree of geomorphic input to the design to ssess nd ddress the potentil issues. E2 nd E4 re preferle due to the improved crossing ngle (more perpendiculr) nd the reduced distnce etween the two chnnels. E1 nd E3 hve more desirle crossing loctions on Heritge Creek North ecuse it is locted t frm crossing (previously distured re) nd hs more perpendiculr crossing ngle. E5 is locted t the confluence of Heritge Creeks North nd South nd therefore this lterntive is lest preferred from oth geomorphic nd floodplin impct perspectives. Therefore, E2 nd E4 re preferred over E1 nd E3, nd much more preferred over E Property Wste & Contmintion Effect on operting nd closed wste disposl sites, known contminted sites nd potentilly contminted sites Nturl Environment Summry 4 Socio-Economic nd Lnd Use 4.1 Property nd Access Impcts to Mple Lodge Frms (numer of properties impcted, impcts to ccess, seprtion distnce from plnt) Impcts to other properties (numer of properties impcted, impcts to residences, impcts to commercil/industril res nd usinesses) c Impct to ccess 4.2 Community Effects Impcts to cemeteries, schools, plces of worship, unique community fetures Nuisnce Impcts (e.g., noise nd esthetics) Impcts on Community Activity/Moility nd Community c Chrcter d Impcts to Recretionl Fetures 4.3 Lnd Use There re no known properties with contmintion. There is one property with Certificte of Approvl tht llows for the spreding of iosolids. All other properties impcted re considered to hve moderte potentil for contmintion (in ccordnce with MOE regultions, ny lnds under griculturl use re considered to hve moderte potentil for contmintion). All lignments result in similr impcts to potentilly contminted sites. Therefore, ll lterntives re eqully preferred. From nturl environmentl perspective, the most importnt evlution fctor when compring lterntives within the est corridor is the numer nd loction/siting of crossings of Heritge Creek nd Levi Creek, given their designtion s Recovery Hitt for qutic species t risk. E1 nd E2 crossings of Mullet Creek re slightly preferred over E3/E4/E5 from geomorphologicl perspective. However, for the Heritge Creek South crossing, E2 nd E4 re preferred over E1 nd E3 from fisheries nd geomorphologicl perspectives. E5 is lest preferred due to the complexity of hving wtercourse crossing sited on confluence of two creeks. This crossing would require sustntil reconfigurtion of the chnnels nd the loction of the confluence. Therefore, E2 nd E4 re preferred over E1 nd E3 nd much more preferred over E5. In terms of impcts to Mple Lodge Frms (MLF), E1 nd E3 offer the lest seprtion distnce from MLF opertions. E2, E4 nd E5 offer more contiguous field re djcent to the plnt nd lgoons tht llows MLF equipment to move more freely etween the plnt nd surrounding lnds therey minimizing the impcts to their existing prctices. E5 provides the est seprtion from the MLF plnt compred to the other lterntives. All lterntives will require frm ccess to djcent field e creted/mintined however, My Wy is considered the most significnt of the ccess rods. E3, E4 nd E5 void impcts to My Wy, the min service rod into the Mple Lodge Frms plnt nd impct one less prcel of MLF lnds. In terms of impcts to other properties, E1, E2, E3 nd E4 impct 3 other properties (in dditionl to the MLF lnds); these lnds re owned y Infrstructure Ontrio, Orlndo Group Limited nd privte developer. E5 impcts one dditionl property nd hs significnt encrochment into n djcent horse frm; resulting in the removl of pddock nd trining circuit. E4 results in fewer impcts s it ffects one less prcel of lnd, offers the est seprtion distnce from MLF opertions nd voids the min frm ccess rod. Impcts under other criteri re ll considered low. Therefore E4 is considered preferred over the other lterntives. All lterntives result in similr low impcts to ll criteri. No community fetures will e encroched upon or displced. There re no prks, recretion res or pulic tils in the Study Are. Although ll of the lignments will crete physicl footprint, there re no impcts to moility within communities s there re no communities locted on ny of the lignments. Overll, moility mong communities eyond the study re should e improved s ll lignments improve rteril rod connections in the re. All lterntives hve similr numer of residences tht my experience increses in noise levels. A noise nlysis of the preferred lignment will e undertken to identify if noise mitigtion is required for ny existing residentil property. Aesthetic impcts re nticipted to e miniml. Proposed rod eing constructed in n re of industril griculturl production with surrounding lnd use trnsitioning to urn/employment. Therefore, ll lterntives re eqully preferred. All lterntives re eqully comptile with government gols/ojectives nd policies. Bsed on the nlysis, E4 (ACEI) is the preliminry preferred lterntive in the Est Corridor. c Comptiility with Government Gols/Ojectives /Policies Comptiility with Plnned nd future Lnd Use Impct to Agriculturl Resources In terms of existing/pproved development plns, E3/E4/E5 provide for more efficient development ly out on the west lock of the Churchill 3 Business Prk, south of Steeles Avenue. In terms of future development/ potentil lnd use chnges consistent with the Officil Pln industril lnds designtion, E1 nd E3 offer the most flexiility with respect to potentil future development lyout north of Steeles Avenue y retining lrge locks est of BWP nd keeping BWP closely ssocited with the utilities corridor. This would optimize the lyout of development prcels tht re le to ccommodte lrge uildings comprle to those plnned in the Churchill Business Prk. E2 nd E4 offer slightly less flexiility with respect to potentil future development lyout north of Steeles Avenue ut, they ct s mid-lock rod, potentilly creting good ccess/frontge opportunities, lthough the mximum prcel size is more limited thn with E1 nd E3. However, E2 nd E4 result in n undesirle smll remnnt prcel locted etween BWP nd Heritge Creek North. E5 is considered etter thn E2 nd E4 in this regrd ecuse this lterntive keeps BWP close to Heritge Creek North, mintining develople lnds to the est nd west. Becuse E3 optimizes the lyout for the pproved development south of Steeles Avenue, nd ecuse it provides the most flexiility for potentil future development north of Steeles Avenue, it is considered slightly preferred over the other lterntives when considering future potentil lnd use. All lterntives hve similr impcts to griculturl lnd (nd Clss 1 Soils). Therefore, E3 nd E5 re considered slightly preferred over the other lterntives. Socio-Economic Environment Summry E4 offers good seprtion distnce from MLF opertions nd voids the min frm ccess rod. While E5 offers greter seprtion distnce from MLF, it impcts one dditionl property nd hs significnt encrochment into n djcent horse frm; resulting in the removl of pddock nd trining circuit. E3 offers the most flexiility with respect to pproved development south of Steeles Avenue nd potentil future development north of Steeles Avenue. However, ecuse there re currently no pproved development plns to the north of Steeles Avenue, E4 is considered to e slightly more preferred thn E3 from socio-economic perspective s it is more comptile with the existing lnd use. Therefore E4 is preferred over the other lterntives. 5 Culturl Heritge Resources Impcts to Built Heritge Fetures nd Culturl Heritge Lndscpes All lterntives result in similr low impcts to heritge fetures. None of the lterntives will impct designted or listed uilt heritge resources. The entire study re is considered Culturl Heritge Lndscpe. As such, ll lterntives will hve similr impcts to the CHL. Therefore, ll lterntives re eqully preferred. Impcts to Archeologicl Resources All lterntives result in similr impcts to rcheology ecuse the entire study re is within n re of high rcheologicl potentil. A Stge 2 Archeologicl Assessment will e undertken for the preferred lterntive. Therefore, ll lterntives re eqully preferred. Culturl Heritge Summry All lterntives result in similr low impcts to Culturl Heritge Resources. Therefore, ll lterntives re preferred. From trnsporttion perspective, ll lterntives hve similr level of service nd cceptle distnces etween intersections with other rods, re comptile with the existing rodwy network, mintin or enhnce emergency services/ccess nd cn ccommodte cycling/pedestrins. LEGEND: E1 nd E2 re not preferred from technicl perspective ecuse they hve the highest level of conflict with TCPL nd Enridge fcilities. Overll Summry E1 nd E3 provide the lest seprtion distnce from MLF opertions. E2, E4 nd E5 offer more contiguous field re djcent to the plnt nd lgoons tht llows MLF equipment to move more freely etween the plnt nd surrounding lnds therey minimizing the impcts to their existing prctices. E5 provides the est seprtion from the MLF plnt compred to the other lterntives however, the dditionl property impcts it cretes mke this lterntive much less preferred. All lterntives will require frm ccess to djcent field e creted/mintined however E3, E4 nd E5 void impcts to My Wy, the min service rod into the Mple Lodge Frms plnt. E3 offers the most flexiility with respect to pproved development south of Steeles Avenue nd potentil future development north of Steeles Avenue. However, ecuse there re currently no pproved development plns to the north of Steeles Avenue E4 is considered to e slightly more preferred thn E3 from socio-economic perspective s it is more comptile with the existing lnd use. High Impct / Lest Benefit Low Impct / Most Benefit E2 nd E4 re preferred from nturl environmentl perspective ecuse they hve lower impcts to Heritge Creek South. E5 is lest preferred due to the poor crossing loction of Heritge Creek, locted t the confluence of Heritge Creeks North nd South. All lterntives result in very similr low impcts to the culturl environment. Therefore this fctor re is not decision relevnt when selecting preferred west corridor lterntive.

