IEC Functional Safety Assessment. GE OIL & GAS India Private Limited

Size: px
Start display at page:

Download "IEC Functional Safety Assessment. GE OIL & GAS India Private Limited"

Transcription

1 IEC Functinal Safety Assessment Prject: Masneilan Series Triple Offset Butterfly Valve Custmer: GE OIL & GAS India Private Limited Cimbatre , Tamil Nadu India Cntract Number: Q17/ Reprt N.: BHG R002 Versin V1, Revisin R1, January 31, 2018 Chris O'Brien The dcument was prepared using best effrt. The authrs make n warranty f any kind and shall nt be liable in any event fr incidental r cnsequential damages in cnnectin with the applicatin f the dcument. All rights reserved.

2 Management Summary This reprt summarizes the results f the functinal safety assessment accrding t IEC carried ut n the Masneilan Series Triple Offset Butterfly Valve Triple Offset Butterfly Valve The functinal safety assessment perfrmed by exida cnsisted f the fllwing activities: - exida assessed the develpment prcess used by GE OIL & GAS India Private Limited thrugh an audit and review f a detailed safety case against the exida certificatin scheme which includes the relevant requirements f IEC The investigatin was executed using subsets f the IEC requirements tailred t the wrk scpe f the develpment team. exida reviewed and assessed a detailed Failure Mdes, Effects, and Diagnstic Analysis (FMEDA) f the devices t dcument the hardware architecture and failure behavir. - exida perfrmed a detailed Failure Mdes, Effects, and Diagnstic Analysis (FMEDA) f the devices t dcument the hardware architecture and failure behavir. - exida reviewed field failure data t verify the accuracy f the FMEDA analysis. - exida reviewed the manufacturing quality system in use at GE OIL & GAS. The functinal safety assessment was perfrmed t the requirements f IEC 61508: ed2, 2010, SIL 3 fr mechanical cmpnents. A full IEC Safety Case was prepared using the exida Safety Case tl as the primary audit tl. Hardware prcess requirements and all assciated dcumentatin were reviewed. Envirnmental test reprts were reviewed. Als, the user dcumentatin (safety manual) was reviewed. The results f the Functinal Safety Assessment can be summarized as: The audited develpment prcess as tailred and implemented by the GE OIL & GAS India Private Limited Masneilan Series Triple Offset Butterfly Valve develpment prject, cmplies with the relevant safety management requirements f IEC SIL 3, SC 3 (SIL 3 Capable). The assessment f the FMEDA als shws that the Masneilan Series Triple Offset Butterfly Valve meets the requirements fr architectural cnstraints f an element such that it can be used t implement a SIL 2 safety functin (with HFT = 0) r a SIL 3 safety functin (with HFT = 1). This means that the Masneilan Series Triple Offset Butterfly Valve is capable fr use in SIL 3 applicatins in Lw DEMAND mde, when prperly designed int a Safety Instrumented Functin per the requirements in the Safety Manual and when using the versins specified in sectin 3 f this dcument. exida GEO R002 V1R Series Butterfly Valve IEC Assessment Reprt T-023 V4R5 exida 80 N. Main St, Sellersville, PA Page 2 f 16

3 The manufacturer will be entitled t use the Functinal Safety Lg. exida GEO R002 V1R Series Butterfly Valve IEC Assessment Reprt T-023 V4R5 exida 80 N. Main St, Sellersville, PA Page 3 f 16

4 Table f Cntents Management Summary Purpse and Scpe Tls and Methds used fr the assessment Prject Management exida Rles f the parties invlved Standards and literature used Reference dcuments Dcumentatin prvided by GE OIL & GAS India Private Limited Dcumentatin generated by exida Assessment Apprach Prduct Descriptins Masneilan Series Triple Offset Butterfly Valve IEC Functinal Safety Assessment Scheme Methdlgy Assessment level Results f the IEC Functinal Safety Assessment Lifecycle Activities and Fault Avidance Measures Functinal Safety Management Safety Requirements Specificatin and Architecture Design Hardware Design Validatin Verificatin Mdificatins User dcumentatin Hardware Assessment Terms and Definitins Status f the Dcument Liability Versin Histry Future Enhancements Release Signatures exida GEO R002 V1R Series Butterfly Valve IEC Assessment Reprt T-023 V4R5 exida 80 N. Main St, Sellersville, PA Page 4 f 16

5 1 Purpse and Scpe This dcument shall describe the results f the IEC functinal safety assessment f the GE OIL & GAS India Private Limited: Triple Offset Butterfly Valve by exida accrding t accredited exida certificatin scheme which includes the requirements f IEC 61508: ed2, The assessment has been carried ut based n the quality prcedures and scpe definitins f exida. The results f this prvides the safety instrumentatin engineer with the required failure data as per IEC / IEC and cnfidence that sufficient attentin has been given t systematic failures during the develpment prcess f the device. 1.1 Tls and Methds used fr the assessment This assessment was carried by using the exida Safety Case tl. The Safety Case tl cntains the exida scheme which includes all the relevant requirements f IEC Fr the fulfillment f the bjectives, expectatins are defined which builds the acceptance level fr the assessment. The expectatins are reviewed t verify that each single requirement is cvered. Because f this methdlgy, cmparable assessments in multiple prjects with different assessrs are achieved. The arguments fr the psitive judgment f the assessr are dcumented within this tl and summarized within this reprt. The assessment was planned by exida agreed with GE OIL & GAS India Private Limited All assessment steps were cntinuusly dcumented by exida (see [R1] t [R4]). exida GEO R002 V1R Series Butterfly Valve IEC Assessment Reprt T-023 V4R5 exida 80 N. Main St, Sellersville, PA Page 5 f 16

6 2 Prject Management 2.1 exida exida is ne f the wrld s leading accredited Certificatin Bdies and knwledge cmpanies, specializing in autmatin system safety and availability with ver 500 years f cumulative experience in functinal safety. Funded by several f the wrld s tp reliability and safety experts frm assessment rganizatins and manufacturers, exida is a glbal cmpany with ffices arund the wrld. exida ffers training, caching, prject riented system cnsulting services, safety lifecycle engineering tls, detailed prduct assurance, cyber-security and functinal safety certificatin, and a cllectin f n-line safety and reliability resurces. exida maintains a cmprehensive failure rate and failure mde database n prcess equipment based n 250 billin hurs f field failure data. 2.2 Rles f the parties invlved GE OIL & GAS India Private Limited exida Manufacturer f the Masneilan Series Triple Offset Butterfly Valve Perfrmed the hardware assessment exida Perfrmed the IEC Functinal Safety Assessment per the accredited exida scheme. GE OIL & GAS, Inc. riginally cntracted exida in August 2017 fr the IEC Functinal Safety Assessment f the abve-mentined devices. 2.3 Standards and literature used The services delivered by exida were perfrmed based n the fllwing standards / literature. [N1] IEC (Parts 1-7): 2010 Functinal Safety f Electrical/Electrnic/Prgrammable Electrnic Safety-Related Systems 2.4 Reference dcuments Dcumentatin prvided by GE OIL & GAS India Private Limited [D1] QAM 1.1, Editin 12, Rev E; 8/4/2014 Quality Manual [D2] IND U/Q, 06-Oct-2017 ISO Certificate [D3] CAP-020, C; 3/11/2013 New Instrument Prcess (CAP-020) [D4] CAP 005, Rev. H; 2/22/2012 Cntrlled Prduct Develpment Prcess [D5] Prject Artifact Sample Prject Schedule [D6] Prject Artifact Sample Mnthly Review Meeting Minutes [D7] Prject Artifact Sample Weekly Review Meeting Minutes exida GEO R002 V1R Series Butterfly Valve IEC Assessment Reprt T-023 V4R5 exida 80 N. Main St, Sellersville, PA Page 6 f 16