31 Brm West Prkwy Stge 1 Preferred Alterntives Bsed on the Stge 1 evlution: W4 (ACEG) C4 (ACEH) E4 (ACEI) re the preliminry preferred lterntives for Brm West Prkwy from the West, Centrl nd Est corridors. These lterntives re crried forwrd to the Stge 2 evlution.

32 Brm West Prkwy Stge 2 Evlution Fctor/Criteri W4 (ACEG) C4 (ACEH) E4 (ACEI) Evlution 1 Trnsporttion c d e f g h i Rod Geometry Interchnge Opertions Intersection Spcing Impcts on Locl Rods Impcts of 407 ETR Network Comptiility Flexiility of Future Expnsion Emergency Services Support of Alterntive Modes of Trvel The most significnt difference etween the three lterntives from trnsporttion perspective is relted to flexiility for future expnsion to the north. Becuse of their more westerly loction, W4 nd C4 hve very high the flexiility in terms of generting future extension lignments to the north tht cn void significnt nturl, socio-economic nd culturl fetures; oth of these lterntives terminte on the west of the significnt woodlnd where there re fewer constrints locted to the north. C4 is somewht more constrined thn W4 for short distnce north ecuse future extension would e locted etween the TCPL ROW nd the woodlnd nd would cross Heritge Creek North, potentilly resulting in low to moderte impcts to these fetures in the future. E4 is the lest flexile in terms of future extension. An extension north from its current terminus t the proposed Finncil Drive extension would result in significnt impcts to the community (residences nd usinesses) long Emleton Rod nd would hve lower trnsporttion network comptiility in tht the future BWP would e in very close proximity to Heritge Rod nd the intersection of Heritge Rod/Emleton Rod. In order to void these impcts, future extension from E4 would hve to swing to the west nd, while this is fesile from rod geometry perspective, it is not desirle from technicl/cost perspective. Furthermore, extending the rod to the north nd then west would require tht n lignment e locted etween the wetlnd nd woodlnd resulting in the removl of wide hedgerow nd cretion of rrier cross hitt linkge/wildlife movement corridor. In terms of future interchnge opertions; ll lterntives re similr for potentil Full Interchnge t 407 ETR in terms of requiring 3 utment modifictions t djcent ridges to ccommodte the speed chnge lnes nd low flexiility of future widening 407 ETR eyond the pproved 8 lnes. Some of these impcts my e mitigted if prtil interchnge is implemented. All lterntives hve minor impcts on the existing 407 ETR SWM fcility, in tht this fcility would hve to e reconfigured to mintin storge volume. For potentil Prtil Interchnge t 407 ETR, ll lterntives mintin moderte flexiility for future widening of 407 ETR. All lterntives hve similr rod geometry, level of service nd cceptle distnces etween intersections with other rods, re comptile with the existing rodwy network, mintin or enhnce emergency services/ccess nd cn ccommodte cycling/pedestrins. Therefore, W4 is slightly preferred over C4 nd oth re much preferred over E4. 2 Technicl Considertions Impcts to Utilities W4 requires 1 crossing of TCPL nd 2 crossings of Enridge fcilities. C4 nd E4 potentilly void TCPL crossings on the BWP minline (i.e., excluding the potentil Degree of Design Chllenge future interchnge nd require only 1 crossing of Enridge fcilities. C4 nd E4 re considered slightly less constrined thn W4 in terms of the flexiility to ccommodte potentil future hydro corridor. c Constructility Issues Cost of constructility is considered similr for ll lterntives. Slightly higher costs ttriuted to W1 given the dditionl utilities crossing however, these costs re firly minor when considered in the context of the overll costs of the new rod nd proposed interchnge. d Cost Therefore C4 nd E4 re slightly preferred over W4. 3 Nturl Environment 3.1 Aqutic Ecosystems Fish nd Fish Hitt W4 nd C4 require crossings of the triutry of Mullet Creek, Mullet Creek nd Heritge Creek South. E4 will require n dditionl crossing of Heritge Creek North. All lterntives cross the Mullet Creek triutry in the sme loction. All lterntives cross Mullet Creek t the sme loction in n re tht is plnned for future relignment s prt of the pproved development of the Churchill Business Prk, Phse 3. All lterntives cross Heritge Creek South in similr loction nd therefore re considered similr in terms of potentil impcts to this wtercourse. Becuse E4 requires n dditionl wtercourse crossing t Heritge Creek North, it is considered slightly less preferred thn the other lterntives due to the potentil for dditionl impcts. Therefore, W4 nd C4 re slightly preferred over E Terrestril Ecosystems Designted Fetures Uplnd nd Wetlnd Vegettion c Wildlife nd Hitt 3.3 Surfce Wter nd Groundwter Fluvil Geomorphology Surfce Wter (including fluvil geomorphology, floodplin storge/flood conveynce nd stormwter mngement) c Groundwter 3.4 Property Wste & Contmintion Effect on operting nd closed wste disposl sites, known contminted sites nd potentilly contminted sites Nturl Environment Summry 4 Socio-Economic nd Lnd Use 4.1 Property nd Access Impcts to Mple Lodge Frms (numer of properties impcted, impcts to ccess, seprtion distnce from plnt) Impcts to other properties (numer of properties impcted, impcts to residences, impcts to commercil/industril res nd usinesses) c Impct to ccess 4.2 Community Effects Impcts to cemeteries, schools, plces of worship, unique community fetures Nuisnce Impcts (e.g., noise nd esthetics) Impcts on Community Activity/Moility nd Community c Chrcter d Impcts to Recretionl Fetures 4.3 Lnd Use There re no Ares of Nturl nd Scientific Interest (ANSI) or Environmentlly Sensitive/Significnt Ares (ESAs) impcted y ny of the lterntives. All lterntives result in similr low impcts to designted fetures. All lterntives cross vlleys designted s Greenlnds. W4 nd C4 cross in two loctions: Mullet Creek nd Heritge Creek South. E4 hs n dditionl crossing t Heritge Creek North. All lignments result in similr low to moderte impcts to uplnd nd wetlnd vegettion. Within the griculturl lnd use context, nturl fetures re lmost exclusively ssocited with the nrrow riprin corridors long the wtercourses. All result in similr minor removls of culturl medow nd mrsh vegettion communities. Due to the dditionl vlley crossing, E4 results in slightly more impct to (removl of) PSW nd vlley vegettion communities, lthough the differences is still considered quite minor (i.e., E4 removes 0.34 h of PSW while C4 removes 0.16 h). For this reson, E4 is considered less desirle. All lterntives result in similr low impcts to nthropogeniclly influenced wildlife hitt for rnge of species common in n griculturl setting. If Species t Risk such s Boolink or Estern Medowlrk (i.e., species typiclly found in n griculturl setting) re found to e present, ll lterntives hve similr impcts to their hitt. Therefore, W4 nd C4 re preferred over E4. As noted ove, ll lterntives cross the Mullet Creek triutry in the sme loction. All lterntives cross Mullet Creek t the sme loction in n re tht is plnned for future relignment s prt of the pproved development of the Churchill Business Prk, Phse 3. All lterntives cross Heritge Creek South in similr loction nd therefore re considered similr in terms of potentil impcts. Bsed on the nlysis, it ppers s though two distinct chnnels re present t the Heritge Creek South crossings for ll lterntives. Therefore, ll crossings of Heritge Creek South will require some degree of geomorphic input to the design to ssess nd ddress the potentil issues. E4 requires crossing of Heritge Creek North nd therefore is slightly less preferred s it results in dditionl incrementl impcts to flood storge/conveynce tht must e mitigted. Therefore, W4 nd C4 re slightly preferred over E4. There re no known properties with contmintion. There is one property with Certificte of Approvl tht llows for the spreding of iosolids. All other properties impcted re considered to hve moderte potentil for contmintion (in ccordnce with MOE regultions, ny lnds under griculturl use re considered to hve moderte potentil for contmintion). All lignments result in similr impcts to potentilly contminted sites. Therefore, ll lterntives re eqully preferred. From nturl environmentl perspective, the most importnt evlution fctor when compring lterntives within the west corridor is the numer of crossing of Levi Creek triutries (Heritge Creek), given their designtion s Recovery Hitt for qutic species t risk. E4 is slightly less preferred thn W4 nd C4 ecuse it requires n dditionl crossing of Heritge Creek (Heritge Creek North) nd hs incresed impcts to vlley vegettion nd hitt, the Levi Creek PSW nd the floodplin. Therefore, W4 nd C4 re slightly preferred over E4. In terms of impcts to Mple Lodge Frms (MLF), W4 nd C4 hve very similr seprtion distnce from MLF opertions. E4 offers the est seprtion distnce nd provides more contiguous field re djcent to the plnt nd lgoons tht llows MLF equipment to move more freely etween the plnt nd surrounding lnds therey minimizing the impcts to their existing prctices. E4 impcts fewer MLF properties. E4 impcts 2 MLF properties in comprison to the 4 properties impcted y W4 nd C4 (leit, the 4 th property is minor edge impct ssocited with the intersection of Finncil Drive nd BWP). In terms of impcts to other properties, none of the lterntives will displce residences or usiness. All lterntives impct 3 other properties (in dditionl to the MLF lnds); these lnds re owned y Infrstructure Ontrio, Orlndo Group Limited nd privte developer. E4 isects the privte developer-owned lnds nd therefore my e considered less desirle y tht owner. Therefore ll lterntives re eqully preferred. All lterntives result in similr low impcts to most criteri. No community fetures will e encroched upon or displced. There re no prks, recretion res or pulic tils in the Study Are. Although ll of the lignments will crete physicl footprint, there re no impcts to moility within communities s there re no communities locted on ny of the lignments. Overll, moility mong communities eyond the study re should e improved s ll lignments improve rteril rod connections in the re. E4 hs pproximtely doule the numer of sensitive receivers (i.e., residences) locted ner the lignment. Up to 18 residences my experience incresed noise levels s result of E4, in contrst to the 8 nd 9 residences for W4 nd C4. A noise nlysis of the preferred lignment will e undertken to identify if noise mitigtion is required for ny existing residentil property. E4 hs higher potentil of creting noise impcts tht require mitigtion. Therefore, W4 nd C4 re slightly preferred over E4. Bsed on the Stge 2 evlution, C4 (ACEH) is the preliminry preferred lterntive for Brm West Prkwy c Comptiility with Government Gols/Ojectives /Policies Comptiility with Plnned nd future Lnd Use Impct to Agriculturl Resources All lterntives re eqully comptile with government gols/ojectives nd policies. All lterntives provide for efficient development ly out on the west lock of the Churchill 3 Business Prk, south of Steeles Avenue. All lterntives provide less thn optiml flexiility with respect to potentil future development lyout north of Steeles Avenue. While W4 nd C4 provide more flexiility to the est, they result in remnnt prcel locted etween BWP nd the MLF lgoons however, this is not n issue with the existing lnd uses. E4 provides mid-lock rod, potentilly creting good ccess/frontge opportunities on oth sides of the lignment lthough the mximum prcel size will e limited, however, it lso results in smll remnnt prcel etween BWP nd heritge Creek South. There re trde-offs ssocited with ech lterntives nd therefore, for the purposes of this evlution, ll re considered similr with respect to flexiility for potentil future development. All lterntives re similr in impcts to griculturl lnd (nd Clss 1 Soils). Therefore ll lterntives re eqully preferred. Socio-Economic Environment Summry E4 offers good seprtion distnce from MLF opertions nd offers the flexiility with respect to pproved development south of Steeles Avenue nd potentil future development north of Steeles Avenue. All provide similr overll flexiility for potentil future development north of Steeles Avenue. E4 hs greter numer of residences tht my experience increses in noise levels therefore my hve greter potentil to result in noise impcts requiring mitigtion. All lterntives re very similr from socio-economic perspective, nd where there re differences, the significnce of the differences in impcts is considered minor. Therefore E4 is only slightly preferred over the other lterntives. 5 Culturl Heritge Resources Impcts to Built Heritge Fetures nd Culturl Heritge Lndscpes All lterntives result in similr low impcts to heritge fetures. None of the lterntives will impct designted or listed uilt heritge resources. The entire study re is considered Culturl Heritge Lndscpe. As such, ll lterntives will hve similr impcts to the CHL. Therefore, ll lterntives re eqully preferred. Impcts to Archeologicl Resources All lterntives result in similr impcts to rcheology ecuse the entire study re is within n re of high rcheologicl potentil. A Stge 2 Archeologicl Assessment will e undertken for the preferred lterntive. Therefore, ll lterntives re eqully preferred. Culturl Heritge Summry All lterntives result in similr low impcts to Culturl Heritge Resources. Therefore, ll lterntives re preferred. From trnsporttion perspective, ll lterntives hve similr level of service nd cceptle distnces etween intersections with other rods, re comptile with the existing rodwy network, mintin or enhnce emergency services/ccess nd cn ccommodte cycling/pedestrins. The most significnt differences etween the lterntives in considering the flexiility of future extension to the north. W4 is considered to hve slightly more flexiility thn C4 ecuse n extension of C4 would e locted etween the TCPL ROW nd the woodlnd nd would cross Heritge Creek North. E4 is much less preferred ecuse it hs the lowest flexiility in terms of future expnsion. W4 is lest preferred from technicl perspective ecuse it results in higher impcts to (or conflicts with) utilities. C4 nd E4 void crossing the TCPL ROW nd minimize crossings of Enridge (nd impcts to Enridge fcilities). LEGEND: Overll Summry From socio-economic perspective, E4 provides the est seprtion distnce from Mple Lodge Frms plnt, nd voids impcts to My Wy. However, E4 hs undesirle impcts to properties (i.e., isects the prcel just south of Finncil Drive) nd hs the potentil to result in noise impcts tht must e mitigted, given the numer of nery residences tht my experience increses in noise levels. C4 is only slightly less preferred thn E4 from socio-economic perspective due to the closer proximity to the MLF plnt. From nturl environmentl perspective, E4 is less preferred ecuse it requires n dditionl wtercourse crossing. High Impct / Lest Benefit Low Impct / Most Benefit Overll, C4 is similr to W4 nd E4 however, it is considered preferred ecuse it hs much etter flexiility for future expnsion thn E4 nd does not hve the utilities conflicts ssocited with W4.

33 Preliminry Preferred Alterntive Alignment of Brm West Prkwy Bsed on the ssessment nd evlution C4 (ACEH) hs een selected s the preliminry preferred lterntive for Brm West Prkwy. C4 ws selected s the preliminry preferred lterntive ecuse: From trnsporttion perspective, C4 offers significntly more flexiility thn the Est Corridor lterntives, with respect to future extension to the north. A future north extension from C4 cn etter void significnt community, socio-economic nd nturl environmentl impcts when extended in the future. From technicl perspective, C4 voids crossing the TCPL ROW nd minimizes crossings of Enridge (nd impcts to Enridge fcilities). The West corridor options resulted in significntly higher impcts to (or conflicts with) utilities. Although E4 provides slightly more contiguous field re djcent to Mple Lodge Frms, this enefit is offset y the significnt constrints with respect to future extension to the north. From nturl environmentl perspective, C4 minimizes potentil impcts y crossing Heritge Creek South in preferred loction nd voiding crossing t Heritge Creek North. Brm West Prkwy (Finncil Drive to Heritge Rod) nd Finncil Drive (Heritge Rod to Winston Churchill Boulevrd)

34 Potentil Are for Future Hydro Corridor Hydro One hs future plns for new power trnsmission corridor within West Brmpton nd Southest Hlton to service future development in North West Brmpton nd north into Cledon. The need for new trnsmission corridor is sed on study completed y the Ontrio Power Authority (OPA)which recommends north-south trnsmission line corridor of pproximtely 37 m in width to service growth in the west prt of Peel Region. The City hs mde commitment to Hydro One to consider the fesiility of future hydro corridor in the vicinity of the proposed Brm West Prkwy. Opportunities nd constrints for potentil future hydro corridor hve een considered in the evlution of the Brm West Prkwy lignment lterntives. The potentil re within which future hydro corridor my e locted is depicted on the figure to the left. Brm West Prkwy (Finncil Drive to Heritge Rod) nd Finncil Drive (Heritge Rod to Winston Churchill Boulevrd)

35 Preliminry Design Phse Following this PIC, the preliminry preferred lterntive for Brm West Prkwy nd the preferred plnning solution for Finncil Drive will e confirmed sed on comments received from the pulic nd stkeholders, nd through further technicl ssessment y the Project Tem. Alignment lterntives will e evluted to select the preliminry preferred lignment for Finncil Drive. Design lterntives will e developed for oth Finncil Drive nd Brm West Prkwy. Preliminry design lterntives my include: lignment refinements/shifts; 407 ETR Interchnge configurtions; different cross-section configurtions; stormwter mngement, etc.. The preliminry preferred designs will e selected from these lterntives nd will e presented t PIC #2. In preprtion for preliminry design phse, typicl cross sections hve een developed for the Brm West Prkwy nd re presented on the following disply pnel. Brm West Prkwy (Finncil Drive to Heritge Rod) nd Finncil Drive (Heritge Rod to Winston Churchill Boulevrd)