7 [D8] CAP-001, Rev K; 3/9/2015 Cntrlled Prduct Revisin Request [D9] PDR/ECO Frm Prduct Design Revisin Frm [D10] Prject Artifact [D11] Cimbatre MLAC 3June15.pdf [D12] QSD-02, Rev 3.1, 02-Mar-2017 [D13] QSD-03, Rev 2.2, 04-May-2017 [D14] QSP-01, Rev 1.0, 24-Jul-2015 [D15] QSP-02, Rev 2.0, 19-May-2016 [D16] QDP-12, Rev 2.2, 19-Apr-2017 [D17] GP , Rev 1.0, 09-May [D18] GEFPT-QP , Rev 1.11, 26- Jun-2017 [D19] GEMCS-FPT-GLOBAL-QWI , Rev 1.4, 14-Sep-2017 [D20] GEMCS QP , Rev 3.0; 1/9/2015 [D21] GEA32867A, Nv ; 7/2012 [D22] CES-485, Rev, B, Apr-2017 [D23] CES-486, Rev B, Apr-2017 [D24] CES-487, Rev B, Apr-2017 [D25] CES-489, Rev A, Mar-2017 Sample PDR/ECO Manufacturing Lcatin Audit Checklist - India Cmmercial Operatins Order Management Cntract Review Design and Develpment Cntrl Resurce Management Prduct Safety Practive Prcess Crrective and Preventive Actin Field Issue Reslutin Field Ntificatin and Technical Infrmatin Letters Masneilan Series Triple Offset Butterfly Valve Technical Specificatins Prduct Scpe and Specificatins Series Triple Offset Butterfly Valve Standard Cnstructin Rule fr Valve Series Actuatr Sizing Methds Series Triple Offset Butterfly Valve Assembly and Test Specificatin Series [D26] CES-493, Oct-2017 Actuatr Assembly and Test Specificatin Series Triple Offset Butterfly Valve [D27] CES-1001, Rev K, 06-Feb-2016 [D28] CES-1002, Rev K, Feb-2017 [D29] GEA33258, Sep-2017 [D30] CES-1102, Rev B, 07-Nv-2017 [D31] Sample [D32] Sample Hydrstatic Test Prcedure Seat Leakage Testing Masneilan Series Butterfly Valves Instructin Manual Safety Manual fr Valve and Actuatrs Cnfrming t SIL 3 Order Specificatin Sheet 24 in, Class 300 Engineering Design Reprt exida GEO R002 V1R Series Butterfly Valve IEC Assessment Reprt T-023 V4R5 exida 80 N. Main St, Sellersville, PA Page 7 f 16

8 2.4.2 Dcumentatin generated by exida [R1] GEO R001 V1R Series Butterfly Valve FMEDA, 31-Jan-2018 [R2] Q Safety Case WB, 06/16/2015 [R3] Q Prject Wrkbk.xlsx, 04-Dec-2017 [R4] GEO R002 V1R Series Butterfly Valve IEC Assessment Reprt.dcx, 31-Jan-2018 FMEDA reprt, Masneilan Series Triple Offset Butterfly Valve FMEDA EC Cmpliance Assessment Safety Case Series Certificatin Prject File IEC Functinal Safety Assessment, GE OIL & GAS India Private Limited Masneilan Series Triple Offset Butterfly Valve (this reprt) 2.5 Assessment Apprach The certificatin audit was clsely driven by requirements f the exida scheme which includes subsets filtered frm IEC The assessment was planned by exida and agreed upn by GE OIL & GAS India Private Limited The fllwing IEC bjectives were subject t detailed auditing at GE OIL & GAS India Private Limited: FSM planning, including Safety Life Cycle definitin Scpe f the FSM activities Dcumentatin Activities and Respnsibilities (Training and cmpetence) Cnfiguratin management Safety Requirement Specificatin Change and mdificatin management Hardware design / prbabilistic mdeling Hardware and system related V&V activities including dcumentatin, verificatin Hardware-related peratin, installatin and maintenance requirements exida GEO R002 V1R Series Butterfly Valve IEC Assessment Reprt T-023 V4R5 exida 80 N. Main St, Sellersville, PA Page 8 f 16

9 3 Prduct Descriptins The fllwing Masneilan Series Triple Offset Butterfly Valves have been included in this assessment. 3.1 Masneilan Series Triple Offset Butterfly Valve The Masneilan Series Triple Offset Butterfly Valve incrprates new perfrmance enhancing features prviding an exclusive range f zer leakage bi-directinal triple ffset butterfly valves suitable fr extreme pressure/temperature applicatins. Table 1 Prduct Descriptin Valve Cnstructin Size Cnnectins 3 t 36 Class 150 r 300 Wafer, Lugged r Duble Flanged 3 t 20 Class 600 Wafer, Lugged r Duble Flanged Figure 1 Typical Errr! Unknwn dcument prperty name. Table 2 gives an verview f the different versins that were cnsidered in the assessment f the Masneilan Series Triple Offset Butterfly Valve. Table 2 Versin Overview Optin 1 Triple Offset Butterfly Valve The Masneilan Series Triple Offset Butterfly Valve is classified as a cmpnent f a Type A 1 element accrding t IEC 61508, having a hardware fault tlerance f 0. The Safety Functin fr the valve is t mve t the designed safe psitin per the actuatr design within the specified safety time. 1 Type A element: Nn-Cmplex element (using discrete cmpnents); fr details see f IEC , ed2, exida GEO R002 V1R Series Butterfly Valve IEC Assessment Reprt T-023 V4R5 exida 80 N. Main St, Sellersville, PA Page 9 f 16

10 4 IEC Functinal Safety Assessment Scheme exida assessed the develpment prcess used by GE OIL & GAS India Private Limited fr this develpment prject against the bjectives f the exida certificatin scheme which includes subsets f IEC t 3. The results f the assessment are dcumented in [R2] and [R3]. 4.1 Methdlgy The full functinal safety assessment includes an assessment f all fault avidance and fault cntrl measures during hardware develpment and demnstrates full cmpliance with IEC t the end-user. The assessment cnsiders all requirements f IEC Any requirements that have been deemed nt applicable have been marked as such in the full Safety Case reprt, e.g. sftware develpment requirements fr a prduct with n sftware. The assessment als includes a review f existing manufacturing quality prcedures t ensure cmpliance t the quality requirements f IEC As part f the IEC functinal safety assessment the fllwing aspects have been reviewed: Develpment prcess, including: Prduct design Functinal Safety Management, including training and cmpetence recrding, FSM planning, and cnfiguratin management Specificatin prcess, techniques and dcumentatin Design prcess, techniques and dcumentatin, including tls used Validatin activities, including develpment test prcedures, test plans and reprts, prductin test prcedures and dcumentatin Verificatin activities and dcumentatin Mdificatin prcess and dcumentatin Installatin, peratin, and maintenance requirements, including user dcumentatin Manufacturing Quality System Hardware architecture and failure behavir, dcumented in a FMEDA The review f the develpment prcedures is described in sectin 5. The review f the prduct design is described in sectin Assessment level The Masneilan Series Triple Offset Butterfly Valve has been assessed per IEC t the fllwing levels: SIL 3 capability The develpment prcedures have been assessed as suitable fr use in applicatins with a maximum Safety Integrity Level f 3 (SIL 3) accrding t IEC exida GEO R002 V1R Series Butterfly Valve IEC Assessment Reprt T-023 V4R5 exida 80 N. Main St, Sellersville, PA Page 10 f 16

11 5 Results f the IEC Functinal Safety Assessment exida assessed the develpment prcess used by GE OIL & GAS India Private Limited fr these prducts against the bjectives f the exida certificatin scheme which includes IEC parts 1, 2, & 3 see [N1]. The develpment f the Masneilan Series Triple Offset Butterfly Valve was dne per this IEC SIL 3 cmpliant develpment prcess. The Safety Case was updated with prject specific design dcuments. 5.1 Lifecycle Activities and Fault Avidance Measures GE OIL & GAS India Private Limited has a cmpliant develpment prcess as assessed during the IEC certificatin. This cmpliant develpment prcess is dcumented in [D3] and [D4]. N sftware is part f the design and therefre any specific requirements frm IEC related t sftware and sftware develpment d nt apply. The assessment investigated the cmpliance with IEC f the prcesses, prcedures and techniques as implemented fr prduct design and develpment. The investigatin was executed using the exida certificatin scheme which includes subsets f IEC requirements tailred t the SIL 3 wrk scpe f the develpment team. The result f the assessment can be summarized by the fllwing bservatins: The audited GE OIL & GAS India Private Limited design and develpment prcess cmplies with the relevant managerial requirements f IEC SIL Functinal Safety Management FSM Planning The functinal safety management f any instrument develpment is gverned by Cntrlled Administrative Prcedure (CAP) 020 [D3]. Fr each develpment GE OIL & GAS India Private Limited creates a prject schedule [D5] which defines all f the tasks that must be dne t ensure functinal safety as well as the persn(s) respnsible fr each task. The team structure is dcumented in the minutes f the mnthly status meeting with management (see [D6] fr an example). Actin items that arise during the prject are tracked t cmpletin in minutes f the weekly status meeting with the develpment team (see [D7] fr an example). A meeting is held with management at the end f each phase t determine if the team shuld prceed t the next phase. These prcesses and the prcedures referenced herein fulfill the requirements f IEC with respect t functinal safety management. Versin Cntrl All dcuments are under versin cntrl as dcumented in [D4]. Design drawings and dcuments are als under versin cntrl. GE OIL & GAS India Private Limited uses Team Fundatin Server fr its versin cntrl. Training, Cmpetency recrding Persnnel training recrds are kept in accrdance with IEC requirements as dcumented in [D4]. GE OIL & GAS India Private Limited hired exida t be the independent assessr per IEC exida GEO R002 V1R Series Butterfly Valve IEC Assessment Reprt T-023 V4R5 exida 80 N. Main St, Sellersville, PA Page 11 f 16

12 5.1.2 Safety Requirements Specificatin and Architecture Design Fr the Masneilan Series Triple Offset Butterfly Valve, the simple primary functinality f the device is the same as the safety functinality f the prduct. Therefre, n special Safety Requirements Specificatin was needed. The nrmal functinal requirements [D21] were sufficient. As the Masneilan Series Triple Offset Butterfly Valve designs are simple and are based upn standard designs with extensive field histry, n semi-frmal methds are needed. General design and testing methdlgy is dcumented and required as part f the design prcess. This meets SIL Hardware Design Hardware design is dne accrding t [D3]. The hardware design prcess includes cmpnent selectin, detailed drawings and schematics, 3D Slid Mdels, safety case dcuments fr agency justificatin, a failure mdes and effect analysis (FMEA), a failure mdes, effects, and diagnstic analysis (FMEDA), a cncept design review, the creating f prttypes, and hardware verificatin tests. Each prduct family is cntrlled by a set f Cntrlled Engineering Specificatins (CES), [D22] t [D26]. The CES define the prduct scpe and specificatins, assembly and test prcedures, actuatr sizing, cnstructin rules, and key perfrmance characteristics f each family. The prcess includes a systematic design apprach with intermediate reviews. GE OIL & GAS India Private Limited has standards fr dcumentatin with specified utput dcuments. Items frm IEC , Table B.2 include bservance f guidelines and standards, prject management, dcumentatin (design utputs are dcumented per quality prcedures), structured design, mdularizatin, use f well-tried cmpnents / materials, and cmputer-aided design tls. This meets SIL Validatin Validatin Testing is cnducted n new designs t ensure that the designs meet the requirements. Test results are dcumented and recrded (see [D22]). As the Masneilan Series Triple Offset Butterfly Valve are purely mechanical devices with a simple safety functin, there is n separate integratin testing necessary. The Masneilan Series Triple Offset Butterfly Valve perfrm nly 1 Safety Functin, which is extensively tested under varius cnditins during validatin testing. Items frm IEC , Table B.3 include functinal testing, prject management, dcumentatin, and black-bx testing (fr the cnsidered devices this is similar t functinal testing). Field experience and statistical testing via regressin testing are nt applicable. This meets SIL 3. Items frm IEC , Table B.5 included functinal testing and functinal testing under envirnmental cnditins, prject management, dcumentatin, failure analysis (analysis n prducts that failed), expanded functinal testing, black-bx testing, and fault insertin testing. This meets SIL Verificatin The develpment and verificatin activities are defined Prject Plan. Fr each design phase the bjectives are stated, required input and utput dcuments and review activities. In additin, each rder is prcessed thrugh a structured prcess that includes defining the prductin tests that need t be cmpleted, [D31]. This meets SIL 3. exida GEO R002 V1R Series Butterfly Valve IEC Assessment Reprt T-023 V4R5 exida 80 N. Main St, Sellersville, PA Page 12 f 16

13 5.1.6 Mdificatins All mdificatins are dne per the GE OIL & GAS India Private Limited IEC SIL 3 cmpliant develpment prcess as dcumented in [D3]. Impact analyses are perfrmed fr all changes nce the prduct is released. The results f the impact analysis are used in determining whether t apprve the change. The standard develpment prcess is then fllwed t make the change. The handling f custmer ntificatins is gverned by [D20]. This prcedure includes identificatin f the prblem, analysis f the prblem, identificatin f the slutin, and cmmunicatin f the slutin t the field. Custmers are required t acknwledge receipt f any safety ntices. The mdificatin prcess has been successfully assessed and audited, s GE OIL & GAS India Private Limited may make mdificatins t this prduct as needed. The mdificatin prcess has been revised t include a functinal safety impact analysis. The initial pst assessment mdificatin t the Masneilan Series Triple Offset Butterfly Valve shall be audited by exida t cnfirm that a functinal safety impact analysis was perfrmed accrding t GE OIL & GAS mdificatin prcedure. As part f the exida scheme a surveillance audit is cnducted every 3 years. The mdificatin dcumentatin listed belw is submitted as part f the surveillance audit. exida will review the decisins made by the cmpetent persn in respect t the mdificatins made. This meets SIL 3. List f all anmalies reprted List f all mdificatins cmpleted Safety impact analysis which shall indicate with respect t the mdificatin: The initiating prblem (e.g. results f rt cause analysis) The effect n the prduct / system The elements/cmpnents that are subject t the mdificatin The extent f any re-testing List f mdified dcumentatin User dcumentatin GE OIL & GAS India Private Limited created a Safety Manual sectin as part f the Instructin Manual fr the Masneilan Series Triple Offset Butterfly Valve, see [D30]. This safety manual was assessed by exida. The final versin is in cmpliance with the requirements f IEC The dcument, in cnjunctin with the Installatin, Operatins, and Maintenance manual [D31] include all required peratins, maintenance, and prf test prcedures and references t reliability data. Items frm IEC , Table B.4 include peratin and maintenance instructins, user friendliness, maintenance friendliness, prject management, dcumentatin, limited peratin pssibilities (Masneilan Series Triple Offset Butterfly Valve perfrm well-defined actins) and peratin nly by skilled peratrs (peratrs familiar with type f valve, althugh this is partly the respnsibility f the end-user). This meets SIL Hardware Assessment T evaluate the hardware design f the Masneilan Series Triple Offset Butterfly Valve Failure Mdes, Effects, and Diagnstic Analysis s were perfrmed by exida. These are dcumented in [R1]. exida GEO R002 V1R Series Butterfly Valve IEC Assessment Reprt T-023 V4R5 exida 80 N. Main St, Sellersville, PA Page 13 f 16

14 A Failure Mdes and Effects Analysis (FMEA) is a systematic way t identify and evaluate the effects f different cmpnent failure mdes, t determine what culd eliminate r reduce the chance f failure, and t dcument the system in cnsideratin. An FMEDA (Failure Mde Effect and Diagnstic Analysis) is an FMEA extensin. It cmbines standard FMEA techniques with extensin t identify nline diagnstics techniques and the failure mdes relevant t safety instrumented system design. Frm the FMEDA, failure rates are derived fr each imprtant failure categry. All failure rate analysis results and useful life limitatins are listed in the FMEDA reprt [R1]. Tables in the FMEDA reprt list these failure rates fr the Masneilan Series Triple Offset Butterfly Valve under a variety f applicatins. The failure rates listed are valid fr the useful life f the device. Accrding t IEC the architectural cnstraints f an element must be determined. This can be dne by fllwing the 1 H apprach accrding t f IEC r the 2 H apprach accrding t f IEC The 1 H apprach invlves calculating the Safe Failure Fractin fr the entire element. The 2 H apprach invlves assessment f the reliability data fr the entire element accrding t f IEC The failure rate data used fr this analysis meets the exida criteria fr Rute 2 H. Therefre, the Masneilan Series Triple Offset Butterfly Valve can be classified as a 2 H device. When 2 H data is used fr all f the devices in an element, the element meets the hardware architectural cnstraints up t SIL 2 at HFT=0 (r SIL HFT=1) per Rute 2 H. If Rute 2 H is nt applicable fr the entire final element, the architectural cnstraints will need t be evaluated per Rute 1 H. Nte, as the Masneilan Series Triple Offset Butterfly Valve are nly ne part f a (sub)system, the SFF shuld be calculated fr the entire final element cmbinatin. These results must be cnsidered in cmbinatin with PFD avg values f ther devices f a Safety Instrumented Functin (SIF) in rder t determine suitability fr a specific Safety Integrity Level (SIL). The architectural cnstraints requirements f IEC , Table 2 als need t be evaluated fr each final element applicatin. It is the end user s respnsibility t cnfirm this fr each particular applicatin and t include all cmpnents f the final element in the calculatins. The analysis shws that the design f the Masneilan Series Triple Offset Butterfly Valve can meet the hardware requirements f IEC 61508, SIL 3 fr the Masneilan Series Triple Offset Butterfly Valve depending n the cmplete final element design. The Hardware Fault Tlerance and PFD avg requirements f IEC must be verified fr each specific design. exida GEO R002 V1R Series Butterfly Valve IEC Assessment Reprt T-023 V4R5 exida 80 N. Main St, Sellersville, PA Page 14 f 16