36 Typicl Cross Sections Brm West Prkwy Brm West Prkwy (Finncil Drive to Heritge Rod) nd Finncil Drive (Heritge Rod to Winston Churchill Boulevrd)

37 Next Steps The next steps for the Clss Environmentl Assessment Study re: Review comments nd suggestions received from the pulic nd gencies nd incorporte into the study, s pproprite nd respond to written questions nd comments, s requested; Confirm the preferred lignment for Brm West Prkwy nd the preferred plnning solution for Finncil Drive; Evlute lterntives lignments nd select the preliminry preferred lignment for Finncil Drive; Crry out the preliminry design of Brm West Prkwy nd Finncil Drive; nd Conduct second round of Pulic Consulttion in Fll 2012 to present nd request input on the preliminry designs. Brm West Prkwy (Finncil Drive to Heritge Rod) nd Finncil Drive (Heritge Rod to Winston Churchill Boulevrd)

CHAPTER #10 FUTURE LAND USE

CHAPTER #10 FUTURE LAND USE CHAPTER #10 FUTURE LAND USE CHAPTER 10: FUTURE LAND USE TABLE OF CONTENTS Introduction... 10-1 Lnd Use Vision... 10-1 Bckground... 10-2 Resident Opinions Regrding the Future of Buchnn... 10-2 Community

More information

CITY of LOMPOC 2030 General Plan

CITY of LOMPOC 2030 General Plan CIY of LOMPOC 2030 Generl Pln URBAN DEIGN ELEMEN INRODUCION AND AUHORIY he Urbn Design Element is n optionl element tht ddresses the visul chrcter of Lompoc. he Urbn Design Element provides dditionl direction,

More information

Overview. for almost 200 years, pattern books have been used throughout. introduction a 1

Overview. for almost 200 years, pattern books have been used throughout. introduction a 1 Aeril view of the Est Grrison s it exists tody on the former Fort Ord Est Grrison tody Mediterrnen Revivl precedent Courtesy of JBZ Architecture + Plnning Picturesque Cmp precedent Grrison Crftsmn precedent

More information

IV. FORM-BASED CODE TEMPLATE: Sample Neighborhood Regulating Plans and Code Definitions

IV. FORM-BASED CODE TEMPLATE: Sample Neighborhood Regulating Plans and Code Definitions IV. FORM-BASED CODE TEMPLATE: Smple Neighorhood Regulting Plns nd Code Definitions This chpter is orgnized in three sections: Introduction to Neighorhood Regulting Plns, Definitions, nd Smple Neighorhood

More information

Use of LS 213 During Rooting of Vegetative Ornamental Cuttings: Experiment 1

Use of LS 213 During Rooting of Vegetative Ornamental Cuttings: Experiment 1 NC STATE UNIVERSITY Floriculture Reserch Deprtment of Horticulturl Science Horticulturl Reserch Series No. 15 My 1 Use of LS 1 During Rooting of Vegettive Ornmentl Cuttings: Experiment 1 Brin E. Whipker,

More information

Shoot Growth Characteristics Following Mechanical Hedging and High Limb Pruning in Tulare Walnuts on Two Rootstocks at Two Spacings

Shoot Growth Characteristics Following Mechanical Hedging and High Limb Pruning in Tulare Walnuts on Two Rootstocks at Two Spacings Shoot Growth Chrcteristics Following Mechnicl Hedging nd High Lim Pruning in Tulre Wlnuts on Two Rootstocks t Two Spcings B.D. Lmpinen, S.G. Metclf, V. Gmle, K. Moore nd W. Reil University of Cliforni

More information

CITY OF RED DEER June 2013

CITY OF RED DEER June 2013 CITY OF RED DEER June 2013 Bylw No.: 3217/B-2013 Approved by Council Resolution August 19, 2013 1.0 INTRODUCTION... 1 1.1 BACKGROUND...1 1.2 PURPOSE...1 1.3 DEFINITION OF PLAN AREA...1 TABLE OF CONTENTS

More information

deltaclima CoolWall We provide you with the perfect air-conditioning solution for your computer centre!

deltaclima CoolWall We provide you with the perfect air-conditioning solution for your computer centre! deltclim CoolWll We provide you with the perfect ir-conditioning solution for your computer centre! Weiss Klimtechnik GmbH Pssion for Climte deltclim CoolWll Greter performnce, lower energy consumption,

More information

AGENDA REPORT. Multilateral Operating Agreement for Open Burning

AGENDA REPORT. Multilateral Operating Agreement for Open Burning Ov LAN er mipit 1 LORID AGENDA REPORT DATE August 22 2011 TO FROM SUBJECT City Commission Gregory Horwedel City Mnger Multilterl Operting Agreement for Open Burning RECOMMENDATION Tht the City Commission

More information

Low Impact Development in Northern Nevada: An Introduction

Low Impact Development in Northern Nevada: An Introduction Nonpoint Eduction for Municipl Officils www.unce.unr.edu/nemo Protecting wter qulity through community plnning Fct Sheet FS-09-22 Low Impct Development in Northern Nevd: An Introduction Benefits of LID

More information

Chapter 4: Recommendations for Future Development

Chapter 4: Recommendations for Future Development Chpter 4 Chpter 4: Recommendtions Chpter 4: Recommendtions for Future Development Trnsforming Lrgo Town Center The Wshington Metropolitn Are s economy is one of the strongest regionl economies in the

More information

Original operating instructions

Original operating instructions Originl operting instructions SLS 96 Protective throughem photoelectric sensors Dimensioned drwing en 09-2010/11 602075 65m 39m 10-30 V DC 500 Hz Protective throughem photoelectric sensor with high performnce

More information

WATER RESOURCE CONSERVATION, QUALITY AND EFFICIENCY

WATER RESOURCE CONSERVATION, QUALITY AND EFFICIENCY CHAPTER 6 WATER RESOURCE CONSERVATION, QUALITY AND EFFICIENCY SECTION 601 (IgCC 701) GENERAL 601.1 (IgCC 701.1) Scope. The provisions of this chpter shll estblish the mens of conserving wter, protecting

More information

Evaluating Kaolin Clay as an Amendment to Container Substrates

Evaluating Kaolin Clay as an Amendment to Container Substrates Evluting Kolin Cly s n Amendment to Continer Sustrtes Jmes T. Midcp nd Theodore E. Bilderck Deprtment of Horticulture - Athens & Rleigh The University of Georgi & North Crolin Stte University Nture of

More information

GREEN INFRASTRUCTURE FEASIBILITY STUDY NORTH BERGEN

GREEN INFRASTRUCTURE FEASIBILITY STUDY NORTH BERGEN GREEN INFRASTRUCTURE FEASIBILITY STUDY NORTH BERGEN ACKNOWLEDGEMENTS Designed to highlight green infrstructure opportunities within the Township of North Bergen, this document hs been prepred by the Rutgers

More information

Original operating instructions

Original operating instructions Originl operting instructions SLSR 25B Protective throughem photoelectric sensor Dimensioned drwing en 06-2015/02 50110388-04 0 22m 10-30 V DC 100 Hz Protective throughem photoelectric sensor with visile

More information

Evaluation of Willow Propagation Methods FHWA Canyonville 5 Project

Evaluation of Willow Propagation Methods FHWA Canyonville 5 Project Evlution of Willow Propgtion Methods FHWA Cnyonville 5 Project Dvid Steinfeld November 2007 Summry: Willows tht were plnted s rooted cuttings becme estblished t much greter rte thn those from live stkes

More information

Intruder Alarm Kit IA-210 IA-220 IA-230

Intruder Alarm Kit IA-210 IA-220 IA-230 Intruder Alrm Kit IA-210 IA-220 IA-230 Quick Strt Guide The smrter wy to protect your home. Thnk you for choosing the Yle Intruder Alrm System. This simple to instll system hs been designed with the user

More information

The Use of Naphthaleneacetic Acid (NAA) to Control Vegetative Vigor in Avocado Trees

The Use of Naphthaleneacetic Acid (NAA) to Control Vegetative Vigor in Avocado Trees Cliforni Avocdo Society 27 Yerook 9: 131-148 Mry Lu Arpi Deprtment of Botny nd Plnt Sciences University of Cliforni, Riverside Muricio Tpi ACW Frm Fllrook, Cliforni Reuen Hofshi vocdosource.com Fllrook,

More information

CASA PALAZZO BORIVALI (E)

CASA PALAZZO BORIVALI (E) CASA PALAZZO BORIVALI (E) Get Wow'ed At First Look! Cs Plzzo the nme itself defines the project i.e live life king style t your plce like home. W O W o G t y d y r e ev o z z l P s C World Clss Amenities