15 6 Terms and Definitins Architectural Cnstraint exida criteria Fault tlerance FIT FMEDA HFT Lw demand mde PFD avg PVST Randm Capability SFF SIF SIL SIS Systematic Capability Type A element Type B element The SIL limit impsed by the cmbinatin f SFF and HFT fr Rute 1 H r by the HFT and Diagnstic Cverage (DC applies t Type B nly) fr Rute 2 H A cnservative apprach t arriving at failure rates suitable fr use in hardware evaluatins utilizing the 2 H Rute in IEC Ability f a functinal unit t cntinue t perfrm a required functin in the presence f faults r errrs (IEC , 3.6.3) Failure In Time (1x10-9 failures per hur) Failure Mde Effect and Diagnstic Analysis Hardware Fault Tlerance Mde, where the demand interval fr peratin made n a safety-related system is greater than twice the prf test interval. Average Prbability f Failure n Demand Partial Valve Strke Test It is assumed that the Partial Strke Testing, when perfrmed, is autmatically perfrmed at least an rder f magnitude mre frequent than the prf test, therefre the test can be assumed an autmatic diagnstic. Because f the autmatic diagnstic assumptin, the Partial Valve Strke Testing als has an impact n the Safe Failure Fractin. The SIL limit impsed by the PFD avg fr each element. Safe Failure Fractin summarizes the fractin f failures, which lead t a safe state and the fractin f failures which will be detected by diagnstic measures and lead t a defined safety actin. Safety Instrumented Functin Safety Integrity Level Safety Instrumented System Implementatin f ne r mre Safety Instrumented Functins. A SIS is cmpsed f any cmbinatin f sensr(s), lgic slver(s), and final element(s). The SIL limit impsed by the capability f the prducts manufacturer. Nn-Cmplex element (using discrete cmpnents); fr details see f IEC Cmplex element (using cmplex cmpnents such as micr cntrllers r prgrammable lgic); fr details see f IEC exida GEO R002 V1R Series Butterfly Valve IEC Assessment Reprt T-023 V4R5 exida 80 N. Main St, Sellersville, PA Page 15 f 16

16 7 Status f the Dcument 7.1 Liability exida prepares reprts based n methds advcated in Internatinal standards. exida accepts n liability whatsever fr the use f this reprt r fr the crrectness f the standards n which the general calculatin methds are based. 7.2 Versin Histry Cntract Number Reprt Number Q17/ GEO R002 V1, R1, 31-Jan-2018 Q17/ GEO R002 V1, R0, 31-Jan-2018 Reviewer: Status: Ted Stewart, exida 31-Jan-2018 Released, 31-Jan-2018 Revisin Ntes Released Draft 7.3 Future Enhancements At request f client. 7.4 Release Signatures Ted E. Stewart, CFSP Prgram Develpment & Cmpliance Manager Chris O Brien, CFSE, Partner exida GEO R002 V1R Series Butterfly Valve IEC Assessment Reprt T-023 V4R5 exida 80 N. Main St, Sellersville, PA Page 16 f 16

IEC Functional Safety Assessment. United Electric Controls Watertown, MA USA

IEC Functional Safety Assessment. United Electric Controls Watertown, MA USA IEC 61508 Functinal Safety Assessment Prject: One Series Safety Transmitter Custmer: United Electric Cntrls Watertwn, MA USA Cntract N.: Q17/01-143 Reprt N.: UEC 1210073 R002 Versin V1, Revisin R3, May

More information

SOUTH METRO FIRE RESCUE AUTHORITY LIFE SAFETY BUREAU SUBMITTAL REQUIREMENTS

SOUTH METRO FIRE RESCUE AUTHORITY LIFE SAFETY BUREAU SUBMITTAL REQUIREMENTS SOUTH METRO FIRE RESCUE AUTHORITY LIFE SAFETY BUREAU SUBMITTAL REQUIREMENTS Subject: Cde/Standard Reference: Smke Cntrl System Submittal Requirements 2006 Internatinal Building Cde (06IBC) Effective Date:

More information

Avigilon Control Center 5 System Integration Guide. for Hirsch Identiv Velocity Access Control Systems

Avigilon Control Center 5 System Integration Guide. for Hirsch Identiv Velocity Access Control Systems Avigiln Cntrl Center 5 System Integratin Guide fr Hirsch Identiv Velcity Access Cntrl Systems 2012-2015 Avigiln Crpratin. All rights reserved. Unless expressly granted in writing, n license is granted

More information

Avigilon Control Center 6 System Integration Guide

Avigilon Control Center 6 System Integration Guide Avigiln Cntrl Center 6 System Integratin Guide fr Identiv HIRSCH Velcity Sftware 2012-2017, Avigiln Crpratin. All rights reserved. AVIGILON, the AVIGILON lg, ACC, AVIGILONCONTROL CENTER and TRUSTED SECURITY

More information

CHAPTER SEVENTEEN GUARDRAIL ITEMS

CHAPTER SEVENTEEN GUARDRAIL ITEMS CHAPTER SEVENTEEN GUARDRAIL ITEMS 17 GUARDRAIL ITEMS 1 7 OVERVIEW Guardrail items have different dcumentatin requirements fr each unit f measure (UOM). All guardrail items must be cunted r measured and

More information

RD-R OPERATIONAL REQUIREMENTS FOR THE REMOTE MAINTENANCE I/i MONITORING SYSTEM (RMMS)(U) FEDERAL AVIATION ADMINISTRATION WASHINGTON DC JUN 84

RD-R OPERATIONAL REQUIREMENTS FOR THE REMOTE MAINTENANCE I/i MONITORING SYSTEM (RMMS)(U) FEDERAL AVIATION ADMINISTRATION WASHINGTON DC JUN 84 RD-R144 218 OPERATIONAL REQUIREMENTS FOR THE REMOTE MAINTENANCE I/i MONITORING SYSTEM (RMMS)(U) FEDERAL AVIATION ADMINISTRATION WASHINGTON DC JUN 84 FAA-NAS-MD-792 UNCLASSIFIED F/G 17/2. i L IIIA 11.511-.4

More information

Guidelines Alarm Systems - Remote Services. Document: G1-23-EN Publication: May

Guidelines Alarm Systems - Remote Services. Document: G1-23-EN Publication: May Guidelines Alarm Systems - Remte Services Dcument: 16-05-15-G1-23-EN Publicatin: May 15 2016 Frewrd This dcument was prepared by Euralarm (Assciatin f Eurpean manufacturers, installers and service prviders

More information

ISOBUS Diagnostics Functional Overview

ISOBUS Diagnostics Functional Overview ISOBUS Diagnstics Functinal Overview (ISO11783 Part 12) Hans Jürgen Nissen Jhn Deere AMS Eurpe 21 th February 2008 ISOBUS Intr in Brazil 1 Tpics General Descriptin Diagnstic Cnnectr 3 Levels f Diagnstics

More information

IEC Functional Safety Assessment

IEC Functional Safety Assessment IEC 61508 Functional Safety Assessment Project: Detcon IR-700 Combustible Hydrocarbon Gas Sensor Customer: Detcon The Woodlands, TX USA Contract No.: Q13/06-003 Report No.: DC 13-06-003 R002 Version V1,

More information

CHAPTER SEVEN LANDSCAPE AND IRRIGATION ITEMS

CHAPTER SEVEN LANDSCAPE AND IRRIGATION ITEMS CHAPTER SEVEN LANDSCAPE AND IRRIGATION ITEMS 7 LANDSCAPE AND IRRIGATION ITEMS 7 OVERVIEW Landscape and irrigatin items have different dcumentatin requirements fr each unit f measure (UOM). All landscape

More information

Avigilon Control Center 5 System Integration Guide

Avigilon Control Center 5 System Integration Guide Avigiln Cntrl Center 5 System Integratin Guide with Gallagher Cmmand Centre INT-CARDAX-D-Rev1 Cpyright 2013 Avigiln. All rights reserved. N cpying, distributin, publicatin, mdificatin, r incrpratin f this

More information

Avigilon Control Center 5 System Integration Guide

Avigilon Control Center 5 System Integration Guide Avigiln Cntrl Center 5 System Integratin Guide with AMAG Symmetry Security Management System 7.0 INT-AMAG-C-Rev2 2013 2014 Avigiln Crpratin. All rights reserved. Unless expressly granted in writing, n

More information

University of Arkansas for Medical Sciences. Part IV - Fire Prevention & Life Safety Management Plan FY18

University of Arkansas for Medical Sciences. Part IV - Fire Prevention & Life Safety Management Plan FY18 University f Arkansas fr Medical Sciences Part IV - Fire Preventin & Life Safety Management Plan FY18 I. MISSION The purpse f this plan is t prmte, implement and administer a cmprehensive Life Safety prgram

More information

Avigilon Control Center 5 System Integration Guide. with Gallagher Command Centre

Avigilon Control Center 5 System Integration Guide. with Gallagher Command Centre Avigiln Cntrl Center 5 System Integratin Guide with Gallagher Cmmand Centre 2015, Avigiln Crpratin. All rights reserved. AVIGILON, the AVIGILON lg, ACC and AVIGILON CONTROL CENTER are trademarks f Avigiln

More information

INSPECTION AND TESTING OF FIRE ALARM SYSTEMS

INSPECTION AND TESTING OF FIRE ALARM SYSTEMS INSPECTION AND TESTING OF FIRE ALARM SYSTEMS Intrductin Early warning plays a key rle in a health care facility s ability t safely evacuate its residents during a fire emergency. As a result, a lt is riding

More information

PROTECTION OF KITCHEN COOKING EQUIPMENT

PROTECTION OF KITCHEN COOKING EQUIPMENT PROTECTION OF KITCHEN COOKING EQUIPMENT Intrductin In rder t ensure that they perate prperly when needed and dn t trip unnecessarily, bth federal certificatin requirements and state licensure requirements

More information

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU STANDARD

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU STANDARD July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU STANDARD RESIDENTIAL FIRE SPRINKLERS NFPA 13R PURPOSE This standard shall cver the general design and installatin f autmatic sprinkler systems

More information

CITY OF TUCSON, ARIZONA DEPARTMENT OF TRANSPORTATION ENGINEERING DIVISION ACTIVE PRACTICES GUIDELINES

CITY OF TUCSON, ARIZONA DEPARTMENT OF TRANSPORTATION ENGINEERING DIVISION ACTIVE PRACTICES GUIDELINES CITY OF TUCSON, ARIZONA DEPARTMENT OF TRANSPORTATION ENGINEERING DIVISION ACTIVE PRACTICES GUIDELINES UPDATED 08/06/13 PREPARED BY: EFFECTIVE: --=08~-=06~-~13~-- APPROVED BY: DATE:_~0=8~-0=6~-1=3 _ SUBJECT:

More information

The Right Door for Hope, Recovery and Wellness. Adopted 5/13/02. This procedure shall apply to The Right Door for Hope, Recovery and Wellness.

The Right Door for Hope, Recovery and Wellness. Adopted 5/13/02. This procedure shall apply to The Right Door for Hope, Recovery and Wellness. 2/6/14; ; PROCEDURE Applicatin This prcedure shall apply t. 1.0 Purpse The purpse f the Safety Management Plan is t ensure a safe envirnment fr staff, persns served, and visitrs thrugh preventative and

More information

manual Polymount Plate Cleaner installation protocol Setting / maintenance compressed air + pump pg. 16 Maintenance table settings pg.

manual Polymount Plate Cleaner installation protocol Setting / maintenance compressed air + pump pg. 16 Maintenance table settings pg. manual Plymunt Plate Cleaner installatin prtcl Setting / maintenance cmpressed air + pump pg. 16 Maintenance table settings pg. 18 Dear Custmer, Thank yu fr purchasing a Plymunt Plate Cleaner. Plate cleaners

More information

PHANTASY ELECTRIC FIRE (TF-1561ERA) FEATURING THE WHISPERGLOW FLAME EFFECT

PHANTASY ELECTRIC FIRE (TF-1561ERA) FEATURING THE WHISPERGLOW FLAME EFFECT INSTRUCTION MANUAL PHANTASY ELECTRIC FIRE (TF-1561ERA) FEATURING THE WHISPERGLOW FLAME EFFECT This prduct is nly suitable fr well insulated spaces r ccasinal use. T be left with the custmer after demnstrating

More information

IS Rating Tool Design Review Guide IS v1.2

IS Rating Tool Design Review Guide IS v1.2 IS Rating Tl Design Review Guide IS v1.2 2017 Infrastructure Sustainability Cuncil f Australia (ISCA) Versin 1.2 April 2017 The infrmatin cntained in this publicatin has been cmpiled in gd faith, exercising

More information

Wayne County Community College District

Wayne County Community College District Wayne Cunty Cmmunity Cllege District AUT 117 Electrical/Electrnic Systems IV CREDIT HOURS: 3.00 CONTACT HOURS: 60.00 COURSE DESCRIPTION: This curse is a required curse in the Autmtive Technlgy certificate

More information

2019 Professional Awards Program Information

2019 Professional Awards Program Information Eligibility All members f the Wiscnsin Chapter f The American Sciety f Landscape Architects (ASLA) are eligible t submit entries fr landscape architecture prjects lcated in r ut f the State f Wiscnsin.

More information

BUSINESS PREMISES FIRE RISK ASSESSMENT GUIDANCE

BUSINESS PREMISES FIRE RISK ASSESSMENT GUIDANCE BUSINESS PREMISES FIRE RISK ASSESSMENT GUIDANCE Intrductin Fire Risk Assessment (Hw t cmplete) Cntents Sectin 1. Premises Particulars 2. General Statement f Plicy 3. Management Systems 4. General Descriptin

More information

Instruction manual. Version PRETREATmaker

Instruction manual. Version PRETREATmaker Instructin manual PRETREATmaker 1/12 1. Intrductin 1.1 Cntent 1. Intrductin 02 1.1 Cntent 1.2 Cnstructin f PRETREATmaker 1.3 Technical Data 1.4 Prtectin f the device 1.5 Safety arrangements at the wrkspace

More information

775 Combination Carbon Monoxide/Combustible Gas Detector. 775 Combination Carbon Monoxide/Combustible Gas Detector

775 Combination Carbon Monoxide/Combustible Gas Detector. 775 Combination Carbon Monoxide/Combustible Gas Detector Visit TPI, The Value Leader tm at: www.tpi-thevalueleader.cm 775 Cmbinatin Carbn Mnxide/Cmbustible Gas Detectr Test Prducts Internatinal, Inc. Headquarters: 9615 SW Allen Blvd. Beavertn, OR 97005 USA 503-520-9197

More information

YCC205 RFP for Landscape Renewal December 7, Condo Corporation YCC 205 RFP for Landscape Renewal

YCC205 RFP for Landscape Renewal December 7, Condo Corporation YCC 205 RFP for Landscape Renewal Cnd Crpratin YCC 205 RFP fr Landscape Renewal Table f Cntents Table f Cntents... 2 Backgrund... 3 Opprtunity... 3 Structure... 3 Timing... 4 Plan... 4 Alternative Appraches... 5 Evaluatin Criteria... 5

More information

Model : SP601-15, 15T, 20, 20T, 30, 30T

Model : SP601-15, 15T, 20, 20T, 30, 30T SP601 User Guide.pdf Bklet Part Number Q916321 7th Nvember 2005 User s Guide Mdel : SP601-15, 15T, 20, 20T, 30, 30T Spa-Quip Australia Pty Ltd Spa-Pwer Equipment www.spa-quip.cm.au service@spa-quip.cm.au

More information

PUBLIC WORKS DEPARTMENT. Charles D. Herbertson, Public Works Director/City Engineer

PUBLIC WORKS DEPARTMENT. Charles D. Herbertson, Public Works Director/City Engineer Page 1 PUBLIC WORKS DEPARTMENT DATE: April 18, 2017 TO: FROM: Culver City Residents and Cmmunity Charles D. Herbertsn, Public Wrks Directr/City Engineer SUBJECT: Tree Remvals Dear Residents: Trees can

More information

Electrical devices may only be mounted and connected by electrically skilled persons.