More information

SNA Research Conference Vol Weed Control Mengmeng Gu Section Editor and Moderator Weed Control Section

SNA Research Conference Vol Weed Control Mengmeng Gu Section Editor and Moderator Weed Control Section SNA Reserch Conference Vol. 53 2008 Weed Control Mengmeng Gu Section Editor nd Modertor Weed Control Section 559 SNA Reserch Conference Vol. 53 2008 Evlution of Pendimethlin + Dimethenmid-P for Reltive

More information

The Cultural Heart PUD ATTACHMENT 1 CONNECTING TO WHAT WE HEARD

The Cultural Heart PUD ATTACHMENT 1 CONNECTING TO WHAT WE HEARD 01 The Culturl Hert A legible, trnsformtive, nd nimted spce tht unites Olympic Plz nd the Municipl Plz s the Culturl Hert of the Centre City. CONNECTING TO WHAT WE HEARD Citizen nd Stkeholder Enggement,

More information

The Effect of a green roof on thermal comfort and learning performance in a naturally ventilated classroom in a hot and humid climate

The Effect of a green roof on thermal comfort and learning performance in a naturally ventilated classroom in a hot and humid climate The Effect of green roof on therml comfort nd lerning performnce in nturlly ventilted clssroom in hot nd humid climte Spekers: Hung, Wen-Pin 1 ; Ruey-Lung, Hwng 2 ; Kuo-Tsng Hung 3 1 Feng Chi University,

More information

YZ667A1060. Wireless Domestic Heating Zoning System 1 GENERAL 2 TECHNICAL INFORMATION TABLE OF CONTENTS INSTALLATION GUIDE

YZ667A1060. Wireless Domestic Heating Zoning System 1 GENERAL 2 TECHNICAL INFORMATION TABLE OF CONTENTS INSTALLATION GUIDE YZ667A060 Wireless Domestic Heting Zoning System INSTALLATION GUIDE GENERAL HC60NG Rely Module CM67z Room Unit HR80UK Rditor Controllers TABLE OF CONTENTS Section Pge Generl... Technicl Informtion... 3

More information

Building Technologies HVAC Products

Building Technologies HVAC Products 7 451 Burner Controls LFL1... Burner controls For gs, oil or dul-fuel forced drft urners of medium to high cpcity For multistge or modulting urners in intermittent opertion With checked ir dmper control

More information

Available online at ScienceDirect. Procedia Engineering 161 (2016 ) Marek Zagroba a, *

Available online at   ScienceDirect. Procedia Engineering 161 (2016 ) Marek Zagroba a, * Aville online t www.sciencedirect.com ScienceDirect Procedi Engineering 161 (2016 ) 221 225 World Multidisciplinry Civil Engineering-Architecture-Urn Plnning Symposium 2016, WMCAUS 2016 Issues of the Revitliztion

More information

Special Research Report #532 Production Technology Using Soil Moisture Sensors for Poinsettia Height Control

Special Research Report #532 Production Technology Using Soil Moisture Sensors for Poinsettia Height Control Specil Reserch Report #532 Production Technology Using Soil Moisture Sensors for Poinsetti Height Control Alem Peter 1, Pul Thoms 1, Mrc vn Iersel 1, nd Stephnie Burnett 2 1 Deprtment of Horticulture,

More information

The following documentation is an electronicallysubmitted vendor response to an advertised solicitation from the West Virginia Purchasing Bulletin

The following documentation is an electronicallysubmitted vendor response to an advertised solicitation from the West Virginia Purchasing Bulletin The following documenttion is n electronicllysubmitted vendor response to n dvertised solicittion from the West Virgini Purchsing Bulletin within the Vendor Self Service portl t wvoasis.gov. As prt of

More information

GREEN INFRASTRUCTURE FEASIBILITY STUDY NEWARK

GREEN INFRASTRUCTURE FEASIBILITY STUDY NEWARK GREEN INFRASTRUCTURE FEASIBILITY STUDY NEWARK ACKNOWLEDGEMENTS Designed to highlight green infrstructure opportunities within the City of Newrk, this document hs been prepred by the Rutgers Coopertive

More information

unique setting of natural scenic beauty a valley of rolling hills distinctive knolls and oak trees surrounded by mountains and

unique setting of natural scenic beauty a valley of rolling hills distinctive knolls and oak trees surrounded by mountains and RESOLUTION NO 200S 0ll A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF THOUSAND OAKS REVISING THE ARCHITECTURAL DESIGN REVIEW GUIDELINES AND STANDARDS FOR EVALUATING THE CONSTRUCTION AND MODIFICATION OF

More information

Cabbage Transplant Production Using Organic Media, 2008

Cabbage Transplant Production Using Organic Media, 2008 Cge Trnsplnt Production Using Orgnic Medi, 2008 Anu Rngrjn, Cornell University, Deprtment of Horticulture, r47@cornell.edu Betsy Leonrd, Cornell University, Deprtment of Horticulture, i1@cornell.edu Allison

More information

Table of Contents. Executive Summary. Results-at-a-Glance. Acknowledgements. List of Tables. List of Figures. Introduction 1.

Table of Contents. Executive Summary. Results-at-a-Glance. Acknowledgements. List of Tables. List of Figures. Introduction 1. Protocol for Irrigtion of Shrubs During Estblishment: Estblishing Best Mngement Irrigtion Prctices for Shrub Estblishment in Florid Lndscpes Edwrd F. Gilmn, Professor; Christine Wiese, Biologist; Amy Shober,

More information

Smoke control dampers

Smoke control dampers X X testregistrierung Smoke control dmpers Type with BLE- ctutor CE complint ccording to Europen regultions For mechnicl smoke extrct systems nd s n dditionl supply ir inlet Rectngulr smoke control dmpers

More information

Management Approaches for Thrips and Garden Symphylans in Lettuce

Management Approaches for Thrips and Garden Symphylans in Lettuce REPORT 1: Grden symphyln Project Title Mngement Approches for Thrips nd Grden Symphylns in Lettuce Project Investigtor Dr. Shimt Villnssery Joseph IPM Entomology Advisor University of Cliforni Coopertive

More information

Building Technologies Division

Building Technologies Division 7 451 Burner Controls LFL1... Burner controls For gs, oil or dul-fuel forced drft urners of medium to high cpcity For multistge or modulting urners in intermittent opertion With checked ir dmper control

More information

5 questions to help you understand bay end panels. Q1. What are Bayend Panels made from? Bay End Panels are made from EO Particle or EO MDF Board.

5 questions to help you understand bay end panels. Q1. What are Bayend Panels made from? Bay End Panels are made from EO Particle or EO MDF Board. BAY END PANELS 5 questions to help you understnd by end pnels Q1. Wht re Byend Pnels mde from? By End Pnels re mde from EO Prticle or EO MDF Bord. Q2. Wht is EO? EO reltes to the Glue used to hold together

More information

Performance evaluation of displacement ventilation system combined with a novel evaporative cooled ceiling for a typical office in the city of Beirut

Performance evaluation of displacement ventilation system combined with a novel evaporative cooled ceiling for a typical office in the city of Beirut Avilble online t www.sciencedirect.com ScienceDirect Energy Procedi 75 (2015 ) 1728 1733 The 7 th Interntionl Conference on Applied Energy ICAE2015 Performnce evlution of displcement ventiltion system

More information

STORAGE OF HARDWOOD PLANTING STOCK: EFFECTS OF VARIOUS STORAGE REGIMES AND PACKAGING METHODS ON ROOT GROWTH AND PHYSIOLOGICAL QUALITY

STORAGE OF HARDWOOD PLANTING STOCK: EFFECTS OF VARIOUS STORAGE REGIMES AND PACKAGING METHODS ON ROOT GROWTH AND PHYSIOLOGICAL QUALITY No. 1 83 SORAGE OF HARDWOOD PANING SOCK: EFFECS OF VARIOUS SORAGE REGIMES AND PACKAGING MEHODS ON ROO GROWH AND PHYSIOOGICA QUAIY D. P. WEBB nd F. W. von AHEN Gret kes Forest Reserch Centre, P.O. Box 49,

More information

MANAGEMENT TECHNIQUES FOR WEED CONTROL IN ALFALFA. William H. Isom. Extension Agronomist University of California, Riverside

MANAGEMENT TECHNIQUES FOR WEED CONTROL IN ALFALFA. William H. Isom. Extension Agronomist University of California, Riverside MNGEMENT TECHNIQUES FOR WEE CONTROL IN LFLF Willim H. Isom. Extension gronomist University of Cliforni, Riverside Vern Le Mrle. Extension gronomist University of Cliforni. vis Poor irrigtion mngement nd

More information

Use. Mechanical design

Use. Mechanical design 7 451 ISO9001 Gs Burner Controls LFL1... Supplementry dt sheet 7712 Gs urner controls for gs, oil or dul-fuel forced drught urners of medium to high cpcity. ultistge or modulting urners in intermittent