Electrical devices may only be mounted and connected by electrically skilled persons. Universal dimming actuatr, 1-gang Art. N. : 3901 REGHE Universal dimming actuatr, 2-gang Art. N. : 3902 REGHE Universal dimming actuatr, 4-gang Art. N. : 3904 REGHE Operating instructins 1 Safety instructins

More information

HOT WORK PERMIT PROGRAM SAMPLE POLICY

HOT WORK PERMIT PROGRAM SAMPLE POLICY HOT WORK PERMIT PROGRAM SAMPLE POLICY OBJECTIVE: T establish requirements fr perfrming ht wrk during maintenance and cnstructin activities cunty facilities. POLICY: All cunty emplyees and utside cntractrs

More information

FIRE FIGHTING DESIGN & DRAFTING TRAINING. Electro Mechanical LLC

FIRE FIGHTING DESIGN & DRAFTING TRAINING. Electro Mechanical LLC Electr Mechanical LLC FIRE FIGHTING DESIGN & DRAFTING TRAINING Tel # +91 40-64586460, 64103603 ; URL: www.kgmech.cm Electr Mechanical LLC KG-MECH LLC., with its inceptin has been diversified its business

More information

For the user. Instructions for use. aquaplus VUI Gas fired room sealed fan assisted. combination boiler with 15L store

For the user. Instructions for use. aquaplus VUI Gas fired room sealed fan assisted. combination boiler with 15L store Fr the user nstructins fr use aquaplus Gas fired rm sealed fan assisted VU 362-7 cmbinatin biler with 5L stre GB Table f cntents nfrmatin t the dcumentatin page nfrmatin t the dcumentatin............ 2

More information

Hot Work Permit Program

Hot Work Permit Program Ht Wrk Permit Prgram Cntents: Purpse Applicatin Reference Definitins Prcedures Respnsibilities Appendix A. Ht Wrk Permit Purpse: T prvide written prcedures t prevent the utbreak f fire, fire alarm activatins,

More information

ph REGULATOR INSTALLATION AND MAINTENANCE MANUAL

ph REGULATOR INSTALLATION AND MAINTENANCE MANUAL ph REGULATOR INSTALLATION AND MAINTENANCE MANUAL DELTA ULTRAVIOLET CORPORATION CORPORATE HEADQUARTERS 1535 West Rsecrans Ave Gardena, CA 90249 Phne 310-323-6400 Tll free 866-UV9-8765 Fax 310-323-6403 INSTALLATION

More information

INSPECTION AND TESTING OF EMERGENCY GENERATORS

INSPECTION AND TESTING OF EMERGENCY GENERATORS INSPECTION AND TESTING OF EMERGENCY GENERATORS Certificatin requirements NFPA 101(12), Sec. 7.9.2.4 requires that emergency generatrs prviding pwer t emergency lighting systems be installed, tested and

More information

SA-SAMS. Guideline for using Physical Resources and Infrastructure. Register Module. September 2009

SA-SAMS. Guideline for using Physical Resources and Infrastructure. Register Module. September 2009 SA-SAMS Guideline fr using Physical Resurces and Infrastructure Register Mdule September 2009 Educatin Management Systems (EMS) Department f Educatin Private Bag X895 0001 PRETORIA CONTENT 1. INTRODUCTION...

More information

Avigilon Control Center 6 System Integration Guide. with Gallagher Command Centre

Avigilon Control Center 6 System Integration Guide. with Gallagher Command Centre Avigiln Cntrl Center 6 System Integratin Guide with Gallagher Cmmand Centre 2013-2017, Avigiln Crpratin. All rights reserved. AVIGILON, the AVIGILON lg, ACC, AVIGILON CONTROL CENTER and TRUSTED SECURITY

More information

CC-280E Thermoelectric Cigar Cooler

CC-280E Thermoelectric Cigar Cooler CC-280E Thermelectric Cigar Cler OWNERS MANUAL Read and save these instructins. 2 READ AND SAVE THESE INSTRUCTIONS Thank yu fr chsing this NewAir appliance. At NewAir, we re dedicated t prviding cmfrtable

More information

Design Standard Intrusion Detection

Design Standard Intrusion Detection Divisin 28 16 00 Intrusin Detectin System Versin 1.2015.0921 Purpse Design Standard Intrusin Detectin ESUHSD s Intrusin Detectin design standard is intended t achieve unifrmity f functinality, peratin,

More information

Landscape Request Front Yard Conversion

Landscape Request Front Yard Conversion Frnt Yard Cnversin REQUESTS MUST BE RECEIVED BY NOON ON FRIDAY TO BE REVIEWED AT THE COMMITTEE MTG LEGAL OWNER INFORMATION (PLEASE PRINT CLEARLY) NAME ADDRESS MAILING ADDRESS EMAIL ADDRESS DATE HOME PHONE

More information

Safe-man Productivity System

Safe-man Productivity System Safe-man Prductivity System Mdel: Safe-man 3.0 Spnge-Jet, Inc. 14 Pattersn Lane, Newingtn, NH 03801 USA +1-603-610-7950 / www.safemansystem.cm Safe-man 3.0 User Manual - 19 June 2012 Table f Cntents Sectin

More information

Commerzbank AG Kaiserstraße Frankfurt am Main, Germany. Sicherheitszentrale DLZ

Commerzbank AG Kaiserstraße Frankfurt am Main, Germany. Sicherheitszentrale DLZ The certificatin bdy f TÜV Infrmatinstechnik GmbH hereby awards this certificate t the cmpany Cmmerzbank AG Kaiserstraße 16 60311 Frankfurt am Main, Germany t cnfirm that the alarm receiving center Sicherheitszentrale

More information

DISHWASHER REMOVAL & REPLACEMENT

DISHWASHER REMOVAL & REPLACEMENT REQUEST FOR QUOTE: DISHWASHER REMOVAL & REPLACEMENT Qute: #17-071 RFQ Released: Octber 20, 2016 Deadline fr Qutes: Thursday, Nvember 3, 2016 ORGANIZATIONAL OVERVIEW The Hustn Livestck Shw and Rde (the

More information

I308. Central Park Precinct

I308. Central Park Precinct I308. Central Park Precinct I308.1. Precinct descriptin The Central Park Precinct is lcated at 666 Great Suth Rad, Ellerslie. The purpse f the Central Park Precinct is t prvide fr emplyment and ffice activities

More information

ph / ORP REGULATOR INSTALLATION AND MAINTENANCE MANUAL

ph / ORP REGULATOR INSTALLATION AND MAINTENANCE MANUAL ph / ORP REGULATOR INSTALLATION AND MAINTENANCE MANUAL DELTA ULTRAVIOLET CORPORATION CORPORATE HEADQUARTERS 1535 West Rsecrans Ave Gardena, CA 90249 Phne 310-323-6400 Tll free 866-UV9-8765 Fax 310-323-6403

More information

7th Edition Global Health & Sustainability

7th Edition Global Health & Sustainability 7th Editin Glbal Health & Sustainability 2017 NMI Cnsumer Trends Tracker study 2017 Participatin Opprtunities Since 2005 NMI has tracked health and sustainability n a glbal basis, examining the intersectin

More information

Aspect kettle Please read and keep these instructions

Aspect kettle Please read and keep these instructions Aspect kettle Please read and keep these instructins Health and Safety The use f any electrical appliance requires the fllwing cmmn sense safety rules. Please read these instructins carefully befre using

More information

STORMWATER DESIGN MANUAL

STORMWATER DESIGN MANUAL KITSAP COUNTY STORMWATER DESIGN MANUAL Effective Date: December 31, 2016 prepared f This page intentinally left blank. CHAPTER 2 SITE ASSESSMENT AND PLANNING Befre evaluating minimum requirements and starting

More information

Range Hood Instruction Manual

Range Hood Instruction Manual Perfekt Insert-24, Perfekt Insert-30, Perfekt Insert-36 Range Hd Instructin Manual Thank yu fr the purchase f this prduct. Please read the manual carefully befre perating the appliance. Cntents Imprtant

More information

NEWTON CONTROL PANEL-PRO (CP2 & CP7)

NEWTON CONTROL PANEL-PRO (CP2 & CP7) Pumps, Pumping Systems and Ancillaries NEWTON CONTROL PANEL-PRO (CP2 & CP7) Multi-Functin Pump Cntrl and Mnitring Panel Operatinal Manual Rev 3.3-19 July 2017 Newtn Waterprfing Systems INFORMATION CONTENTS

More information

Guidance for Sanitary Appliances for the declaration of Performance (DoP) and CE-marking according to the Construction Products Regulation 305/2011

Guidance for Sanitary Appliances for the declaration of Performance (DoP) and CE-marking according to the Construction Products Regulation 305/2011 Guidance fr Sanitary Appliances fr the declaratin f Perfrmance (DP) and CE-marking accrding t the Cnstructin Prducts Regulatin 305/2011 EU Imprint This guidance paper is drafted by the technical experts

More information

Expression of Interest. Murray Irrigation Limited Chemical Weed Control Program. Tender Reference Number 1109

Expression of Interest. Murray Irrigation Limited Chemical Weed Control Program. Tender Reference Number 1109 Expressin f Interest Murray Irrigatin Limited 2015-16 Chemical Weed Cntrl Prgram Tender Reference Number 1109 Murray Irrigatin ABN 23 067 197 933 443 Charltte Street Deniliquin NSW 2710 1 July 2015 t 30

More information

Perfekt Glide-24 Perfekt Glide-30 Perfekt Glide-36 Built-in Range Hood Instruction Manual

Perfekt Glide-24 Perfekt Glide-30 Perfekt Glide-36 Built-in Range Hood Instruction Manual perfekt in frm und funktin Perfekt Glide-24 Perfekt Glide-30 Perfekt Glide-36 Built-in Range Hd Instructin Manual Thank yu fr the purchase f this prduct. Please read the manual carefully befre p g the