More information

Managing Soilborne Diseases Through Removal of Root Inoculum in Red Raspberry

Managing Soilborne Diseases Through Removal of Root Inoculum in Red Raspberry Mnging Soilborne Diseses Through Removl of Root Inoculum in Red Rspberry L.W. DeVetter1, I. Zsd2, J. Weilnd2, T. Wlters3, R. Rudolph4, S. Wtkinson5, Mrk Mzzol6, nd Suzette Glinto7 1Assistnt Professor,

More information

The growth of camellia in growth media containing composted organic wastes of peanut

The growth of camellia in growth media containing composted organic wastes of peanut Aville online t www.pelgireserchlirry.com Pelgi Reserch Lirry Europen Journl of Experimentl Biology, 2014, 4(1):608-612 ISSN: 2248 9215 CODEN (USA): EJEBAU The growth of cmelli in growth medi contining

More information

Timing of snowmelt. SnoEco

Timing of snowmelt. SnoEco SnoEco: High Arctic ecosystem responses to chnges in snow cover Elisbeth J. Cooper - study t the plot nd lndscpe scle UiT- The Arctic University of Norwy Tromsø, Norwy Timing of snowmelt..is very importnt

More information

The effect of plant hormone gibberellic acid on germination indices Secale montanum in vitro and pot experiments under drought conditions

The effect of plant hormone gibberellic acid on germination indices Secale montanum in vitro and pot experiments under drought conditions Aville online t www.scholrsreserchlirry.com Annls of Biologicl Reserch, 2013, 4 (6):1-9 (http://scholrsreserchlirry.com/rchive.html) ISSN 0976-1233 CODEN (USA): ABRNBW The effect of plnt hormone gierellic

More information

Heritage Road Improvements from Steeles Avenue to Rivermont Road

Heritage Road Improvements from Steeles Avenue to Rivermont Road The Corporation of the City of Brampton Heritage Road Improvements from Steeles Avenue to Rivermont Road Class Environmental Assessment Study (Schedule C) September 19, 2013 The Corporation of the City

More information

Massachusetts Agricultural Experiment Station

Massachusetts Agricultural Experiment Station November 2002 ANNUAL REPORT TO NC-140 Msschusetts Agriculturl Experiment Sttion Wesley Autio (leder), Jon Clements, Jmes Krup, Dune Greene, & Dniel Cooley PROGRESS & PRINCIPAL ACCOMPLISHMENTS 1994 NC-140

More information

HT/O Outside Humidity and Temperature Sensor

HT/O Outside Humidity and Temperature Sensor Instlltion Instructions Outside Humidity nd Temperture Sensor Importnt: Retin these instructions Contents 1 Unpcking...1 2 Instlltion...1 3 Fult Finding...4 4 Mintennce...5 5 Disposl...8 1 Unpcking Instlltion

More information

INSTRUCTIONS FOR INSTALLATION AND USE

INSTRUCTIONS FOR INSTALLATION AND USE INSTRUCTIONS FOR INSTALLATION AND USE SAUNA HEATER 7-0-780 7-45-780 7-60-780 7-80-780 7-90-780 We wish you mny hours of relxtion nd plesure in your sun. Plese red the instructions eneth very crefully in

More information

Why plant flowers? Why Plant Flowers? Using Natural Enemies to Control Pests. Conserving Natural Enemies. To attract natural enemies.

Why plant flowers? Why Plant Flowers? Using Natural Enemies to Control Pests. Conserving Natural Enemies. To attract natural enemies. Using Nturl Enemies to Control Pests Using Nturl Enemies to Control Pests Conservtion of Nturl Enemies Why plnt flowers in your lndscpe nd grden Alterntive insecticides Using ACORN Alterntive Control Guide

More information

Effects of Irrigation Volume and Frequency on Shrub Establishment in Florida 1

Effects of Irrigation Volume and Frequency on Shrub Establishment in Florida 1 Effects of Irrigtion Volume nd Frequency on Shru Estlishment in Florid E.F. Gilmn, C.L. Wiese 3, M. Pz 3, A.L. Shoer 4, S.M. Scheier 5, K.A. Moore 6, nd M. Brennn 7 Deprtment of Environmentl Horticulture

More information

ASSA ABLOY Security Doors. High performance steel and timber security doors. The global leader in door opening solutions

ASSA ABLOY Security Doors. High performance steel and timber security doors. The global leader in door opening solutions ASSA ABLOY Security Doors High performnce steel nd timber security doors The globl leder in door opening solutions About ASSA ABLOY Security Doors High Performnce Steel nd Timber Security Doors UK s leding

More information

Maxum edition II Siemens Applied Automation

Maxum edition II Siemens Applied Automation Mxum edition II Automtion The Joining Of Two Powers Automtion - the chromtogrph leder in the Germn chemicls industry Automtion - the world-wide chromtogrph leder in hydrocrbon processing mesurement 2*40

More information

Efficacy of Boom Systems in Limiting Runoff on Center Pivots

Efficacy of Boom Systems in Limiting Runoff on Center Pivots Efficcy of Boom Systems in Limiting Runoff on Center Pivots Authors: Prossie Nkwuk, Ph.D. CGIAR (Consortium of Interntionl Agriculturl Reserch) Ethiopi P.Nkwuk@cgir.org R.Troy Peters, P.E., Ph.D. Wshington

More information

YOUR VACUUM DRYING SPECIALIST

YOUR VACUUM DRYING SPECIALIST YOUR VACUUM DRYING SPECIALIST Innovtive by trdition Founded in 1939, in one of the most highly industrilized re of its dy, Itlvcuum hs lwys mnufctured vcuum pumps nd vcuum dryers for the min production

More information

Fire dampers. Type FKA-3.8. For diverse applications

Fire dampers. Type FKA-3.8. For diverse applications . X X testregistrierung Fire dmpers Type with fusible link for 7 C or 95 C For diverse pplictions Rectngulr fire dmper for the isoltion of duct penetrtions between fire comprtments, for mortr-bsed instlltion

More information

Fire dampers. Type FK-EU. For diverse applications

Fire dampers. Type FK-EU. For diverse applications . X X testregistrierung Type with fusible link for 72 C or 95 C CE complint ccording to Europen regultions With TROXNETCOM s n option ATEX certifiction For diverse pplictions Rectngulr fire dmper for the

More information

Fire dampers. Type FK-EU. For diverse applications

Fire dampers. Type FK-EU. For diverse applications . X X testregistrierung Fire dmpers Type with fusible link for 72 C or 95 C CE complint ccording to Europen regultions With TROXNETCOM s n option ATEX certifiction For diverse pplictions Rectngulr fire

More information

MCFH-A24WV [FLARE CONNECTION TYPE]

MCFH-A24WV [FLARE CONNECTION TYPE] Floor nd Ceiling Type Air-Conditioner MCFH-A24WV [FLARE CONNECTION TYPE] HFC utilized R40A INSTALLATION MANUAL CONTENTS. THE FOLLOWING SHOULD ALWAYS BE OBSERVED FOR SAFETY... 2 2. SELECTING THE INSTALLATION

More information

MCFZ-A18WV MCFZ-A24WV [FLARE CONNECTION TYPE]

MCFZ-A18WV MCFZ-A24WV [FLARE CONNECTION TYPE] Floor nd Ceiling Type Air-Conditioner MCFZ-A8WV MCFZ-A24WV [FLARE CONNECTION TYPE] HFC utilized R40A INSTALLATION MANUAL CONTENTS. THE FOLLOWING SHOULD ALWAYS BE OBSERVED FOR SAFETY... 2 2. SELECTING THE

More information

SNA Research Conference Vol Growth Regulators Yan Chen Section Editor Plant Growth Regulators

SNA Research Conference Vol Growth Regulators Yan Chen Section Editor Plant Growth Regulators Growth Regultors Yn Chen Section Editor Plnt Growth Regultors 152 Mnging Knock Out Rose nd Loropetlum Growth in the Lndscpe with Cutless.33G Yn Chen, Allen Owings, Regin Brcy, Joey Queedeux 21549 Old Covington

More information

Sensitive Analysis of Passive Dehumidification System using Solar Heat

Sensitive Analysis of Passive Dehumidification System using Solar Heat Sensitive Anlysis of Pssive Dehumidifiction System using Solr Het Hksung Lee 1, Akihito Ozki 2, Myonghyng Lee 3 1 Grdute student, Kyushu University, Fukuok, Jpn 2 Professor, Kyushu University, Fukuok,

More information

User reference guide. Daikin room air conditioner FTXP20L2V1B FTXP25L2V1B FTXP35L2V1B. User reference guide Daikin room air conditioner.

User reference guide. Daikin room air conditioner FTXP20L2V1B FTXP25L2V1B FTXP35L2V1B. User reference guide Daikin room air conditioner. FTXP20L2V1B FTXP25L2V1B FTXP35L2V1B English Tble of contents Tble of contents 1 Generl sfety precutions 2 1.1 About the documenttion... 2 1.1.1 Mening of wrnings nd symbols... 2 1.2 For the user... 2 2

More information

Vigor control in McIntosh apple trees by growth inhibitors

Vigor control in McIntosh apple trees by growth inhibitors Vigor control in McIntosh pple trees y growth inhiitors L. Rufto 1, A.F. Brighenti 1, A.D. Rufto 2, L.I. Dominguez 3 nd T.L. Roinson 3 1Snt Ctrin Stte University (UDESC), College of Agric. nd Life Science,

More information

Public Information Centre No.2. Bram West Parkway. From Financial Drive to Heritage Road. and. Financial Drive

Public Information Centre No.2. Bram West Parkway. From Financial Drive to Heritage Road. and. Financial Drive WELCOME Public Information Centre No.2 Bram West Parkway From Financial Drive to Heritage Road and Financial Drive From Heritage Road to Winston Churchill Boulevard Municipal Class Environmental Assessment

More information

Installation and user manual for the integrated washer-dryer machine

Installation and user manual for the integrated washer-dryer machine Instlltion nd user mnul for the integrted wsher-dryer mchine SELECT Built-in Wshing Mchine WDI1200NM wshing mchine contents WARNINGS SPECIFICATIONS INSTALLATION AND ASSEMBLY USING THE APPLIANCE. PRACTICAL

More information

Asparagus. Tuesday morning 9:00 am. Moderator: Gene Kokx Jr., Michigan Vegetable Council Board of Directors. 9:00 a.m. Asparagus Virus Survey

Asparagus. Tuesday morning 9:00 am. Moderator: Gene Kokx Jr., Michigan Vegetable Council Board of Directors. 9:00 a.m. Asparagus Virus Survey Asprgus Tuesdy morning 9: m Modertor: Gene Kokx Jr., Michign Vegetble Council Bord of Directors 9:.m. Asprgus Virus Survey Norm Myers, Ocen Co. MSU Extension 9:15.m. Asprgus Disese Updte Mry Husbeck, Plnt

More information

Shade and flowering trees for bareroot sales throughout

Shade and flowering trees for bareroot sales throughout EM 9013-E October 2010 Breroot Shde, Flowering, nd Fruit Trees (Willmette Vlley) J. Owen, D. Sullivn, D. Horneck, nd J. Hrt Summry Preplnt nutrient ppliction ph djustment Apply lime or elementl sulfur

More information

Statement of Qualifications on Landfills with Geosynthetics

Statement of Qualifications on Landfills with Geosynthetics Sttement Qulifictions on Lndfills with Geosynthetics Dr. J.P. Giroud is certinly one the engineers who hd the deepest influence on modern lndfill design. Dr. Giroud, considered the fther geosynthetic liner

More information

INSTALLER REFERENCE GUIDE

INSTALLER REFERENCE GUIDE INSTALLER REFERENCE GUIDE + ERHQ0BA ERHQ04BA ERHQ06BA ERLQ0CA ERLQ04CA ERLQ06CA EHVH6S8CA EHVH6S6CA EHVX6S8CA EHVX6S6CA Tble of contents Tble of contents About the documenttion. About this document...

More information

WDi2201 Installation and user manual for the integrated washer-dryer machine

WDi2201 Installation and user manual for the integrated washer-dryer machine WDi2201 Instlltion nd user mnul for the integrted wsher-dryer mchine SELECT wshing mchine contents WARNINGS SPECIFICATIONS INSTALLATION AND ASSEMBLY USING THE APPLIANCE. PRACTICAL TIPS MAINTENANCE AND

More information

Before using this product, read these instructions thoroughly and keep this manual for future reference.

Before using this product, read these instructions thoroughly and keep this manual for future reference. AIR CONDITIONER Wll Mounted Type ASTG8KMCA ASTGKMCA ASTGKMCA Before using this product, red these instructions thoroughly nd keep this mnul for future reference. Sfety Precutions R REFRIGERANT This Air

More information

MCFZ-A12WV MUZ-A12YV(H) [FLARE CONNECTION TYPE]

MCFZ-A12WV MUZ-A12YV(H) [FLARE CONNECTION TYPE] Floor nd Ceiling Type Air-Conditioner MCFZ-A2WV MUZ-A2YV(H) [FLARE CONNECTION TYPE] HFC utilized R40A INSTALLATION MANUAL CONTENTS. THE FOLLOWING SHOULD ALWAYS BE OBSERVED FOR SAFETY... 2 2. SELECTING

More information

Grading Metrics for Accreditation Standards. (Total carpet area of the Classroom) / Capacity of the Classroom in terms of number of trainees

Grading Metrics for Accreditation Standards. (Total carpet area of the Classroom) / Capacity of the Classroom in terms of number of trainees Annexure 1 Accredittion Stndrds Grding Metrics Accredittion Stndrds hve been clssified into two prts: S. No. Accredittion Stndrd Prt-A (A.1) Common Stndrds 1 Clssroom re/ Cpcity of Clssroom ( For ech Clssroom):

More information

KompaKt. air Handling Units

KompaKt. air Handling Units ir Hndling Units KompKt escription of Komfovent kompkt units 2 KOMPAKT REGO RHP 3 Resons to choose Komfovent kompkt units 4 ontrol System 6 KOMFOVENT KOMPAKT REGO 10 Rotry Het Exchnger 11 Stndrd Sizes

More information

Fire dampers. Type FKA-EU. For diverse applications

Fire dampers. Type FKA-EU. For diverse applications . X X testregistrierung Fire dmpers Type with fusible link for 72 C CE complint ccording to Europen regultions For diverse pplictions Rectngulr fire dmper for the isoltion of duct penetrtions between two

More information

DAILY REFERENCE GUIDE

DAILY REFERENCE GUIDE DAILY REFERCE GUIDE THANK YOU FOR BUYING A WHIRLPOOL PRODUCT. In order to receive more complete ssistnce, plese register your pplince on www.whirlpool.eu/register Before using the pplince crefully red

More information

24" Built-In Dishwasher. Installation Instructions HDBL655AFS HDBL655AFW HDBL655AFB

24 Built-In Dishwasher. Installation Instructions HDBL655AFS HDBL655AFW HDBL655AFB 24" Built-In Dishwsher Instlltion Instructions HDBL655AFS HDBL655AFW HDBL655AFB TABLE OF CONTENTS DISHWASHER SAFETY... 2 INSTALLATION REQUIREMENTS... 3 Tools nd Prts... 3 Loction Requirements... 5 Product

More information

Effect of Topping Height and Timing on Quantity and Quality Influe-Cured Tobacco (Var.K326)

Effect of Topping Height and Timing on Quantity and Quality Influe-Cured Tobacco (Var.K326) Avilble online t http://www.ijbbr.com Interntionl journl of Advnced Biologicl nd Biomedicl Reserch Volume 2, Issue 4, 2014: 1388-1395 Effect of Topping Height nd Timing on Quntity nd Qulity Influe-Cured

More information

Yield Response of Tomato under Different Combination of Manures and Fertilizers

Yield Response of Tomato under Different Combination of Manures and Fertilizers IOSR Journl of Agriculture nd Veterinry Science (IOSR-JAVS) e-issn: 219-28, p-issn: 219-272. Volume 9, Issue 1 Ver. I (Jn. 216), PP 6-16 www.iosrjournls.org Yield Response of Tomto under Different Comintion

More information

Before using this product, read these instructions thoroughly and keep this manual for future reference.