More information

Product line training. Gregor Vialette June 2016

Product line training. Gregor Vialette June 2016 Prduct line training Gregr Vialette June 2016 Outline I. Overview II. Cmpressr units III. Air Handlers IV.Earth Lps V. Finding infrmatin VI.Q & A Overview Prduct Line Prime Series (x3) Tw-stage units with

More information

Filter Coffee Maker. For competitions, product hints and tips and more join us at

Filter Coffee Maker. For competitions, product hints and tips and more join us at 47140 rev4_layut 1 18/10/2011 09:47 Page 1 CM47140 MUK Rev 4 * Filter Cffee Maker Upn registratin with Mrphy Richards (UK & ROI nly) 85 47140 Fr cmpetitins, prduct hints and tips and mre jin us at www.hmefthehuseprud.cm

More information

Range Hood Instruction Manual

Range Hood Instruction Manual Perfekt Pyramid 30, Perfekt Pyramid 36 Range Hd Instructin Manual Thank yu fr the purchase f this prduct. Please read the manual carefully befre perating the appliance. Cntents Imprtant Safety Instructins

More information

EUROSKILLS TECHNICAL DESCRIPTION LANDSCAPE GARDENING (51)

EUROSKILLS TECHNICAL DESCRIPTION LANDSCAPE GARDENING (51) EUROSKILLS TECHNICAL DESCRIPTION LANDSCAPE GARDENING (51) WrldSkills Eurpe, by a reslutin f the Cmpetitin Develpment Cmmittee (CDC) and in accrdance with the Cnstitutin, the Standing Orders and the Cmpetitin

More information

EMERGENCY RESPONSE PLAN

EMERGENCY RESPONSE PLAN EMERGENCY RESPONSE PLAN Overview This dcument prvides infrmatin abut required actin t handle emergencies at the WWWWIW wrkplace. The gal is t ensure Persnnel are aware f emergency situatins and respnse

More information

Prepared By: Lisa McAvoy 16/Nov/17 dd/mmm/yy. Approved By: Veronica Harris-McAllister 17/Nov/17 dd/mmm/yy

Prepared By: Lisa McAvoy 16/Nov/17 dd/mmm/yy. Approved By: Veronica Harris-McAllister 17/Nov/17 dd/mmm/yy Standard Operating Prcedure Centrifuge Safety SOP Number: SOP-CS-01 Categry: Lab Equipment Supersedes: N/A Effective Date: December 1, 2017 Pages 8 Subject: CENTRIFUGE SAFETY Prepared By: Lisa McAvy 16/Nv/17

More information

Whole School Fire Risk Prevention Policy (Including Nursery)

Whole School Fire Risk Prevention Policy (Including Nursery) Whle Schl Fire Risk Preventin Plicy (Including Nursery) (Als refer t Fire Risk Preventin and Emergency Evacuatin Prcedures (Main Cranfrd Huse Schl Site) and Fire Risk Preventin and Emergency Evacuatin

More information

Fire Safety Policy. Action Date Reason Reviewer Review Policy 13/01/ yearly review Lesley Salkeld/ Paul Anderson

Fire Safety Policy. Action Date Reason Reviewer Review Policy 13/01/ yearly review Lesley Salkeld/ Paul Anderson Fire Safety Plicy Reviews and Revisins Actin Date Reasn Reviewer Review Plicy 13/01/2016 2 yearly review Lesley Salkeld/ Paul Andersn Review Plicy 19/05/2016 T reflect new perating prcedures Lesley Salkeld/David

More information

Under-Flame Fire Tests on Timber Decks

Under-Flame Fire Tests on Timber Decks CMMT-2007-049 Under-Flame Fire Tests n Timber Decks Reprt t Bushfire CRC L. Macinde A. Sargeant P. A. Bwditch CSIRO - Manufacturing and Materials Technlgy Fire Science and Technlgy Labratry February 2007

More information

ELIGIBLE MEASURES (For Program fiscal year July 1, 2017 to June 30, 2018)

ELIGIBLE MEASURES (For Program fiscal year July 1, 2017 to June 30, 2018) Oil, Prpane, Municipal Electric Public Gas /Electric Utility FY 2018 New Jersey Hme Perfrmance with ENERGY STAR ELIGIBLE MEASURES (Fr Prgram fiscal year July 1, 2017 t June 30, 2018) Hme Perfrmance with

More information

Assessment of the Rules on Heater De-Rating

Assessment of the Rules on Heater De-Rating Assessment f the Rules n Heater De-Rating Reinhard Schlitt (1), Stephan-Andrè Kuhlmann (1), Bernd Carsten Sander (2), Susann Neustadt (2) (1) OHB System AG, Universitaetsallee 27-29, 28359 Bremen, Germany

More information

LASER SAFETY. Patient Safety

LASER SAFETY. Patient Safety ACCREDITATION STANDA RDS LASER SAFETY A wide variety f lasers are used in health care and their use cntinues t grw with advancements in health-care technlgy, equipment and prcedures. While lasers ffer

More information

Dissecting Proprietary Stormwater Treatment BMPs to Develop Practical Solutions Unbiased Research and Case Studies

Dissecting Proprietary Stormwater Treatment BMPs to Develop Practical Solutions Unbiased Research and Case Studies Dissecting Prprietary Strmwater Treatment BMPs t Develp Practical Slutins Unbiased Research and Case Studies Railrad Envirnmental Cnference University f Illinis at Urbana-Champaign Octber 24, 2017 Outline

More information

CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP

CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP DEVELOPMENT SERVICES GROUP 9611 SE 36TH STREET MERCER ISLAND, WA 98040 PHONE: 206.275.7605 www.mercergv.rg Inspectin Requests: Online: www.mybuildingpermits.cm VM: 206.275.7730 Intrductin Small prjects

More information

Dissecting Proprietary Stormwater Treatment BMPs to Develop Practical Solutions Unbiased Research and Case Studies

Dissecting Proprietary Stormwater Treatment BMPs to Develop Practical Solutions Unbiased Research and Case Studies Dissecting Prprietary Strmwater Treatment BMPs t Develp Practical Slutins Unbiased Research and Case Studies Maine Strmwater Cnference Prtland, Maine Octber 24, 2017 Outline Intrductin Need and prblem

More information

PROGRAM OUTLINE. Locksmith

PROGRAM OUTLINE. Locksmith PROGRAM OUTLINE Lcksmith The latest versin f this dcument is available in PDF frmat n the ITA website www.itabc.ca T rder printed cpies f Prgram Outlines r learning resurces (where available) fr BC trades

More information

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU STANDARD

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU STANDARD SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU STANDARD SHELL BUILDING This Standard utlines general requirements. Infrmatin cntained herein applies t typical instances and may nt address all circumstances.

More information

Touchless Substation Project. Eric Rosenberger, PE Megan Coyle

Touchless Substation Project. Eric Rosenberger, PE Megan Coyle Tuchless Substatin Prject Eric Rsenberger, PE Megan Cyle What is Tuchless Substatin? What is Tuchless Substatin? Deply On-line cnditin mnitring Redefine maintenance prcesses t incrprate new technlgy Prve

More information

Fire Systems. Product Catalogue

Fire Systems. Product Catalogue Fire Systems Prduct Catalgue Index Analgue systems Analgue Cntrl Panels Repeater Cntrl Panels Analgue Detectrs Analgue Mdules Analgue Manual Call Pint Analgue Sunders Analgue Accessries Panels 2 6 8 16

More information

Sensors Monitoring Systems. Crank-Case Protection System (CPS)

Sensors Monitoring Systems. Crank-Case Protection System (CPS) Sensrs Mnitring Systems Dr.E Hrn GmbH & C. KG Im Vgelsang 1 71101 Schönaich Germany Tel: +49 7031 6302-0 inf@dr-hrn.rg DK 005665 Rev. 2 07.04.2017 1/6 Crank-Case Prtectin System (CPS) The Crank-Case Prtectin

More information

Welcome to our world of Quality, Consistency and Reliability.

Welcome to our world of Quality, Consistency and Reliability. Welcme t ur wrld f Quality, Cnsistency and Reliability. Industrial Divisin AN ISO 91 COMPANY Cnsistent Success Stry Alan Electrnic Systems Pvt. Ltd is a well established cmpany in the field f industrial

More information

Policy 1.1-a has been omitted for brevity

Policy 1.1-a has been omitted for brevity 1.1 Managed Grwth Tier System Plicy 1.1-a has been mitted fr brevity Plicy 1.1-b: Tier Re-designatin Criteria: In additin t the criteria fr amending a future land use designatin, the Cunty shall apply

More information

Installation and Operating Instructions

Installation and Operating Instructions Installatin and Operating Instructins Cntents Page 1. INTRODUCTION AND SAFETY WARNINGS 1 2. OPERATING INSTRUCTIONS 2 3. CLEANING INSTRUCTIONS 3 4. TROUBLESHOOTING 4 5. INSTALLATION 5 6. SERVICING and PARTS

More information

USE AND CARE GUIDE 521N.CJIYSTAL CEILIN8 FAN

USE AND CARE GUIDE 521N.CJIYSTAL CEILIN8 FAN USE AN CARE GUIE 521N.CJIYSTAL CEILIN8 FAN Table f Cntents Table f Cntents... 2 Safety Infrmatin... 3 Pre-installatin... 4 Specificatins... 4 Tls Required........ 4 Hardware Included... 5 Package Cntents...........