Before using this product, read these instructions thoroughly and keep this manual for future reference. AIR CONDITIONER Wll Mounted Type Contents Sfety Precutions...En- Indoor Unit Overview nd Opertions...En- Remote Controller Overview nd Opertions...En- Timer Opertion...En- Humn Sensor (Energy Sving)...En-

More information

INSTRUCTION MANUAL ENGLISH

INSTRUCTION MANUAL ENGLISH INSTRUCTION MNUL ENGLISH Exhaust / recirculating hood Contents 1 GENERL SFETY GUIDELINES...3 ELECTRICL SFETY...3 PROPER USE...4 ECOLOGICL DISPOSL...4 REFERENCE STNDRDS...4 COMPONENTS...5 DIMENSIONS...6

More information

Propagation, Production, and Landscape Evaluation of Native Wildflowers in West, Central and South Florida, 2010 Condensed Progress Report

Propagation, Production, and Landscape Evaluation of Native Wildflowers in West, Central and South Florida, 2010 Condensed Progress Report Propgtion, Production, nd Lndscpe Evlution of Ntive Wildflowers in West, Centrl nd South Florid, Condensed Progress Report. Project Investigtors Sndr B. Wilson, Professor Hector Perez, Assistnt Professor

More information

Acta Sci. Pol. Hortorum Cultus, 17(5) 2018,

Acta Sci. Pol. Hortorum Cultus, 17(5) 2018, www.ct.medi.pl ORIGINAL PAPER Act Sci. Pol. Hortorum Cultus, 17(5) 2018, 191 198 1644-0692 e-issn 2545-1405 DOI: 10.24326/sphc.2018.5.17 Accepted: 4.04.2018 ROOT GROWTH CHARACTERISTICS OF KHATOUNI MELON

More information

REDUCTION OF THE TREE PRODUCTION CYCLE OF IN VITRO

REDUCTION OF THE TREE PRODUCTION CYCLE OF IN VITRO REDUCTION OF THE TREE PRODUCTION CYCLE OF IN VITRO PROPAGATED STANLEY PLUM CULTIVAR AND THE TREE BEHAVIOUR IN AN ORCHARD. 2. REPRODUCTIVE BEHAVIOR STANLEY PLŪMJU PAVAIROŠANAS CIKLA SAĪSINĀŠANA, IZMANTOJOT

More information

INSTRUCTION MANUAL BUILT-IN OVEN SFA4130VC SFA4130VCB SFA4130VCN SFA4395VCX

INSTRUCTION MANUAL BUILT-IN OVEN SFA4130VC SFA4130VCB SFA4130VCN SFA4395VCX INSTRUCTION MANUAL BUILT-IN OVEN EN SFA4130VC SFA4130VCB SFA4130VCN SFA4395VCX ENGLISH 1 Der customer, we would like to thnk you for your confidence in us. 1 By choosing one of our products, you hve opted

More information

Application of Pheromones for Controlling Stored-Product Insects. Tom Phillips Oklahoma State University

Application of Pheromones for Controlling Stored-Product Insects. Tom Phillips Oklahoma State University Appliction of Pheromones for Controlling Stored-Product Insects Tom Phillips Oklhom Stte University Pheromones for Stored Product Insects Pheromones known for > 40 species Lures vilble for 20 species;

More information

Leaf and Soil Analysis Special Edition

Leaf and Soil Analysis Special Edition Volume 11, Number 8b August 15, 2012 Lef nd Soil Anlysis Specil Edition Commercil berry growers in the Northest hve trditionlly mde stndrdized fertilizer pplictions bsed on crop ge. This prctice continues

More information

BRITAIN S SPECIALIST GARAGE DOOR INSTALLATION COMPANY FOR YOUR FREE ESTIMATE * AND FRIENDLY ADVICE CALL ACCESS GARAGE DOORS THE BRAND YOU CAN TRUST - PUTTING OUR CUSTOMERS FIRST FOR OVER 40 YEARS 0800

More information

Journal of Agriculture and Life Sciences ISSN (Print), (Online) Vol. 4, No. 1, June 2017

Journal of Agriculture and Life Sciences ISSN (Print), (Online) Vol. 4, No. 1, June 2017 Journl of Agriculture nd Life Sciences ISSN 2375-4214 (Print), 2375-4222 (Online) Vol. 4, No. 1, June 217 Effects of Chemicl Form nd Nitrogen Concentrtion of Fertilizer nd Wter Culture Medium ph on Growth

More information

Rootstock Effects on Deficit-Irrigated Winegrapes in a Dry Climate: Vigor, Yield Formation, and Fruit Ripening

Rootstock Effects on Deficit-Irrigated Winegrapes in a Dry Climate: Vigor, Yield Formation, and Fruit Ripening Rootstock Effects on Deficit-Irrigted Winegrpes in Dry Climte: Vigor, Yield Formtion, nd Fruit Ripening Mrkus Keller, 1 * Lynn J. Mills, 2 nd Jmes F. Hrertson 3 Astrct: A rootstock field tril ws conducted

More information

NUTRIENT UPTAKE BY HYBRID POPLAR IN COMPETITION WITH WEED SPECIES UNDER GROWTH CHAMBER AND FIELD CONDITIONS USING THE SOIL SUPPLY AND NUTRIENT

NUTRIENT UPTAKE BY HYBRID POPLAR IN COMPETITION WITH WEED SPECIES UNDER GROWTH CHAMBER AND FIELD CONDITIONS USING THE SOIL SUPPLY AND NUTRIENT NUTRIENT UPTAKE BY HYBRID POPLAR IN COMPETITION WITH WEED SPECIES UNDER GROWTH CHAMBER AND FIELD CONDITIONS USING THE SOIL SUPPLY AND NUTRIENT DEMAND (SSAND) MODEL A Thesis Submitted to the College of

More information

NOTES X X GENERAL NOTES: architects planners interiors X X 1. EXISTING DEVICES AND EQUIPMENT NOT SHOWN ARE TO REMAIN. X X 2. RETURN ALL LIGHT FIXTURES

NOTES X X GENERAL NOTES: architects planners interiors X X 1. EXISTING DEVICES AND EQUIPMENT NOT SHOWN ARE TO REMAIN. X X 2. RETURN ALL LIGHT FIXTURES GENERL :. EISTING DEVICES ND EQUIPMENT NOT SHOWN RE TO REMIN. 2. RETURN LL LIGHT FITURES REMOVED TO OWNER. FORT WORTH, TES 766 F 87-338-9245 PROJECTOR SCREEN SWITCH HURST, TES 76053 F 87-284-5075 ER 02/7/207

More information

Expro is a key provider of reliable downhole video technology to the oil and gas industry, providing our clients with clear answers in the toughest

Expro is a key provider of reliable downhole video technology to the oil and gas industry, providing our clients with clear answers in the toughest DOWNHOLE VIDEO (DHV) exprogroup.om Expro is key provider of relible downhole video tehnology to the oil nd gs industry, providing our lients with ler nswers in the toughest environments. With the pbility

More information

Evaluation of some sour cherry rootstocks at NARIC Fruitculture Research Institute

Evaluation of some sour cherry rootstocks at NARIC Fruitculture Research Institute Evlution of some sour cherry rootstocks t NARIC Fruitculture Reserch Institute Géz Bujdosó 1 Károly Hrotkó 2 1: Ntionl Agriculturl Reserch nd Innovtion Centre Fruitculture Reserch Institute 2: Corvinus

More information

Air dehumidification by membrane with cold water for manned spacecraft environmental control

Air dehumidification by membrane with cold water for manned spacecraft environmental control Air dehumidifiction by membrne with cold wter for mnned spcecrft environmentl control Shng Yonghong,, Wng Jing, Bi Ynqing,Jin Ybin,Pei yifei, Yun Weixing 2 nd Yng Bo 2 Beijing Institute of Spcecrft Environmentl

More information

Differences in size and architecture of the potato cultivars root system and their tolerance to drought stress

Differences in size and architecture of the potato cultivars root system and their tolerance to drought stress Plnt Soil Environ. Vol. 63, 217, No. 4: 159 164 doi: 1.17221/4/217-PSE Differences in size nd rchitecture of the potto cultivrs root system nd their tolernce to drought stress Krystyn ZARZYŃSKA 1, *, Dominik

More information

ML4105, ML4115, ML8105, ML8115 Fast-Acting, Two-Position Actuators FOR FIRE/SMOKE CONTROL APPLICATIONS

ML4105, ML4115, ML8105, ML8115 Fast-Acting, Two-Position Actuators FOR FIRE/SMOKE CONTROL APPLICATIONS ML405, ML45, ML805, ML85 Fst-Acting, Two-Position Actutors FOR FIRE/SMOKE CONTROL APPLICATIONS FEATURES PRODUCT DATA APPLICATION The ML405, ML45, ML805, nd ML85 Fst-Acting, Two-Position Actutors re spring

More information

COTES ALL-ROUND THE C35 RANGE

COTES ALL-ROUND THE C35 RANGE EPERTS IN HUMIDITY MNGEMENT COTES.COM DEHUMIDIFICTION THE WY YOU WNT IT C35 DEHUMIDIFIER IDEL FOR USE IN > PHRMCEUTICL PRODUCTION FCILITIES > FOOD INDUSTRY PROCESSING FCILITIES > COLD STORES/FREEZER FCILITIES

More information

SSB800 SA SSB1000 SA SSB1000 TL

SSB800 SA SSB1000 SA SSB1000 TL WARNING: If the informtion in these instructions is not followed exctly, fire or explosion my result cusing property dmge, personl injury or deth. Do not store or use gsoline or other flmmble vpors nd

More information

Effect of new organic fertilizers on growth of strawberry cv. Elsanta Preliminary results.

Effect of new organic fertilizers on growth of strawberry cv. Elsanta Preliminary results. Effect of new orgnic fertilizers on growth of strwberry cv. Elsnt Preliminry results. Abstrct E. Mlus 1,2, L. Ss-Pszt 1, J. Ciesielsk 1 Vegettively propgted plnts of the strwberry cultivr Elsnt were grown

More information