More information

2 and 4 slice Accents toasters with Pause and Check (certain models only) Please read and keep these instructions

2 and 4 slice Accents toasters with Pause and Check (certain models only) Please read and keep these instructions 2 and 4 slice Accents tasters with Pause and Check (certain mdels nly) Please read and keep these instructins This appliance can be used by children aged frm 8 years and abve and persns with reduced physical,

More information

Capital Improvements 2017 & Beyond

Capital Improvements 2017 & Beyond Capital Imprvements 2017 & Beynd Aarn Yung Executive Directr Last Edited: 10-11-16 The fllwing presentatin utlines; Review: The Prcess Our Cmmitment Master Planning The Future Master Planning: Defined

More information

DX100 Field Maintenance Guide

DX100 Field Maintenance Guide DX100 Field Maintenance Guide This guide has been created t help yu maintain yur DX100 printer s peak perfrmance and quality. It is imprtant t utilize these maintenance prcedure based n yur envirnmental

More information

Electric Cooktop Owners Manual

Electric Cooktop Owners Manual Electric Cktp Owners Manual Installatin Use Maintenance Dear Custmer, We thank yu and cngratulate yu n yur chice. This new carefully designed prduct manufactured with the highest quality materials has

More information

Rationale. Johns Hopkins Safety Manual. Homewood Laser Safety Manual Page 1 of 16

Rationale. Johns Hopkins Safety Manual. Homewood Laser Safety Manual Page 1 of 16 Jhns Hpkins Safety Manual Subject: Last Review Date 6 Nv 2013 Hmewd Laser Safety Manual Page 1 f 16 Ratinale This Laser Safety Manual cntains valuable infrmatin regarding plicies and prcedures fr using

More information

Scopes of Work HVAC Heating and Air Conditioning

Scopes of Work HVAC Heating and Air Conditioning E-BUILDING CODE: Reference current building cdes (IRC 2012; IECC 2009) fr design, installatin and perfrmance minimum requirements. DESIGN REQUIREMENTS: The HVAC Trade Partner shall use the design standards

More information

Istruction Manual OP2

Istruction Manual OP2 New Generatin Cntrl ME.RO S.p.A. INDEX TERMINAL OPERATOR... 2 Terminal peratr structure (n bard f the electrnic generatr)... 3 Remte peratr terminal structure... 4 Op2 cntrl panel... 5 Setting the parameters...

More information

January 10, 2011 PKN0: Mr. Jared White AICP Project Coordinator CITY OF DALLAS 1500 ManIla, Room 6FS Dallas, Texas 75201

January 10, 2011 PKN0: Mr. Jared White AICP Project Coordinator CITY OF DALLAS 1500 ManIla, Room 6FS Dallas, Texas 75201 January 10, 2011 PKN0: 0100 Mr. Jared White AICP Prject Crdinatr CITY OF DALLAS 1500 ManIla, Rm 6FS Dallas, Texas 75201 Re: WINFREY POINT PLANNING STUDY Dallas, Dallas Cunty, Texas Dear Mr. White: Pachec

More information

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW SPRINKLER SYSTEM PLAN REVIEW TENANT IMPROVEMENT PER NFPA EDITION

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW SPRINKLER SYSTEM PLAN REVIEW TENANT IMPROVEMENT PER NFPA EDITION July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW SPRINKLER SYSTEM PLAN REVIEW TENANT IMPROVEMENT PER NFPA 13-2002 EDITION Address: Permit #: Inspectr: Date: Status: Inspectr:

More information

Apartment Manager Fire Safety Manual

Apartment Manager Fire Safety Manual Bise Fire Department Fire Preventin Divisin 333 N. Mark Stall Place Bise, Idah 83704 208-570-6500 Apartment Manager Fire Safety Manual Table f Cntents Page 1- Purpse f Manual Page 2- Fire Prtectin Systems

More information

This procedure applies to all SHA properties and employees, including the SHA office, so far as is reasonably practicable.

This procedure applies to all SHA properties and employees, including the SHA office, so far as is reasonably practicable. Fire Safety Plicy 1 Purpse The purpse f this dcument is t demnstrate hw Sh Husing (SHA) will ensure cmpliance with bth the letter and spirit f all relevant statutry requirements and guidance dcuments and

More information

DFR Pre-Incident Planning Form Instructions. Downtown Dallas Inc

DFR Pre-Incident Planning Form Instructions. Downtown Dallas Inc DFR Pre-Incident Planning Frm Instructins fr Dwntwn Dallas Inc Thank yu fr taking the time t help us prepare in advance fr emergency incidents at yur prperty. The infrmatin yu prvide will be available

More information

P760SS 60 cm Built-under electric double oven

P760SS 60 cm Built-under electric double oven P760SS 60 cm Built-under electric duble ven 20 1 User Manual fr yur Baumatic P760SS Pythagra 60 cm built-under electric duble ven NOTE: This User Instructin Manual cntains imprtant infrmatin, including

More information

City of Bethlehem Northside and Southside

City of Bethlehem Northside and Southside DESMAN DESIGN MANAGEMENT ARCHITECTS STRUCTURAL ENGINEERS DE PLANNERS PARKING CONSULTANTS RESTORATION ENGINEERS DESMAN DE City f Bethlehem Nrthside and Suthside GREEN PARKING CONSULTING DESMAN DESIGN MANAGEMENT

More information

2016 Sales per Product

2016 Sales per Product www.nenvitech.cm Cmpany Prfile Nan Envirnmental Technlgy s.r.l. (N.E.T.) was funded in 2002 with the missin f setting new standards in the gas sensr market; high quality, excellent technical supprt, cmpetitive

More information

ENGINEERING AIR HANDLING PRODUCT. January 2011 CATALOGUE MSA (A)

ENGINEERING AIR HANDLING PRODUCT. January 2011 CATALOGUE MSA (A) ENGINEERING AIR HANDLING PRODUCT January 211 CATALOGUE MSA (A) GENERAL INFORMATION Nrmal Operatin Range The achieved fan perfrmances can differ frm the test perfrmances shwn n the subsequent due t tw

More information

locatewater Sensor 4. Configuring the locatewater sensor on a sensorprobe unit

locatewater Sensor 4. Configuring the locatewater sensor on a sensorprobe unit www.akcp.cm lcatewater Sensr Table f cntents 1. Intrductin 2. Features 3. Cnfiguring the lcatewater sensr 4. Cnfiguring the lcatewater sensr n a sensrprbe unit 5. Cnfiguring the lcatewater sensr n a securityprbe

More information

Fire Safety Procedure. Ref HS v3.1. Status: Approved

Fire Safety Procedure. Ref HS v3.1. Status: Approved Fire Safety Prcedure Ref HS-0001-003 v3.1 Status: Apprved Cntents 1. Purpse... 3 2. Related dcuments... 3 3. Identificatin and Assessment f Risk... 4 3.1. New buildings and schemes... 4 3.2. Implementatin

More information

OTDRs Bi-Directional Testing

OTDRs Bi-Directional Testing OTDRs Bi-Directinal Testing OTDRs Bi-Directinal Testing Dne Crrectly OTDRs Bi-Directinal Testing Presenter Chuck Dykstra, Canadian Prduct Manager Sme Relevant Optical Terms OTDR (Optical Time Dmain Reflectmeter)

More information

University of Delaware

University of Delaware University f Delaware Design & Cnstructin Technical Guidelines Divisin 32: Exterir Imprvements SECTION 32 93 00_Plants and Planting University Cntact: UD Assistant Directr f Grunds: Office (302) 831 2797

More information

CMG GardenNotes #101 IPM and Plant Health Care. Gardening and the Environment. Integrated Pest Management, IPM

CMG GardenNotes #101 IPM and Plant Health Care. Gardening and the Environment. Integrated Pest Management, IPM CMG GardenNtes #101 IPM and Plant Health Care Outline: Gardening and the envirnment, page 1 Integrated Pest Management, IPM, page 1 Plant Health Care, PHC, page 2 PIC cycle, page 2 PHC/IPM techniques,

More information